{"id":40842,"date":"2010-03-17T23:03:55","date_gmt":"2010-03-17T15:03:55","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/cxp-pdr-successful-with-exclusions-strict-commercial-requirements\/"},"modified":"2010-03-17T23:03:55","modified_gmt":"2010-03-17T15:03:55","slug":"cxp-pdr-successful-with-exclusions-strict-commercial-requirements","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/cxp-pdr-successful-with-exclusions-strict-commercial-requirements\/","title":{"rendered":"CxP PDR successful, with exclusions \u2013 Strict Commercial requirements"},"content":{"rendered":"<p>As the Constellation Program (CxP) splutters along, ahead of its \u201cproposed\u201d cancellation, managers have successfully concluded its Preliminary Design Review (PDR), although several major elements \u2013 such as cost and schedule \u2013 were omitted from the review due to the \u201cnew direction\u201d. Meanwhile, NASA managers preparing a draft document to prospective commercial crew providers, listing 31 high level requirements.<\/p>\n<p>Constellation PDR:<\/p>\n<p>The entire Constellation Program remains in limbo, as the FY2011 budget proposal undergoes a Congressional battle to \u2013 at the very least \u2013 refine specific goals and timelines.<\/p>\n<p>The Ares vehicles are highly unlikely to return as per the POR (Program Of Record) via any refined plan, with lawmakers currently focusing on a shuttle extension, tied in with a Heavy Lift Launch Vehicle (HLV) \u2013 as outlined in the \u201cHuman Space Flight Capability Assurance and Enhancement Act of 2010\u201d Bill.<\/p>\n<h4 class=\"widget-title penci-border-arrow\">See Also<\/h4>\n<ul>\n<li>Augustine Forum Section<\/li>\n<li>L2 Ares\/HLV\/Orion Sections<\/li>\n<li>Click here to Join L2<\/li>\n<\/ul>\n<p>However, until the FY2011 proposal is approved by Congress, elements of Constellation remains alive, as seen with the completion of the PDR process this month.<\/p>\n<p>\u201cAfter a week of pre-boards and boards, the CxP PDR was successfully completed,\u201d noted MOD\u2019s 8th Floor News address (L2). \u201cAll board members including independent review teams, voted to continue to the CDR (Critical Design Review).\u201d<\/p>\n<p>Interestingly, the PDR wasn\u2019t as \u201ccomplete\u201d as previously planned, with the omission of several major Orion and Ares elements from the review.<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignleft size-full wp-image-13916\" title=\"A3\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2010\/03\/A314.jpg\" alt=\"\" width=\"333\" height=\"258\">\u201cThere were some areas of the design that we noted as still not at a PDR level of design. Those areas were Software (since claimed as complete via sources), CPAS (CEV Parachute Assembly System), and Upper Plane Isolator\/LOX Damper designs (to mitigate Thrust Oscillation),\u201d added the 8th Floor.<\/p>\n<p>Aerospace &amp; Defense<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Space tourism guides<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>NASA mission updates<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p>\u201cThe Board concurred that there are acceptable plans in place for FY10 to mature these specific designs.<\/p>\n<p>\u201cAdditionally, the Ares Upper Stage\/First Stage Separation Implementation will have a further assessment of zero fault tolerant versus one fault tolerant design.\u201d<\/p>\n<p>Also of interest were notes about the infamous Loss Of Crew (LOC) and Loss Of Mission (LOM) numbers, which have often been cited against the Commercial Crew options, and even Shuttle, during claims about astronaut safety. No specifics on the issues with the numbers are noted in the memo, other than \u201cpoke-outs\u201d require further work.<\/p>\n<p>\u201cAnother concern is the LOC\/LOM requirements are not met for ISS (International Space Station) missions. The current estimates for LOC\/LOM are within the error band of analysis, but additional work on specific LOC\/LOM poke-outs will be analyzed.\u201d<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-13921\" title=\"A8\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2010\/03\/A83.jpg\" alt=\"\" width=\"121\" height=\"301\">Furthermore, two of the largest issues found with the Constellation Program \u2013 as per the Augustine Committee\u2019s review into Human Space Flight \u2013 were also omitted from the review, based on the proposed forward plan to cancel the Constellation Program.<\/p>\n<p>\u201cIt was also noted that (requirements) require the cost and schedule criteria be met. Due to the new direction, cost and schedule were not included in this review,\u201d added the 8th Floor. \u201cCost and schedule will be addressed at a future key decision point.\u201d<\/p>\n<p>Despite these omissions from the PDR \u2013 any one of which may have resulted in an unsuccessful review \u2013 managers noted their pleasure in completing the process, noting the PDR was a \u201chome run\u201d for the Constellation Program.<\/p>\n<p>\u201cThe final results showed that we have a sound design, and it is overall at a PDR level of maturity. We understand our risks and have good resolution plans for any open technical issues,\u201d noted one Engineering manager in a memo (L2) to Ares manager Jeff Hanley and his team.<\/p>\n<p>\u201cThe board was unanimous in concurring that we are ready to proceed towards CDR. In short, the team hit a home run!\u201d<\/p>\n<p>However, it was admitted that the future is uncertain, with Orion no longer in NASA\u2019s hands, along with the challenges of a FY2010 operating plan which is currently the final year for CxP.<\/p>\n<p>\u201cI know that many of you are wondering what comes next. We have been directed to continue implementing the FY2010 operating plan. You also all know that we have challenges in FY2010 due to losing the Orion cost share, etc. Of course, there are multiple ways to attack the problem, and in order to be effective the program needs to do it in an integrated manner. More to come.\u201d<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-13923\" title=\"A9\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2010\/03\/A93.jpg\" alt=\"\" width=\"327\" height=\"213\">For the interim, the forward path continues to point towards at least one more drop test \u2013 the \u201cDrogue Chute Test 3\u201d in April, a PDR for the Constellation Training Facility (CxTF) and the aforementioned CDR.<\/p>\n<p>\u201cCxTF PDR Kick-Off (started) March 9, the Constellation Training Facility started its PDR cycle,\u201d added the 8th Floor. \u201cThe CxTF team will show the entrance criteria and conduct tours of the facility. The PDR will conclude in mid June.<\/p>\n<p>\u201cCxTF is the last level 4 PDR leading up to the MOD PDR scheduled for July. The Mission Control Center System (MCCS) recently finished PDR and the Mission Operation RECON System (MORS) team is currently in their PDR cycle.\u201d<\/p>\n<p>Commercial Crew Requirements:<\/p>\n<p>As has been stressed before and after President Obama\u2019s forward plan for NASA was revealed, handing over crew transportation duties to the commercial sector must follow strict NASA guidelines on crew safety.<\/p>\n<p>Although the likes of the United Launch Alliance (ULA) have been claiming for some time that they are more than capable of fulfilling such requirements, issues such as abort-related \u201cBlack Zones\u201d have often been cited by detractors within NASA, despite ULA\u2019s documented evidence that such issues have already been addressed.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-13918\" title=\"A7\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2010\/03\/A78.jpg\" alt=\"\" width=\"310\" height=\"276\">However, now the FY2011 proposal orders NASA to leave the business of human transport to LEO (Low Earth Orbit), NASA managers are closing in on a documented list of requirements, which commercial crew suitors will be tasked with showing their compliance.<\/p>\n<p>\u201cThere was a meeting of the Human Rating Requirements Steering Team. This is a NASA-wide team to tailor the NASA Human Rating Requirements for commercial space systems,\u201d as listed in a recent Shuttle Standup\/Integration Report note (L2). \u201cThe steering team will mandate standards and processes to ensure the safety of crew members.\u201d<\/p>\n<p>Work should be completed on the document in the Spring, leading to a Request For Information (RFI) being sent out for feedback. Currently, the document cites 31 \u201chigh-level\u201d requirements that a commercial carrier must adhere to.<\/p>\n<p>\u201cA draft document of these requirements will be released within the next two months, with an RFI to the aerospace industry for feedback. There are 31 high-level requirements,\u201d added the Standup note. \u201cThese will be solidified at an Agency DPMC (Directorate Program Management Council).\u201d<\/p>\n<p><em>L2 members<\/em><em>&nbsp;<\/em><em>:&nbsp;Documentation \u2013 from which the above article has quoted snippets \u2013 is available in full in the related L2 sections, now over 4500 gbs in size<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>As the Constellation Program (CxP) splutters along, ahead of its \u201cproposed\u201d cancellation, managers have successfully concluded its Preliminary Design Review (PDR), although several major elements \u2013 such as cost and schedule \u2013 were omitted from the review due to the \u201cnew direction\u201d. Meanwhile, NASA managers preparing a draft document to prospective commercial crew providers, listing [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[7796,8184],"class_list":["post-40842","post","type-post","status-publish","format-standard","hentry","category-news","tag-commercial","tag-sls-orion"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/40842"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=40842"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/40842\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=40842"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=40842"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=40842"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}