{"id":40878,"date":"2010-02-04T22:33:42","date_gmt":"2010-02-04T14:33:42","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/sts-130-managers-ask-worried-workforce-to-focus-as-countdown-begins\/"},"modified":"2010-02-04T22:33:42","modified_gmt":"2010-02-04T14:33:42","slug":"sts-130-managers-ask-worried-workforce-to-focus-as-countdown-begins","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/sts-130-managers-ask-worried-workforce-to-focus-as-countdown-begins\/","title":{"rendered":"STS-130: Managers ask worried workforce to focus as countdown begins"},"content":{"rendered":"<p>STS-130 has moved into S0007 (Launch Countdown) operations, ahead of Endeavour\u2019s Sunday morning launch from the Kennedy Space Center (KSC). The mission comes shortly after NASA Administrator Charlie Bolden\u2019s presentation of the FY2011 budget proposal, which has caused a large amount of unrest in the NASA and contractor workforce \u2013&nbsp;leading to managers calling for the teams to focus ahead of STS-130.<\/p>\n<p>STS-130 Processing Latest:<\/p>\n<p>No issues of note are being worked on Endeavour as she moved into the business end of the pad flow. Call To Stations (CTS) for the countdown began 30 minutes before the clocks started ticking at T-43 hours (just over 74 hours to launch).<\/p>\n<p>\u201cOrbiter: OV-105 \/ ET-134 \/ SRB BI-141 \/ RSRM 109 (Pad-A): Launch countdown preparations continue. CTS for the STS-130 LCD is scheduled for 0130 EST on Thursday,\u201d pre-empted S0007 via processing information (L2). \u201cOrbiter aft confidence checks are complete; the ODS (Orbiter Docking System) portion was completed Tuesday.<\/p>\n<h4 class=\"widget-title penci-border-arrow\">See Also<\/h4>\n<ul>\n<li>LIVE STS-130 UPDATES<\/li>\n<li>L2 STS-130 Special Section<\/li>\n<li>Click here to Join L2<\/li>\n<\/ul>\n<p>\u201cS0071 Hyper\/MPS (Main Propulsion System) pressurization was successfully completed last night and post ops are in work. Wing Leading Edge and Main Engine Ignition instrumentation flight programming being performed.\u201d<\/p>\n<p>With COPV (Composite Overwrap Pressure Vessels) pressurization tasks completed just ahead of the countdown, the only Interim Problem Report (IPR) listed on the latest processing information related to a Ground Support Equipment (GSE) issue, which was being upgraded to a Problem Report (PR) ahead of closure \u2013 following its resolution at the pad. GSE issues are commonplace during the pad flow.<\/p>\n<p>\u201cNew IPR 0050: GSE valve position indicator disagreement. R&amp;R\u2019d the valve and retested. Will upgrade to a GSE PR.\u201d<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignleft size-full wp-image-13378\" title=\"A2\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2010\/02\/A22.jpg\" alt=\"\" width=\"285\" height=\"230\">Good news was also reported on the status of the LCC (Launch Control Center) water damage assessments, following the flooding of all four floors when a FIREX pipe burst late last week. All required system retests were complete with no anomalies.<\/p>\n<p>Spaceflight<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>SpaceX<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>NASA educational resources<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p>\u201cIt was a significant effort to dry out and clean up the LCC area. Believe they are in good shape (and) are on track to pick up with STS-130 countdown,\u201d noted Mission Management Team (MMT) co-chair LeRoy Cain, who added \u201cit was a great job by the folks over the weekend responding to the Firex problem \u2013 appreciate all their effort.\u201d<\/p>\n<p>Mr Cain will also be in attendance at the L-2 MMT meeting on Friday, which is the last major overview of the orbiter\u2019s status and mission content ahead of the pre-tanking meeting on Saturday.<\/p>\n<p>\u201cWe will get into countdown on Thursday morning, L-2 on Friday, and hopefully will launch Endeavour on Sunday morning, weather permitting and if everything continues to work with the vehicle and all the systems and everything else required to launch,\u201d Mr Cain added on the Shuttle Standup\/Integration report (L2). \u201cSo, we must keep our eyes on the ball.<\/p>\n<p>\u201cAs senior leaders in the organization (who receive the standup reports), it is incumbent on you. Folks will talk about and pay attention to and react to whatever you talk about and pay attention to and react to. We really need to stay focused this week as we prepare to fly.\u201d<\/p>\n<p>STS-130 Specific Articles: http:\/\/www.nasaspaceflight.com\/tag\/sts-130\/<\/p>\n<p>Budget Reaction:<\/p>\n<p>Mr Cain\u2019s call to remain focused on the launch is not unusual for a shuttle manager when addressing the teams. However, on this occasion, he is only too aware than the teams responsible for Endeavour\u2019s safe launch and mission have been dealt with the realization that most of them will be out of a job within months.<\/p>\n<p>\u201cWe will hear more about (the Budget\/Forward Path) as time going on. There will be an unbelievable temptation for us to be detracted. We are less than a week away from flying. There is absolutely no way we can allow ourselves to be distracted by that, or anything else.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-13379\" title=\"A3\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2010\/02\/A32.jpg\" alt=\"\" width=\"224\" height=\"261\">\u201cThis team is an incredible asset for the agency. Whatever it is that we go do as an agency at some point when we are done flying space shuttles, we will be called upon, and our capabilities will be drawn into those activities. Over the next weeks and months, similarly, we will be drawn into the discussions as necessary so that we can play whatever roll the agency needs us to play.<\/p>\n<p>\u201cRight now, the roll we need to play is the one we know how to do best. Everyone (needs) to maintain his or her focus this week, as we get ready to go launch on Sunday.\u201d<\/p>\n<p>A recurring theme in nearly all of the managerial addresses to the workforce (several of which have been acquired by L2) point towards an emphasis of the future plan not being set in stone \u2013 based around the Congressional review that may refine certain elements of President Obama\u2019s budget proposal.<\/p>\n<p>\u201c(I) feel very optimistic about the future for us. It may not look like we thought it would, and none of us know at this point what it will look like. This Presidential budget is a process. The official release of the President\u2019s budget is really the beginning of that process.<\/p>\n<p>\u201cWe are going to stay focused on our job. We know what we have to do here for STS-130 and the Node mission, and the missions after that throughout the rest of this fiscal year. We really appreciate you helping us keep the team focused and get ready to go fly.\u201d<\/p>\n<p>One of the contractors that will be hit hardest by President Obama\u2019s plans is the United Space Alliance (USA),&nbsp;with&nbsp;its&nbsp;workforce also heavily involved with the upcoming STS-130 launch and mission. CEO Dick Covey also pointed out to his workforce that Congress hold the purse strings to any Presidential plan, whilst also calling for the teams to focus on Endeavour\u2019s safe mission.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-13380\" title=\"A4\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2010\/02\/A42.jpg\" alt=\"\" width=\"305\" height=\"223\">\u201cThe Obama Administration unveiled their budget request for FY2011 and subsequent years. The requested budget for NASA demonstrates the administration\u2019s intent with regard to a number of key programs and initiatives,\u201d Mr Covey wrote in an open letter \u2013 in which he focused on Constellation\u2019s cancellation, as opposed to what can only be described as the White House\u2019s dismissal of any hope for the extension of the shuttle manifest.<\/p>\n<p>\u201cSpecifically, in addition to funding the five remaining Shuttle flights and extending the ISS, the plan proposes to cancel the Constellation program and shift funds to commercial providers to develop crew and cargo delivery systems for the ISS.<\/p>\n<p>\u201cIt is disappointing that the Administration would propose to cancel Constellation after so much progress has been made. The team has performed in outstanding fashion, and their efforts will be invaluable regardless of what is ultimately decided.\u201d<\/p>\n<p>Mr Covey also used an interesting choice of words when referencing the upcoming Congressional review, citing that USA will be \u201cactively engaged\u201d in the process, which mirrors the sharpening of swords at other contractor companies, such as ATK.<\/p>\n<p>\u201cAs most of you know after years of experience in this business, there is a long process yet to be played out. It will now be up to the Congress to determine how or if to fund this approach,\u201d Mr Covey added. \u201cWe will be actively engaged in that process to ensure that our nation\u2019s interests in human space exploration are not overlooked and to continue to identify ways that we can play a contributing role in future plans.<\/p>\n<p>\u201cThis week, however, we must turn our focus to the job at hand \u2013 flying Endeavour and her crew safely and successfully on STS-130. Every mission matters. Let\u2019s keep the bar set high.\u201d<\/p>\n<p>Further insights into the mood of the NASA and the related contractor teams will be added to upcoming pre-launch articles, including a brilliantly written address from STS-130 Flight Director Kwatsi Alibaruho.<\/p>\n<p><em>L2 members<\/em><em><\/em><em>:&nbsp;Documentation \u2013 from which the above article has quoted snippets \u2013 is available in full in the related L2 sections, now over 4500 gbs in size<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>STS-130 has moved into S0007 (Launch Countdown) operations, ahead of Endeavour\u2019s Sunday morning launch from the Kennedy Space Center (KSC). The mission comes shortly after NASA Administrator Charlie Bolden\u2019s presentation of the FY2011 budget proposal, which has caused a large amount of unrest in the NASA and contractor workforce \u2013&nbsp;leading to managers calling for the [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[631,9183],"class_list":["post-40878","post","type-post","status-publish","format-standard","hentry","category-news","tag-budget","tag-sts-130"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/40878"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=40878"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/40878\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=40878"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=40878"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=40878"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}