{"id":40866,"date":"2010-02-16T00:05:41","date_gmt":"2010-02-15T16:05:41","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/sts-131-cold-weather-delays-flow-ddo-constraint-pushes-launch-into-april\/"},"modified":"2010-02-16T00:05:41","modified_gmt":"2010-02-15T16:05:41","slug":"sts-131-cold-weather-delays-flow-ddo-constraint-pushes-launch-into-april","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/sts-131-cold-weather-delays-flow-ddo-constraint-pushes-launch-into-april\/","title":{"rendered":"STS-131: Cold weather delays flow \u2013 DDO constraint pushes launch into April"},"content":{"rendered":"<p>Rollover of Discovery is still pending, due to temperature constraints relating to several systems on the orbiter, resulting in new rollover date of February 22. Meetings are also likely to recommend to delay the launch until early April, to allow the Russian Soyuz TMA-18 to dock at the ISS \u2013 pending evaluations on the constraint of Dual Docked Operations (DDO). Update \u2013 now officially April 5.<\/p>\n<p>STS-131 Flow Latest:<\/p>\n<p>Discovery is in preparation for her STS-131 mission, which will deliver supplies to the International Space Station (ISS) via the Multi-Purpose Logistics Module (MPLM)&nbsp;Leonardo and the Light-weight Multipurpose Experiment Support Structure Carrier (LMC).<\/p>\n<p>Secured inside the MPLM will be Zero-G stowage racks, an EXPRESS rack, a Muscle Atrophy Resistive Exercise (MARES) unit, a Window Orbital Research Facility (WORF), one Crew Quarters Rack, a Minus 80 deg Laboratory Freezer for ISS (MELFI), Resupply Stowage Racks (RSRs), as well as Resupply Stowage Platforms (RSPs).<\/p>\n<h4 class=\"widget-title penci-border-arrow\">See Also<\/h4>\n<ul>\n<li>STS-131 LIVE UPDATES<\/li>\n<li>L2 STS-131 Special Section<\/li>\n<li>Click here to Join L2<\/li>\n<\/ul>\n<p>Rollover to the Vehicle Assembly Building (VAB) was due last week. However, two issues delayed the flow, with the ultimate problem relating to the cold weather at the Kennedy Space Center (KSC).<\/p>\n<p>For an orbiter rollover \u2013 and preparations for mating with the stack\u2019s Solid Rocket Boosters (SRBs) and External Tank \u2013 the VAB has to be above 40 degrees for more than 12 hours solid. This relates to the orbiter\u2019s OMS and RCS, which would be without an active warm air purge and\/or heaters \u2013 which in turn risks damage to the systems.<\/p>\n<p>Although the temperatures in the local area will rise above 40 degrees, they won\u2019t remain within constraints for the extended period of time that would allow managers to be comfortable with rolling Discovery out of her home comforts of OPF-3 (Orbiter Processing Facility).<\/p>\n<p>A constraint within a constraint was also recorded last week, when Discovery\u2019s landing gear was lowered \u2013 after being raised for the \u2018final\u2019 time ahead of rollover \u2013 after a Thermal Protection System (TPS) engineer noticed a Nose Landing Gear (NLG) door had an out-of-spec gap measurement.<\/p>\n<p>Aerospace industry analysis<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>NASA mission patches<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Spaceflight history books<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p>\u201cNLG and MLG (Main Landing Gear) were lowered in support of tile operations; then retracted for final closure before rollover. NLG door step and gap measurements were similar to previous. Two tile shaves will get the roughness below the tolerance,\u201d confirmed the NASA Test Director (NTD), via L2-acquired processing information at the time.<\/p>\n<p>This constraint was soon cleared: \u201cThe step data was presented to MEQ (Mechanical) Engineering and they are good with the door as-is,\u201d although rollover was delayed regardless, due to the aforementioned temperature constraints.<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignleft size-full wp-image-13542\" title=\"A2\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2010\/02\/A212.jpg\" alt=\"\" width=\"285\" height=\"263\">Discovery\u2019s boosters and tank (ET-135) are currently sat in the VAB\u2019s High Bay 3 (HB-3) wondering why they\u2019ve not been joined by Discovery \u2013 although the delay has allowed for continued work on the intertank plug pulls\/pull tests.<\/p>\n<p>\u201cET-135\/SRB BI-142 \/ RSRM 110 (VAB HB-3): L\/R FN #8 Cover RT-455\/Instafoam application; Re-perform pull test again today (Monday),\u201d added processing information.<\/p>\n<p>\u201cOrbiter Mate Preps are complete. Intertank Plug Pulls; Will perform additional 70 pulls on +Z side of the Intertank after Orbiter Mate. May reconfigure platforms and perform prior to Orbiter Mate if mate is delayed because of weather (since confirmed).\u201d<\/p>\n<p>The plug pulls are now a regular procedure on the tanks, since foam losses were observed from the intertank region of the ET during a number of the recent flights. STS-130\u2019s tank also lost some foam from the intertank stringer, although the amount of foam that liberated was far less than the previous two flights. None of the intertank losses hold a threat to the orbiter.<\/p>\n<p>Launch Date:<\/p>\n<p>When Discovery launches is the main question, with meetings set to take place this week to realign the flow. Had rollover occurred on Monday, managers had already set up a preliminary flow that placed STS-131\u2019s launch date as March 22, which held two days of contingency in the flow.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-13544\" title=\"A4\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2010\/02\/A49.jpg\" alt=\"\" width=\"150\" height=\"207\">\u201cBased on the continued prediction of lower than acceptable temperatures, (Mission Management Team manager) Mike Moses has agreed to our recommendation of a STS-131 rollover NET 2nd shift MONDAY 2\/15, followed by orbiter lifting to commence on 1st shift TUESDAY 2\/16,\u201d noted one of several SSP (Space Shuttle Program) and MOD memos (L2) on the debate of slipping from the scheduled March 18 launch date.<\/p>\n<p>\u201cHere are the corresponding schedule milestones: SSV (Space Shuttle Vehicle) to the Pad 2\/23. TCDT (Terminal Countdown Demonstration Test) T-0 3\/5. Payload to the Pad 3\/10. Launch NET 3\/22 (U\/R). Two contingency days in the Pad flow.\u201d<\/p>\n<p>With the one week slip to rollover, it can be assumed the latest NET (No Earlier Than) launch date will be March 29. However, talk of the launch of moving the launch to April was already being circulated, even prior to the latest rollover slip.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-13543\" title=\"A3\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2010\/02\/A313.jpg\" alt=\"\" width=\"304\" height=\"235\">The April launch date \u2013 noted as NET April 4 or 5 \u2013 is based on the constraint of Dual-Docked Ops, which relates to an orbiter being docked at the International Space Station (ISS) during a Soyuz docking.<\/p>\n<p>This issue is heavily referenced on a number of SSP and MOD memos debating the departure of Soyuz TMA-16 on March 18 and Soyuz TMA-18\u2019s April&nbsp;2 launch (for April 4 docking). The original launch date allowed for Discovery to depart the ISS ahead of Soyuz TMA-18\u2019s arrival.<\/p>\n<p>A large amount of work has taken place over recent months to find a solution to the DDO issue, although it appears the constraint will still be in place for STS-131 \u2013 with a direct reference made to ISS program manager Mike Suffredini\u2019s wish to \u201cavoid dual docked ops\u201d for this mission, thus they \u201cexpect STS-131 to move to 4\/4 or 4\/5.\u201d<\/p>\n<p>This of course remains fluid, with the possibility of working in a solution to DDO over the coming weeks. However, sources note this is unlikely to be taken, due to the flow all-but aligning to an early April launch date. It\u2019s also very unlikely the Russians would change their launch schedule.<\/p>\n<p>UPDATE: Now officially NET April 5.<\/p>\n<p>Pad turnaround timelines and a Beta Angle Cutout would also likely result in STS-132 slipping to sometime in June, although this would not be an issue for the Program, with plenty of stretch time built into 2010\u2019s current five mission manifest.<\/p>\n<p><em>L2 members<\/em><em>&nbsp;<\/em><em>:&nbsp;Documentation \u2013 from which the above article has quoted snippets \u2013 is available in full in the related L2 sections, now over 4500 gbs in size<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Rollover of Discovery is still pending, due to temperature constraints relating to several systems on the orbiter, resulting in new rollover date of February 22. Meetings are also likely to recommend to delay the launch until early April, to allow the Russian Soyuz TMA-18 to dock at the ISS \u2013 pending evaluations on the constraint [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[1302,9184,3485],"class_list":["post-40866","post","type-post","status-publish","format-standard","hentry","category-news","tag-soyuz","tag-sts-131","tag-sts-132"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/40866"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=40866"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/40866\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=40866"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=40866"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=40866"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}