{"id":40872,"date":"2010-02-09T23:15:04","date_gmt":"2010-02-09T15:15:04","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/sts-130-endeavour-docks-with-iss-port-wing-protrusion-evaluated\/"},"modified":"2010-02-09T23:15:04","modified_gmt":"2010-02-09T15:15:04","slug":"sts-130-endeavour-docks-with-iss-port-wing-protrusion-evaluated","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/sts-130-endeavour-docks-with-iss-port-wing-protrusion-evaluated\/","title":{"rendered":"STS-130: Endeavour docks with ISS \u2013 Port Wing protrusion evaluated"},"content":{"rendered":"<p>An upper elevon \u201csliding seal\u201d on one of Endeavour\u2019s port wing flippers has protruded, although early Damage Assessment Team (DAT) reports claim only a low level of concern. As STS-130 moved through Flight Day 3, Endeavour and her External Tank appear to have enjoyed an extremely clean ascent, as the orbiter and her crew docking with the International Space Station (ISS).<\/p>\n<p>STS-130 Latest:<\/p>\n<p>Endeavour is proceeding through the mission timeline as planned, with Flight Day 3\u2019s R-bar Pitch Maneuver (RPM) and docking now completed by the crew.<\/p>\n<p>Flight Day 2 involved the opening inspections of Endeavour\u2019s Thermal Protection System (TPS) via the Orbiter Boom Sensor System (OBSS). The data is currently being evaluated by the DAT engineers on the ground.<\/p>\n<h4 class=\"widget-title penci-border-arrow\">See Also<\/h4>\n<ul>\n<li>LIVE STS-130 UPDATES<\/li>\n<li>L2 STS-130 Special Section<\/li>\n<li>Click here to Join L2<\/li>\n<\/ul>\n<p>\u201cFlight day 2 Activities Completed: Crew wake-up at 1810 EST last night. TPS and OMS pod survey with OBSS complete. EMU (EVA Suit) checkout and Centerline camera installation complete. ODS (Orbiter Docking System) ring extension and Rendezvous tools checkout complete,\u201d noted the NASA Test Director Summary (L2).<\/p>\n<p>\u201cFlight Day 3 Activities Planned: Crew wake-up will be at 1714 EST this evening. Rendezvous with ISS. Pitch maneuvering for TPS photography. Dock with ISS Harmony mating Adapter-2. Hatch open and Welcoming.\u201d<\/p>\n<p>Later in Flight Day 3, the Space Station Remote Manipulator System (SSRMS) Canadarm2 will grapple the OBSS and handoff to Shuttle Robotic Arm (SRMS), as preparations are made to remove the newest addition to the ISS \u2013 Node 3 and Cupola \u2013 from the payload bay.<\/p>\n<p>STS-130 Specific Articles: http:\/\/www.nasaspaceflight.com\/tag\/sts-130\/<\/p>\n<p>Rocket launch schedules<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Space tourism guides<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Company News<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p>Only a handful of technical issues are under evaluation \u2013 none of which are deemed as MER (Mission Evaluation Room) level concerns. The issues are all classed as \u201cfunnies\u201d \u2013 which is MER-talk for minor.<\/p>\n<p>\u201cMER Items: None. Funnies: SRMS Voltage BITE; Occurred during checkout and was seen during STS-127 and it is known as a nuisance alarm,\u201d noted the latest Mission Management Team (MMT) presentation (L2).<\/p>\n<p>\u201cLeft OMS GN2 Pressure decay; Decay in this system has been seen on multiple flights. APU (Auxiliary Power Unit) 3 Drain Line Heater Higher set point; This has been seen on the previous three OV-105 (Endeavour) flights. HDTV downlink not successful.<\/p>\n<p>The final item was spotted early today, relating to the protrusion from the Port Wing Elevon Cove \u2013 noted initially as an \u201canomalous object.\u201d<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignleft size-full wp-image-13460\" title=\"A3\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2010\/02\/A38.jpg\" alt=\"\" width=\"333\" height=\"248\">The DAT presentation on the initial TPS findings concentrated on this area in their opening report, and currently have only a \u201clow level\u201d of concern for this issue being a problem for re-entry. More data will also be gathered via FD3\u2019s RPM.<\/p>\n<p>\u201cUpper surface scans and imagery reviewed \u2013 no tile, FI blanket or gap fillers identified for assessment. Complete coverage of both OMS pods and both T0 areas. Vertical tail and forward fuselage complete,\u201d noted the opening assessment from the DAT engineers, pointing to a very clean orbiter.<\/p>\n<p>\u201cStarboard WLE (Wing Leading Edge) carrier panels \u2013 full coverage on lower, partial coverage on upper 2-4. Port WLE carrier panels \u2013 full coverage on upper, partial coverage on lower 7-11. Areas with partial coverage will be imaged during RPM.<\/p>\n<p>\u201cUpper elevon sliding seal by flipper doors 12 and 13 identified as protruding approximately 3.8 inches.\u201d<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-13462\" title=\"A2a\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2010\/02\/A2a.jpg\" alt=\"\" width=\"280\" height=\"175\">The seal that has protruded is made from sheet metal \u2013 inconel \u2013 and is spring loaded between the panels. The leading edge rides under the wing trailing edge and appears to have slipped out from under the wing side.<\/p>\n<p>This upper trailing edge of the wing doesn\u2019t experience the extremely high temperatures of reentry and thus should not be a major concern for reentry \u2013 as noted by the opening DAT findings.<\/p>\n<p>\u201cPhoto shows edge of seal installed under the wing trailing edge as designed. Seal is intended to control venting. Low level of concern within TPS community,\u201d noted DAT, before listing their forward plan, which includes checking closeout images from Endeavour\u2019s STS-130 flow in her Orbiter Processing Facility (OPF).<\/p>\n<p>\u201cForward work: Assessing Venting environments. Elevon positioning schedule during ascent and entry. Previous flight processing history. Pad &amp; Access imagery after final Elevon cycling. Assessing subsystems under the Flipper Door.\u201d<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-13459\" title=\"A2\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2010\/02\/A27.jpg\" alt=\"\" width=\"268\" height=\"177\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2010\/02\/A27.jpg 268w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2010\/02\/A27-263x175.jpg 263w\" sizes=\"(max-width: 268px) 100vw, 268px\">DAT have also reviewed both the ET Umbilical Well and Handheld Photography of STS-130\u2019s External Tank post-separation (full sets in hi res on L2)&nbsp;\u2013 imagery that has shown a very clean tank, with only a few areas of foam loss.<\/p>\n<p>Most notably, the intertank area of ET-134 has only lost a few areas of foam TPS \u2013 far less than seen on the previous few flights.<\/p>\n<p>As with STS-129, the main area of intertank foam loss is on the -Z side of the tank, which holds little to no threat to the orbiter during ascent \u2013 given it is located on the \u201cback\u201d side of the ET.<\/p>\n<p>Images also show around three of foam loss in front of the bipod, and one area of liberation on the edge of the SRB (Solid Rocket Booster) thrust panel. There are no obvious foam losses from any of the LH2 or LOX (LO2) Ice Frost Ramps (IFRs) \u2013 which have been the focus of mitigation efforts over recent years.<\/p>\n<p>Meanwhile, back on Earth, the two SRBs are in the process of being returned to dock for their post flight evaluations. Their initial findings \u2013 per the MMT ascent report (L2) \u2013 noted the boosters performed as planned, as did all of the shuttle hardware during ascent.<\/p>\n<p>\u201cRetrieval Status: Boosters have been recovered and ships are underway back to port. Freedom and Liberty Star are expected at the dock tomorrow at 0800 and 1000 EST respectively,\u201d added the NTD.<\/p>\n<p>\u201cOpen Assessment is expected to begin on Thursday at 0700 EST,\u201d which should result in the onboard video of the SRB\u2019s ride during first stage and splashdown will be available by the weekend.<\/p>\n<p><em>L2 members<\/em><em><\/em><em>:&nbsp;Documentation \u2013 from which the above article has quoted snippets \u2013 is available in full in the related L2 sections, now over 4500 gbs in size<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>An upper elevon \u201csliding seal\u201d on one of Endeavour\u2019s port wing flippers has protruded, although early Damage Assessment Team (DAT) reports claim only a low level of concern. As STS-130 moved through Flight Day 3, Endeavour and her External Tank appear to have enjoyed an extremely clean ascent, as the orbiter and her crew docking [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[9021,9183,7935],"class_list":["post-40872","post","type-post","status-publish","format-standard","hentry","category-news","tag-et","tag-sts-130","tag-tps"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/40872"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=40872"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/40872\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=40872"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=40872"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=40872"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}