{"id":40857,"date":"2010-02-26T22:33:39","date_gmt":"2010-02-26T14:33:39","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/sts-131-mated-as-schedule-crunch-pressures-downstream-launch-manifest\/"},"modified":"2010-02-26T22:33:39","modified_gmt":"2010-02-26T14:33:39","slug":"sts-131-mated-as-schedule-crunch-pressures-downstream-launch-manifest","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/sts-131-mated-as-schedule-crunch-pressures-downstream-launch-manifest\/","title":{"rendered":"STS-131 mated as \u201cschedule crunch\u201d pressures downstream launch manifest"},"content":{"rendered":"<p>Discovery and External Tank ET-135 have completed mating operations with no issues reported, as STS-131 continues to enjoy a smooth flow towards rollout next week. Meanwhile, STS-132\u2019s ET-136 is due to arrive at the Kennedy Space Center (KSC) early next week, as managers discuss the \u201cschedule crunch\u201d of the final three \u201cscheduled\u201d shuttle missions.<\/p>\n<p>STS-131 Processing Latest:<\/p>\n<p>ET\/Orbiter mate operations are conducted over two to three days, as engineers work on the precise tensions for the mating of the LH2 and LO2 studs on either side of aft part of the tank with the orbiter. This process can sometimes be problematic, though STS-131\u2019s mating operations were completed without a hitch.<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignleft size-full wp-image-13677\" title=\"a24\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2010\/02\/a241.jpg\" alt=\"\" width=\"255\" height=\"224\">\u201cOV-103 \/ ET-135 \/ SRB BI-142 \/ RSRM 110 (VAB HB-3) Orbiter\/ET Mate operations: ET Separation Camera installation is complete. LH2 and LO2 Stud closeouts are complete. LH2 and LO2 monoball installation\/electrical mates and closeouts are complete,\u201d noted NASA Test Director (NTD) end of week processing information on L2.<\/p>\n<p>\u201cLH2 and LO2 purge curtain installation continues. LH2 and LO2 main sep container installation, umbilical closeout lids, and flight strut installation completed.\u201d<\/p>\n<p>In tandem with the mating operations, preparations were started on Friday for the Shuttle Interface Test \u2013 where engineers check the associated interfaces between the mated hardware that makes up the shuttle stack.<\/p>\n<p>\u201cShuttle Interface Test operations: Preps were kicked off Thursday and continued through 3rd shift Friday (Saturday morning). Call-To-Stations 0900 EST Friday morning. Weekend Work: Orbiter\/ET mate operations, Shuttle Interface Testing, and preps associated with the SSV (Space Shuttle Vehicle) move to Pad-A.\u201d<\/p>\n<p>Currently, STS-131 is set to depart the Vehicle Assembly Building (VAB) at just after midnight on Tuesday morning, for arrival at Pad 39A just after dawn. Preparations for launch at the pad complex have already begun.<\/p>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p>\u201cCall-to-stations for rollout to Pad A is scheduled for Monday at 2000 EST; first motion is scheduled for 0001 EST on Tuesday,\u201d added the NTD report. \u201cPad-A: LOX Storage Tank replenishment was completed as scheduled yesterday; four waves (five tankers each) were delivered. UPDATE: Rollout delayed 24 hours due to unacceptable weather.<\/p>\n<h4 class=\"widget-title penci-border-arrow\">See Also<\/h4>\n<ul>\n<li>STS-131 LIVE UPDATES<\/li>\n<li>L2 STS-131 Special Section<\/li>\n<li>Click here to Join L2<\/li>\n<\/ul>\n<p>\u201cAPU (Auxiliary Power Unit) Fuel Cart transfer\/lift from the Fuel Farm to the 135\u2032-level is inwork. LH2 Storage Tank replenishment Friday; two waves (five tankers each) are scheduled for delivery.\u201d<\/p>\n<p>Should Discovery rollout early in the week, over a week\u2019s worth of contingency exists in the flow to support the realigned April 5 launch date \u2013 which was delayed from March due to unacceptable temperatures for Discovery\u2019s rollover from her Orbiter Processing Facility (OPF) to the VAB, along with a Dual Docked Operations (DDO) constraint with a Russian Soyuz.<\/p>\n<p>STS-131 Specific Articles: http:\/\/www.nasaspaceflight.com\/tag\/sts-131\/<\/p>\n<p>\u201cThe STS-131\/19A launch date move to April 5 was avoid any further issues with the abnormal cold spell the KSC team has been dealing with. After much discussion and several options, this was chosen as the most prudent and safest approach,\u201d added Space Shuttle Program (SSP) manager John Shannon on a recent Shuttle Standup\/Integration report (L2).<\/p>\n<p>Mr Shannon also noted that April 5 will allow for enough time for the preparations to take place for the following mission \u2013 STS-132.<\/p>\n<p>\u201cThe date of April 5 was chosen to ease the approach into the STS-132\/ULF4 mission \u2013 even though this will force many to travel to KSC on Easter Sunday. The team agreed that this date was best, rather than a later date, to avoid scheduling conflicts with the follow-on mission.<\/p>\n<p>\u201cThis new launch date allows the SSP two weeks after its FRR (Flight Readiness Review) to work any issues that may arise, prior to the Agency FRR.\u201d<\/p>\n<p>STS-132 Processing Latest:<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-13678\" title=\"A2\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2010\/02\/A223.jpg\" alt=\"\" width=\"242\" height=\"229\">With the current manifest showing four mission prior to the end of summer, a \u201cschedule crunch\u201d may result in some realignment \u2013 which was expected, and moreover allowed for \u2013 with funding allowing for a manifest stretch as far as the first quarter of 2011, should it be required.<\/p>\n<p>\u201cThere was discussion concerning STS-132\/ULF4, because it may be put into a schedule crunch with the follow-on mission,\u201d added Mr Shannon. \u201cFor now, it will remain at the current launch date of May 14. This will allow for the integration work that remains to be completed for STS-133\/ULF5 and STS-134\/ULF6.<\/p>\n<p>\u201cFrom a processing standpoint, everything is going great. The entire team is doing the right stuff and making the right decisions. The last two flights have been some of the best in the history of the SSP and it has been a joy to watch the team execute this mission.\u201d<\/p>\n<p>As noted by Mr Shannon, all three orbiters are enjoying a smooth processing flow, with Endeavour easing through what is currently her final flow with STS-134 \u2013 following her recent return from the highly successful STS-130 mission to the International Space Station (ISS).<\/p>\n<p>Atlantis, meanwhile recently completed the milestone of SSME (Space Shuttle Main Engine) installation \u2013 with only a few minor issue recently noted, one relating to a thruster quantity gauge and another relating to a cable that was replaced after payload premate operations.<\/p>\n<p>\u201cOrbiter: OV-104 (OPF Bay 1): IPR (Interim Problem Report)-13 (electrical connector pin resistance reading infinite): problem was isolated to a defective cable and the recessed pin was repaired. Payload premate testing is complete including the retest of the IPR-0013,\u201d noted NTD processing information.<\/p>\n<p>\u201cOMS\/RCS redundant electrical circuit verification is complete. Picked up a PR (Problem Report) on the Panel O3 OMS\/RCS quantity gauge display; the \u2018ones\u2019 digit is not visible. Pre-ops supporting WCS (Waste Containment System) Functional were completed; WCS Functional is scheduled to begin.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-13679\" title=\"A3\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2010\/02\/A323.jpg\" alt=\"\" width=\"294\" height=\"214\">\u201cSSME to orbiter electrical interface connector mate operations are complete. SSME\/MPS (Main Propulsion System) integrated testing picked up Thursday and continues.<\/p>\n<p>\u201cOBSS (Orbiter Boom Sensor System) End Effector premate test began Thursday. OBSS thermistor interface test and the OBSS Keep Alive Test are complete. Assembly power converter unit (APCU) IVT is began Friday. Weekend Work: TPS (Thermal Protection System) work in various locations.\u201d<\/p>\n<p>As STS-132 processing ramps up, stacking of STS-132\u2019s Solid Rocket Boosters (SRBs) is scheduled to begin on March 3. The boosters will begin to rise from the Mobile Launch Platform (MLP) in High Bay 1 of the VAB.<\/p>\n<p>Meanwhile, ET-136 is scheduled to arrive on Monday or Tuesday of next week, following its departure from the Michoud Assembly Facility (MAF) in New Orleans. The tank is on a five day journey inside the Pegasus barge, towed by the Liberty Star.<\/p>\n<p>\u201cBI-143 \/ RSRM 111 (Surge 1): The team continues to work toward stacking operations to begin 3\/3 in VAB HB-1,\u201d confirmed processing information. \u201cET-136 (Liberty Star\/Pegasus): ET-136 is en route aboard the Pegasus barge; arrival at Port Canaveral will be either Monday or Tuesday next week.\u201d<\/p>\n<p><em>L2 members<\/em><em>&nbsp;<\/em><em>:&nbsp;Documentation \u2013 from which the above article has quoted snippets \u2013 is available in full in the related L2 sections, now over 4500 gbs in size<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Discovery and External Tank ET-135 have completed mating operations with no issues reported, as STS-131 continues to enjoy a smooth flow towards rollout next week. Meanwhile, STS-132\u2019s ET-136 is due to arrive at the Kennedy Space Center (KSC) early next week, as managers discuss the \u201cschedule crunch\u201d of the final three \u201cscheduled\u201d shuttle missions. STS-131 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[9184,3485],"class_list":["post-40857","post","type-post","status-publish","format-standard","hentry","category-news","tag-sts-131","tag-sts-132"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/40857"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=40857"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/40857\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=40857"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=40857"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=40857"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}