{"id":40879,"date":"2010-02-03T00:04:09","date_gmt":"2010-02-02T16:04:09","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/progress-m-04m-launches-to-cost-cutting-iss-sts-135-addition-removed\/"},"modified":"2010-02-03T00:04:09","modified_gmt":"2010-02-02T16:04:09","slug":"progress-m-04m-launches-to-cost-cutting-iss-sts-135-addition-removed","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/progress-m-04m-launches-to-cost-cutting-iss-sts-135-addition-removed\/","title":{"rendered":"Progress M-04M launches to cost-cutting ISS \u2013 STS-135 addition removed"},"content":{"rendered":"<p>With the International Space Station (ISS) extended to at least 2020, its upmass and downmass lifelines have received a blow \u2013 following the decision to remove the possibility of using the Launch On Need (LON) vehicle, Atlantis, for supporting STS-133 as an additional logistics flight (STS-135). Meanwhile, nearly 2,600 kg are enroute to the Station, following the launch of the Russian Progress M-04M.<\/p>\n<p>Progress Launch:<\/p>\n<p>Launched via a Russian Soyuz-U launch vehicle from the Baikonur Cosmodrome in Kazakhstan, the Progress is an upgraded \u2018digital system\u2019 version of the aging craft, carrying its usual 2.5 tons of cargo.<\/p>\n<p>Manifested for the cargo run is 363 kg of water for the Rodnik system (Moscow water). 871 kg of prop in the refueling compartment. 250 kg of prop in the service module allocated for ISS needs. 77 kg for an electronics system \u2013 which is likely to be a replacement 800a battery, and 133 kg for the food rationing system.<\/p>\n<p>Also riding uphill is 96 kg of medical system supplies. 4 kg for Poisk systems. 496 kg for the American segment, making for a total cargo load of 2686 kg. The vehicle will arrive at the ISS on Friday for docking.<\/p>\n<p>ISS cost cutting drive:<\/p>\n<p>Last Friday, ISS managers set their team members the task of reducing costs on the ISS. The purpose of this exercise originated in deferring costs to other NASA programs, with the results overviewed by representatives from the international partners involved with Station.<\/p>\n<p>\u201cThe purpose of the ISS Operation Cost Streamlining Tiger Team is to define and assess International Space Station (ISS) cost streamlining proposals,\u201d noted one of several memos acquired by L2.<\/p>\n<p>Aerospace industry analysis<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>SpaceX launch tickets<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>NASA mission updates<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<h4 class=\"widget-title penci-border-arrow\">See Also<\/h4>\n<ul>\n<li>ISS Forum Section<\/li>\n<li>L2&nbsp;ISS Section<\/li>\n<li>L2 Soyuz Section<\/li>\n<li>Click here to Join L2<\/li>\n<\/ul>\n<p>\u201cThe team will serve as the communications and tracking mechanism for ensuring that cost streamlining proposals are distributed for review and evaluation by each Partner organization, and shall serve as the communications mechanism through which assessments, impacts and recommendations are communicated to the Space Station Control Board (SSCB) for disposition.<\/p>\n<p>\u201cScope And Authority: The ISS Operation Cost Streamlining Tiger Team is established by the Space Station Control Board. It will consist of representation from the International Partnership\/Participants. The team will define, assess and track proposed cost reductions for the ISS Program.\u201d<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignleft size-full wp-image-13368\" title=\"A2\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2010\/02\/A21.jpg\" alt=\"\" width=\"285\" height=\"210\">It may take some time to agree to a format of viable savings, especially if a saving on the NASA budget may result in increased costs to another partner \u2013 in which case NASA may end up compensating the affected partner, thus defeating the purpose if the compensation is higher than the saving.<\/p>\n<p>\u201cSavings may be achieved for one Partner which may result in an increase to another,\u201d added the overview. \u201cThese proposed items will be considered as long as there is an overall savings to the ISS Partnership. Individual barters or compensation will be agreed to by the affected parties.\u201d<\/p>\n<p>Summit meetings will take place in Houston from Wednesday to Friday this week, where managers will overview feedback from team members \u2013 who were asked to fill in a suggestion form on their thoughts for elements that could be streamlined.<\/p>\n<p>\u201cIf only we could get the Program or IP to start\/stop\/modify\u2026\u2026\u2026..(Fill in the blank with your favorite pet peeve), we and\/or the ISSP could sure do things a lot more efficiently with respect to our Partner operations,\u201d noted the question on the form.<\/p>\n<p>\u201cSo your action is to consider the above question and brainstorm on possible ideas for what we can do to save cost based upon operation with our partners.\u201d<\/p>\n<p>There is no real clarification on what caused ISS managers to request the brainstorming sessions \u2013 other than NASA\u2019s \u201cnew direction\u201d to abandon its role in Low Earth Orbit (LEO) \u2013 although it appears to come as a shock to some team leaders \u2013 with one manager noting: \u201cApologies for the brushfire on this, but we just got these details yesterday.\u201d<\/p>\n<p>The final decision on any potential and viable cost reduction efforts has been set for the end of June, with an interim meeting scheduled for the end of March.<\/p>\n<p>\u201cWill continue working to develop additional proposals as ongoing task. Complete evaluation\/assessment of proposed cost reductions by March 31, 2010,\u201d noted the forward plan. \u201cPresent proposals to SSCB for concurrence. Finalize implementation plans for selected proposals by June 30, 2010.\u201d<\/p>\n<p>STS-135\u2019s potential culled from ISS wish list:<\/p>\n<p>Atlantis\u2019 final scheduled flight has now been confirmed \u2013 baring an extremely unlikely emergency \u2013 as STS-132, handing her the unfortunate role as the first orbiter that will retire from the fleet. The news comes after NASA decided to rule against utilizing STS-133\u2019s LON role for Atlantis (STS-335)&nbsp;into the additional flight of STS-135.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-13369\" title=\"A3\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2010\/02\/A31.jpg\" alt=\"\" width=\"180\" height=\"231\">STS-135 would have provided the ISS with an additional logistics flight, while a Russian Soyuz-based plan would have provided rescue capability for a four member crew.<\/p>\n<p>With External Tank (ET-122) continuing to be modified, and other assets such as two Solid Rocket Boosters (SRBs) already purchased at the cost of 10s of millions of dollars, using the hardware to impact on the massive shortfalls the ISS will suffer from post-shuttle appeared to be a no-brainer.<\/p>\n<p>This crew would have been led by Astronaut chief Steve Lindsey, with a crew loading memo pre-empting the Colonel\u2019s switch from his command of STS-133 to the additional flight. This memo was produced on Monday.<\/p>\n<p>\u201cSpace Transportation System (STS)-133 Crew Training: The crew is at L-33 weeks for a September 16 launch date. Several assessments have been made for this flight for a crewmember swap that would occur in April (Lindsey to (STS)-135),\u201d noted the memo acquired by L2.<\/p>\n<p>The April date was referencing the timeline NASA managers needed to work funding requirements to baseline STS-135 into the manifest, based on the completion of the next two flights, and instructions\/funding in the FY2011 NASA budget overview.<\/p>\n<p>\u201cSTS-335: still don\u2019t know if will turn into 135. SSP (Space Shuttle Program) waiting for budget direction next week and that the next two flights get off on time, so don\u2019t expect a decision before early April,\u201d noted information on January 26.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-13370\" title=\"A4\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2010\/02\/A41.jpg\" alt=\"\" width=\"303\" height=\"204\">However, the April timeline did hold impacts for STS-133, based on the tight schedule for the remaining five missions on the 2010 schedule.<\/p>\n<p>\u201cCurrently, the overall loading is green. However, a late crewmember change in April would force the crew to repeat a minimum of 80 hours of training,\u201d added the crew loading memo on Monday. \u201cThe Training Manager is looking at options to move some events currently scheduled in March, out to alleviate an additional 70 hours that would need to be repeated.<\/p>\n<p>\u201cCrew loading will go red if the decision to swap the crewmember is made in April and no launch date relief is given.\u201d<\/p>\n<p>With no sign of a manifest stretch at this time, along with a NASA Budget proposal revealing an intent to killing off the shuttle as soon as possible \u2013 with the additional FY2011 funding now confirmed as only to be used for retirement costs \u2013 STS-135\u2019s chances of becoming a vital boost to an ISS that will have to survive on rations for 10 years appear to be dead \u2013 as later confirmed by NASA Associate Administrator Bill Gerstenmaier on Tuesday.<\/p>\n<p>\u201cFor now, adding the LON as actual flight will end unless a compelling need arises,\u201d confirmed the DA notes memo (L2), literally hours after the crew loading notes referenced the potential commander swap for STS-133 in relation to STS-135.<\/p>\n<p>The result of this decision equates to the Station losing as much upmass potential as four Russian Progress cargo ships, and the deletion of the downmass capability that only the orbiters can currently provide.<\/p>\n<p><em>&nbsp;<\/em><em>L2 members<\/em><em><\/em><em>:&nbsp;Documentation \u2013 from which the above article has quoted snippets \u2013 is available in full in the related L2 sections, now over 4500 gbs in size<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>With the International Space Station (ISS) extended to at least 2020, its upmass and downmass lifelines have received a blow \u2013 following the decision to remove the possibility of using the Launch On Need (LON) vehicle, Atlantis, for supporting STS-133 as an additional logistics flight (STS-135). Meanwhile, nearly 2,600 kg are enroute to the Station, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[233,513,9051,3659,9192],"class_list":["post-40879","post","type-post","status-publish","format-standard","hentry","category-news","tag-iss","tag-progress","tag-sts-133","tag-sts-135","tag-sts-335"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/40879"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=40879"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/40879\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=40879"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=40879"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=40879"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}