{"id":40773,"date":"2010-05-21T19:21:35","date_gmt":"2010-05-21T11:21:35","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/sts-132-extensive-evaluations-allow-for-nominal-late-inspection-plan\/"},"modified":"2010-05-21T19:21:35","modified_gmt":"2010-05-21T11:21:35","slug":"sts-132-extensive-evaluations-allow-for-nominal-late-inspection-plan","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/sts-132-extensive-evaluations-allow-for-nominal-late-inspection-plan\/","title":{"rendered":"STS-132: Extensive evaluations allow for nominal Late Inspection plan"},"content":{"rendered":"<p>The Damage Assessment Team (DAT) arm of the Mission Management Team (MMT) are no strangers to high praise for their work in ensuring an orbiter is safe to return home, and once again they have proved their worth \u2013 as they worked through an array of imagery, data, and historical experience to fill in the gaps of imagery coverage related to Atlantis\u2019 Wing Leading Edges (WLE).<\/p>\n<p>STS-132 Status:<\/p>\n<p>Atlantis is coming to the end of her docked phase of the mission, currently her final visit to the International Space Station (ISS), with only three minor Mission Evaluation Room (MER) items, and three \u201cfunnies\u201d \u2013 which points to an extraordinary performance from the vehicle.<\/p>\n<p>With the mission right on the timeline, Atlantis and her crew can look forward to undocking at the weekend, in preparation for a return home next week.<\/p>\n<h4 class=\"widget-title penci-border-arrow\">See Also<\/h4>\n<ul>\n<li>STS-132 Live Coverage<\/li>\n<li>L2&nbsp;STS-132 &nbsp;Section<\/li>\n<li>Click here to Join L2<\/li>\n<\/ul>\n<p>\u201cSTS-132 \u2013 On-Orbit: The mission is going well, all systems are operating nominally. Flight day 7 Activities Completed: Middeck cargo transfer from Atlantis to ISS. MRM-1\/Zarya leak checks and MRM-1 hatch opening for air duct installation. Crew off-duty period. EVA-3 preps, procedure review and campout by Good and Reisman,\u201d summarized the NASA Test Director (NTD) report.<\/p>\n<p>\u201cFlight Day 8: EVA-3 by Good and Reisman, R&amp;R the remaining batteries on P-6 truss. Retrieve spare Power Data Grapple Fixture from the sidewall of Atlantis\u2019 PLB and bring it inside ISS with them. Canadarm-2 returns the Integrated Cargo Carrier (ICC) to the Mobile Base System attachment device.<\/p>\n<p>\u201cWeekend Flight Days 9 and 10 Planned: Canadarm-2 berths the ICC in Atlantis\u2019 PLB, Middeck cargo transfer from Atlantis to ISS and Crew off-duty time. Final Middeck transfers from Atlantis to ISS, Rendezvous tools checkout, Crew news conference and farewells, Centerline camera installation and Atlantis un-dock and flyaround final separation from ISS.\u201d<\/p>\n<p>The only addition to the items of interest at the MER related to the Payload and General Support Computer (PGSC), again a relatively minor issue with zero mission impact.<\/p>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p>\u201cMER Items: No new. Funnies: PGSC Monitor Lexan Filter Cracked \u2013 Crew reported that the RPOP1 PGSC monitor filter was cracked, but no loose parts as a result of the crack,\u201d added status, with a full overview article on Atlantis\u2019 systems to be published at the weekend.<\/p>\n<p>STS-132 Specific Articles: http:\/\/www.nasaspaceflight.com\/tag\/sts-132\/<\/p>\n<p>Evaluating Inspection Requirements:<\/p>\n<p>With the repair of the OBSS\u2019 Pan Tilt\/Unit (PTU) confirmed, the need for inspections whilst docked with Station \u2013 to double check areas lacking full coverage during the gathering of Flight Day 2\u2019s imagery \u2013 was dismissed as an option by the MMT, allowing for a nominal Late Inspection of Atlantis\u2019 Thermal Protection System (TPS),<\/p>\n<p>However, getting to the stage where ascent related damage concerns were allayed, took a little more work than the usual diligence and hard work of the DAT and related SSP (Space Shuttle Program) engineers.<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignleft size-full wp-image-14739\" title=\"A8\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2010\/05\/A85.jpg\" alt=\"\" width=\"334\" height=\"229\">This was due a mix of several issues related to the imagery coverage, via the lack of LDRI (Laser Dynamic Range Imager) imagery on areas of the Wing Leading Edges (WLE), shadowing of the RCC panels during FD3\u2019s RPM, along with a potential impact on panel 6R \u2013 picked up by the WLE IDS (Impact Detection System).<\/p>\n<p>The wording may appear dramatic, though this is usual for engineering discussions, given the work ethic of evaluating to the worst case scenario as a safety net for margins of error.<\/p>\n<p>\u201cWLEIDS registered 1 potentially critical ascent impact on the WLE. Likelihood of critical damage due to this impact is assessed at ~1 in 20,000,\u201d noted one of several presentations on the status of inspection data for Atlantis (available on L2).<\/p>\n<p>\u201cWLEIDS is unlikely to produce \u2018false negatives\u2019. That is to say based on test, analysis and flight experience with the WLEIDS, it is unlikely that we were critically hit and did not measure the response (~1 in 1000 likelihood of false negative given potential for max Q signal masking).\u201d<\/p>\n<p>Indications from the WLEIDS are usual for every mission, but it is also commonplace for the indications to be caused by vibrations in the panels during ascent \u2013 such is the sensitivity level of the sensors.<\/p>\n<p>In order to dismiss actual impacts, engineers rely not only on the imagery of the panels during inspections, but the ascent imagery footage \u2013 in order to cross-reference debris liberations with potential impacts.<\/p>\n<p>\u201cWhile the available imagery data does not meet the inspection requirements for much of the WLE RCC surface area, large, ascent related critical damages are expected to be observable,\u201d added the presentation, noting it would be obvious if damage was sustained by a panel.<\/p>\n<p>\u201cNetwork of narrow, but long cracks and coating loss are expected for critical damage due to foam or ice impact. Critical damages below the inspection criteria are only expected to be produced by high density debris sources such as metal or ablator. These are NOT expected debris sources.\u201d<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-14736\" title=\"a3\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2010\/05\/a3.jpg\" alt=\"\" width=\"350\" height=\"230\">Two liberation events were evaluated as potential for causing the 6R panel indication, one on the right Solid Rocket Booster (SRB) \u2013 tagged as debris source 132-006, and another from a LO2 IFR (Ice Frost Ramp) \u2013 tagged as debris source 132-026 \u2013 on the top of the External Tank.<\/p>\n<p>\u201cSRB recovery report indicated no unexpected debris losses. All available ground based, ET and crew handheld imagery yielded a total of seven foam impactors which potentially have transport to the WLE\/nosecap RCC. No imagery observations of debris contact with the WLE\/nosecap RCC. Popcorn foam impacts are likely, but not likely to result in critical RCC damage.<\/p>\n<p>\u201cA DTA (Debris Transport Analysis) of these seven sources was performed and compared with RCC impact tolerance thresholds. NDE (Non Destructive Evaluation) detectable damage is not credible for 5 of the 7 debris sources (-005, -011, -012, -013, -024). Assuming an impact and worst case release time, NDE detectable damage is not probable for potential debris source 132-006.\u201d<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-14737\" title=\"A6\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2010\/05\/A68.jpg\" alt=\"\" width=\"342\" height=\"239\">The ET IFR foam loss can be seen in hi res images of the tank after separation, although it is \u2013 like the rest of the tank \u2013 only one of a very small number of minor liberations from what was an extremely \u2018clean\u2019 tank. Regardless, nothing is ever left to chance with regards to liberation events.<\/p>\n<p>\u201cAssuming an impact, worst case release time and that the observed loss liberates as one mass, NDE detectable damage would be expected on STBD (Starboard) panels 5-19 due to debris source 132-026. Impacts from -026 on STBD panels 1-4 and 20-22 would be below the impact tolerance capability,\u201d added the presentation, which added that the foam loss from the IFR might even be simple \u2018erosion\u2019 of the surface foam, which is common for the ramps.<\/p>\n<p>\u201cFor 132-026, max impact velocity would be expected to cause NDE detectable damage. Exceeds mean capability for panels 8 to 12 by 50 to 100 fps, and is at or below mean capability for panels 1 to 7 &amp; 13 to 22<\/p>\n<p>\u201cIndication is assumed to be a foam release, imagery still working to determine if this is a release event or erosion. Assumes impact occurs at worst time because release time is unknown.\u201d<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-14738\" title=\"A5\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2010\/05\/A513.jpg\" alt=\"\" width=\"321\" height=\"222\">In conclusion, the presentation confirmed the findings did not warrant any concern of a damaging impact on the RCC panels \u2013 especially in relation to the IFR foam loss, as they tend to break apart, as opposed to liberating in one piece \u2013 thus removing any need to inspect the WLE via a docked inspection.<\/p>\n<p>\u201cGiven all available debris related data sources, the likelihood of critical damage is low. No observed critically damaging SRB debris. No likely critical WLEIDS indications. No likely critical impacts due to known ET sources on the WLE port or STBD panels 1-4 and 20-22.<\/p>\n<p>\u201cSTBD panels 5-19 could experience a critical impact if the -026 debris source struck as one mass. Preliminary assessment is that the divot was formed due to erosion\/ablation and so would not pose a critical damage threat.\u201d<\/p>\n<p>Another sign of how prepared the Program engineers are for contingencies can be seen via later pages in the presentation, which had already pre-empted plans for a NOAX repair to the RCC panel, had data \u2013 or later imagery \u2013 shown there was indeed damage to the panel.<\/p>\n<p>That option remains \u2013 as does returning to the ISS \u2013 if a serious problem is found via Late Inspections, inspections which will finally gain the full use of the LDRI following the PTU repair, allowing for DAT engineers on the ground to once again carry out their methodical Level I, Level II and peer reviews, prior to the final clearance for Atlantis to return home safely.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Damage Assessment Team (DAT) arm of the Mission Management Team (MMT) are no strangers to high praise for their work in ensuring an orbiter is safe to return home, and once again they have proved their worth \u2013 as they worked through an array of imagery, data, and historical experience to fill in the [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":29548,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[9171,3485,7935],"class_list":["post-40773","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-dat","tag-sts-132","tag-tps"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/40773"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=40773"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/40773\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media\/29548"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=40773"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=40773"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=40773"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}