{"id":40848,"date":"2010-03-09T22:02:43","date_gmt":"2010-03-09T14:02:43","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/sts-131-into-frrs-managers-check-manifest-status-ahead-of-april-decision\/"},"modified":"2010-03-09T22:02:43","modified_gmt":"2010-03-09T14:02:43","slug":"sts-131-into-frrs-managers-check-manifest-status-ahead-of-april-decision","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/sts-131-into-frrs-managers-check-manifest-status-ahead-of-april-decision\/","title":{"rendered":"STS-131 into FRRs \u2013 Managers check manifest status ahead of April decision"},"content":{"rendered":"<p>Shuttle and International Space Station (ISS) managers have been busy discussing the launch dates for what&nbsp;are currently the final flights of the manifest, although STS-131 remains on track for April 5. With STS-134\u2019s Alpha Magnetic Spectrometer (AMS) issue now confirmed to be a thermal leak observed during ongoing testing in Holland, STS-132 and STS-133 have both undergone schedule evaluations.<\/p>\n<p>STS-131 Latest:<\/p>\n<p>Discovery hasn\u2019t suffered from any notable issues since arriving at Pad 39A, as she patiently awaits the loading of hypergolics during the second half of this week.<\/p>\n<p>\u201cLast week, completed the TCDT (Terminal Countdown Demonstration Test); it went well. Had the FRT (Flight Readiness Test) on Saturday. This week, will be working hyper-load preps. Will begin hyper-load Thursday and Friday,\u201d noted Ground Operations via the Shuttle Standup\/Integration report (L2).<\/p>\n<h4 class=\"widget-title penci-border-arrow\">See Also<\/h4>\n<ul>\n<li>STS-131 LIVE UPDATES<\/li>\n<li>L2 STS-131 Special Section<\/li>\n<li>Click here to Join L2<\/li>\n<\/ul>\n<p>This was expanded on via the NASA Test Director (NTD) report, which has so far only listed an extremely low count of 29 Interim Problem Reports (IPRs) for Discovery since she returned from STS-128 \u2013 the latest relating to an unexplained error on a General Purpose Computer (GPC). Otherwise, all is well with the pad flow.<\/p>\n<p>\u201cOV-103 \/ ET-135 \/ SRB BI-142 \/ RSRM 110 (Pad A): Helium Signature Test and Ball Seal Leak checks were successfully completed Monday. GH2\/GO2 blank off plate removals are planned through to Wednesday. S0009: First motion checks and ET camera functional were completed.<\/p>\n<p>\u201cV1149 Orbiter\/ET cavity purge verification and T-0 QD (Quick Disconnect) leak checks are planned, (leading into) S0024 Hypergolic servicing preps (which) continue through Wednesday. CTS (Call to Stations) for S0024 servicing is scheduled for 2200 EST Wednesday night.\u201d<\/p>\n<p>Wednesday marks another milestone for STS-131, as managers meet at the Johnson Space Center (JSC) for the SSP (Space Shuttle Program) FRR (Flight Readiness Review). The SSP FRR is usually conducted over two days.<\/p>\n<p>Space Shuttle<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Technology News<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>SpaceX<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p>\u201cHave a good week of work ahead of us. The progress towards STS-131 appears good. Folks are doing a great job, and vehicle processing is going well, as well as it is for the other vehicles. We are in great shape,\u201d noted manager LeRoy Cain \u2013 co-chair of the Mission Management Team (MMT).<\/p>\n<p>STS-131 Specific Articles: http:\/\/www.nasaspaceflight.com\/tag\/sts-131\/<\/p>\n<p>No major items of interest have been flagged ahead of the FRR, although some data points will be deferred through to the Agency level FRR \u2013 which sets the launch date \u2013 later this month.<\/p>\n<p>\u201cHad TIM (Technical Interchange Meeting) at MAF (Michoud Assembly Facility) last Thursday on Probabilistic Risk Assessments (PRAs) for intertank foam,\u201d noted comments on the Standup report. \u201cCame to conclusion that could do credible PRA for RCC (Reinforced Carbon Carbon) and special tile, but did not have models to do tile shear-out or tile.<\/p>\n<p>\u201cFor the FRR on Thursday, will not have any PRA numbers, but for the Agency FRR, will have RCC and special tile PRAs and will have flight rationale.\u201d<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignleft size-full wp-image-13814\" title=\"A3\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2010\/03\/A37.jpg\" alt=\"\" width=\"331\" height=\"246\">This reference again notes the continuing evaluations into the intertank foam losses observed on recent flights. This is not likely to be a concern for managers at the FRR, as noted in the STS-130 IFA (In Flight Anomaly) review of External Tank (ET-134).<\/p>\n<p>\u201cSummary: Preliminary assessment of ET flight performance on STS-130 complete. 21 total losses observed on intertank acreage evaluated. The performance of the intertank is not meeting the design intent, but is within our expectations considering the issue we believe we have,\u201d noted one of 15 STS-130 IFA presentations available on L2.<\/p>\n<p>\u201cTo support integrated flight rationale to be provided by SE&amp;I (Systems Engineering and Integration), additional bond adhesion tests were approved and successfully performed in debris critical locations as defined by SE&amp;I. All other systems performed nominally.\u201d<\/p>\n<p>With only three IFAs in total for STS-130, STS-131\u2019s FRR process will have little to discuss by way of previous flight items of interest. As such, STS-131 is continuing to track an April 5 launch date target.<\/p>\n<p>\u201cSTS-131 is on track for April 5th launch. There are no anticipated range conflicts up to the beta cutout (launch beta cutout 4\/15-4\/29),\u201d noted a Tuesday memo outlining the status of the near and long term manifest. \u201cEven though SpaceX has the range on 4\/12, they won\u2019t be a conflict for subsequent launch attempts because they are using our SRB recovery ships. So if we incrementally slip through the April window, they slip.\u201d<\/p>\n<p>Manifest Evaluations:<\/p>\n<p>Centered around the test problems with AMS, the final scheduled trio of shuttle flights are somewhat at the mercy of an April data point relating to STS-134, when engineers in Holland will overview what will have been the conclusion of highly complex testing.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-13815\" title=\"A4\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2010\/03\/A47.jpg\" alt=\"\" width=\"325\" height=\"254\">\u201cSTS-132 mission, Atlantis: Pad turnaround from STS-131 will support 5\/14 launch date with a few days of margin. There are some range conflicts to work but we expect to have the range for the 14th, 15th, and maybe the 16th. Assuming (Soyuz TMA) 21S undock on 6\/2 (current plan), we have launch opportunities through 5\/21 before we enter a \u2018Dual Docked Ops cutout\u2019,\u201d added the schedule overview memo.<\/p>\n<p>\u201cIf AMS slips out past 133 and we launch 131 in May, they will either use 133 \u2018fly the next flight\u2019 for LON (Launch On Need) \u2013 CSCS (Crew Shuttle Contingency Support) duration is adequate depending on the assumptions made \u2013 or fly 134 with AMS regardless of the thermal test results and round trip it if necessary. This means we no longer need to evaluate flying an empty cargo bay for the LON.\u201d<\/p>\n<p>The fine balance of finding acceptable launch slots for the shuttle missions \u2013 when playing musical chairs with other visiting vehicles, beta angle cutouts and range availability \u2013 had led to evaluations into slipping STS-132 into June or July. However, STS-132 remains on track for May, and that is likely to remain the case for the coming weeks at least.<\/p>\n<p>\u201cThere has been some discussion of moving STS-132 to June or even July if AMS slips out past 133 to more evenly space out the flights and avoid a large gap between 132 and 133,\u201d added the memo.<\/p>\n<p>\u201cThere is a launch beta cutout from 6\/12 to 7\/1. If we launched between 6\/8 and the beta cutout on 6\/12, we would be in a dual docked ops scenario with 23S docking, which is still an option.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-13819\" title=\"A6\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2010\/03\/A64.jpg\" alt=\"\" width=\"321\" height=\"238\">\u201cLaunching STS-132 in July is bad from ISSP\u2019s (International Space Station Program) perspective because after (Russian Progress) 38P arrives on 6\/30, all the RS (Russian Segment) ports are utilized and there would be no place to install MRM1.<\/p>\n<p>\u201cAlthough (ISS Manager) Mike Suffering said he could work with the Russians to support STS-132 in July, there was general agreement that we would not plan to fly STS-132 in July.\u201d<\/p>\n<p>As noted previously by NASASpaceflight.com, decisions on the final three flights will be made next month, based on the full AMS test results.<\/p>\n<p>\u201cThe decision on whether to slip STS-132 from 5\/14 into June will be made in mid-April after STS-131 is off the pad and after AMS has insight into the thermal test results,\u201d the memo continued.<\/p>\n<p>\u201cThe decision will be made before 4\/13 since this is when Atlantis is rolled to the VAB (Vehicle Assembly Building) and SSP would prefer to stay in the OPF (Orbiter Processing Facility) if launch is going to be delayed to June. I expect that we\u2019ll stay with the May 14th launch date assuming everything goes well with STS-131.\u201d<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-13817\" title=\"A7\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2010\/03\/A74.jpg\" alt=\"\" width=\"322\" height=\"229\">Full specifics on the exact problem with AMS are yet to be noted on SSP documentation, although the scheduling memo did note a \u201cthermal leak\u201d is key to the concerns the mission may be delayed.<\/p>\n<p>Should that become the case, STS-133 will fly before AMS, although this mission cannot be brought forward on the schedule due to the processing timeline of the Permanent Logistics Module (PLM), set to remain docked to the ISS as an additional module.<\/p>\n<p>\u201cSTS-133 mission, Discovery: The station processing mission manager reported that the PLM will be at least two weeks late to the pad. They are modifying the MPLM flown on STS-131\/19A (Leonardo) to become the PMM and the schedule is very tight. The two week delay does not account for an Edwards landing so it gets worse if STS-131 doesn\u2019t land at KSC.<\/p>\n<p>\u201cHowever, Mr Suffredini made it clear that the PLM will be ready on time. He mentioned they are looking at using a different MPLM (Multi-Purpose Logistics Module) (probably Raffaello) but regardless they\u2019ll be ready when SSP needs them to be ready. No further work required to evaluate accelerating STS-133.\u201d<\/p>\n<p>STS-133 is also highly likely to be reduced to a four person crew over the coming mission evaluation cycles.<\/p>\n<p>Further information is expected on the status of AMS ahead of the April decision point, although the over-riding focus remains on successfully carrying out STS-131 prior to any decisions on the downstream manifest.<\/p>\n<p><em>L2 members<\/em><em>&nbsp;<\/em><em>:&nbsp;Documentation \u2013 from which the above article has quoted snippets \u2013 is available in full in the related L2 sections, now over 4500 gbs in size<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Shuttle and International Space Station (ISS) managers have been busy discussing the launch dates for what&nbsp;are currently the final flights of the manifest, although STS-131 remains on track for April 5. With STS-134\u2019s Alpha Magnetic Spectrometer (AMS) issue now confirmed to be a thermal leak observed during ongoing testing in Holland, STS-132 and STS-133 have [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[9184,3485,9051,3366],"class_list":["post-40848","post","type-post","status-publish","format-standard","hentry","category-news","tag-sts-131","tag-sts-132","tag-sts-133","tag-sts-134"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/40848"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=40848"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/40848\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=40848"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=40848"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=40848"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}