{"id":40922,"date":"2009-12-02T18:57:28","date_gmt":"2009-12-02T10:57:28","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/extension-decision-no-closer-after-one-heck-of-a-year-for-shuttle\/"},"modified":"2009-12-02T18:57:28","modified_gmt":"2009-12-02T10:57:28","slug":"extension-decision-no-closer-after-one-heck-of-a-year-for-shuttle","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/extension-decision-no-closer-after-one-heck-of-a-year-for-shuttle\/","title":{"rendered":"Extension decision no closer after \u201cone heck of a year\u201d for shuttle"},"content":{"rendered":"<p>The Space Shuttle Program (SSP) will have \u201cno idea\u201d where it stands from a budget standpoint until February, as the viability of extending the shuttle manifest continues to be eroded by the lack of a clear direction at the political level. The irony of running head first into shuttle retirement comes as the Space Shuttle Program (SSP) completes one of its most successful years on record \u2013 \u201cone heck of a year\u201d as per manager John Shannon.<\/p>\n<p>Shuttle Lifeline Status:<\/p>\n<p>While extending shuttle was deemed as viable \u2013 per the recent Augustine Commission review into Human Space Flight \u2013 from a multi-option standpoint that associated such a move with the development of a Shuttle Derived Heavy Lift Launch Vehicle (SD HLLV) as the follow-on vehicle, the need to make a decision to support extension is at the mercy of NASA\u2019s budget.<\/p>\n<p>President Obama is soon to outline his preference for NASA\u2019s future, centralized around the findings of the Augustine Commission, although any action won\u2019t be forthcoming until the standard government approach of approving future funding for the Agency at the political level.<\/p>\n<\/p>\n<h4 class=\"widget-title penci-border-arrow\">See Also<\/h4>\n<ul>\n<li>Downstream Shuttle Missions<\/li>\n<li>L2 Shuttle Extension Section<\/li>\n<li>Click here to Join L2<\/li>\n<\/ul>\n<p>This leaves a gap, between focusing on the preferred option outlined by the Augustine panel, and funding to carry that option out.<\/p>\n<p>\u201cStill waiting on word on the passback and the budget; there is no guidance right now. There will be no idea where SSP will be from a budget-standpoint until the February timeframe,\u201d noted SSP manager John Shannon, whilst addressing his workforce via the Shuttle Standup\/Integration report (L2). \u201cIt will be worked out between the HQ folks, OMB (Office of Management and Budget), and OSTP (Office of Science and Technology Policy).\u201d<\/p>\n<p>A deadline for a decision to extend the shuttle program doesn\u2019t really exist, though the longer it takes for a decision to be made, the more expensive an extension would be, along with the growing threat of a gap within the extension itself \u2013 especially in the scenario of adding numerous flights for a 2015 extension to the manifest.<\/p>\n<p>SpaceX launch tickets<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Aerospace industry analysis<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Spaceflight<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignleft size-full wp-image-12765\" title=\"A41\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2009\/12\/A41.jpg\" alt=\"A41\" width=\"300\" height=\"233\">An extension that adds two to three flights in 2011\/early 2012&nbsp;is deemed the most viable scenario, avoding the unknown quanity of&nbsp;recertification, age-life hardware issues, and would utilize External Tank ET-122 for STS-135 \u2013 as opposed to its current role as STS-335 (Launch On Need) for STS-133, currently the final flight of the manifest.<\/p>\n<p>STS-136 and STS-137 would require two part built tanks to be completed (now classed as ET-139 and ET-140), both of which \u2013 sources say \u2013 would be ready within nine months of the decision being made. LON for STS-137 could potentially be carried out via a Soyuz ferry plan.<\/p>\n<p>Additional \u201cbrand new, from scratch\u201d tanks have a lead time of two to three years, which means the 2015 extension scenario is already becoming unviable \u2013 regardless of the issues of workforce reduction and other hardware assets that would need to produce additional items \u2013 such as boosters etc.<\/p>\n<p>The shuttle has its detractors, even within NASA, citing safety and cost. However, the five flights of 2009 have showed the world just how capable the vehicle is, when cared for by good management and experienced engineering.<\/p>\n<p>\u201cThis has been a heck of a year. We have a chance to catch a bit of a breather. The team did an amazing job, and set us up for 2010 extremely well. Here is exactly where we want to be to enter 2010 in great shape,\u201d added Mr Shannon, via the Standup report.<\/p>\n<p>\u201cThe decisions (Mission Management Team (MMT) chair) Mike (Moses) made at the Noon Board to get the vehicle configured within the VAB (Endeavour, STS-130 flow), and give the team a little bit of a break over the holidays was important to us. We should all take a lesson there, try and get a little bit of a break here. It has been a heck of a year.\u201d<\/p>\n<p>2010 will be the final year of the shuttle unless a decision to extend is made, and made soon. Currently, the only \u2018expected\u2019 hope relates to funding that will allow SSP a full 2010 to complete the final five flights on the manifest.<\/p>\n<p>\u201cNext year will be just as busy,\u201d added Mr Shannon. \u201cWe are going to face problems next year, and we need to be ready to go. Take a lot of pride in what you have done over this last year. Let us take a little bit of a break and come back at the start of next year and really finish 2010 the right way.\u201d<\/p>\n<p>Reference: Previous *main* Shuttle Extension articles by NASASpaceflight.com:<br \/>\nhttp:\/\/www.nasaspaceflight.com\/2009\/09\/ssp-fight-back-asap-augustine-claim-risk\/<br \/>\nhttp:\/\/www.nasaspaceflight.com\/2009\/07\/major-shuttle-and-iss-extension-drive-augustine-commission\/<br \/>\nhttp:\/\/www.nasaspaceflight.com\/2009\/05\/nasa-present-two-shuttle-extension-options-to-lawmakers\/<br \/>\nhttp:\/\/www.nasaspaceflight.com\/2009\/03\/aresorion-slipping-18-months-shuttle-extension-upper-hand\/<br \/>\nhttp:\/\/www.nasaspaceflight.com\/2009\/02\/extra-nasa-funds-initial-step-towards-gap-reduction\/<br \/>\nhttp:\/\/www.nasaspaceflight.com\/2008\/09\/senate-pass-nasa-bill-for-extra-funding\/<br \/>\nhttp:\/\/www.nasaspaceflight.com\/2008\/10\/shuttle-extension-white-paper\/<br \/>\nhttp:\/\/www.nasaspaceflight.com\/2008\/09\/nasas-dream-scenario-of-a-13-flight-extension-for-shuttle\/<\/p>\n<p>STS-129 Post Flight:<\/p>\n<p>Atlantis\u2019 flawless performance on STS-129 rounded off a great year for the vehicle and SSP, as she adds the final Hubble Servicing Mission (STS-125) and a vital logistics run to the International Space Station (ISS) under her belt. She has now begun turnaround processing for what is currently her final mission \u2013 STS-132.<\/p>\n<p>\u201cLet me thank the team. This is the broader team of the ops people, the engineering teams, everybody across the country that worked so hard over the last two weeks on STS-129,\u201d added Mr Shannon. \u201cAt this point in the Space Program when there is so much uncertainty, it is so important for us to execute as well as we did the last two weeks.<\/p>\n<h4 class=\"widget-title penci-border-arrow\">See Also<\/h4>\n<ul>\n<li>LIVE STS-132 UPDATES<\/li>\n<li>L2 STS-129 Special Section<\/li>\n<li>STS-129&nbsp;&nbsp;MaxQ Video<\/li>\n<li>Click here to Join L2<\/li>\n<\/ul>\n<p>\u201cI know folks gave up Thanksgiving, and I really appreciate it. It was just an outstanding mission; right off on time, got lucky with the weather. The vehicle could not have performed any better, no issues at all. Landed right on time, beautiful weather. This is the way that mission ought to go.<\/p>\n<p>\u201cThe ISS team is extremely happy. This was a huge mission for those people. Taking up two gigantic pallets of spare hardware that will keep them in business for the next decade was super important.\u201d<\/p>\n<p>Turning Atlantis towards her STS-132 flow began on Monday, following her tow off the Shuttle Landing Facility (SLF), and return to the Orbiter Processing Facility (OPF-1).<\/p>\n<p>STS-129 Specific Articles: http:\/\/www.nasaspaceflight.com\/tag\/sts-129\/<\/p>\n<p>\u201cThe post landing and OPF1 Tow-In operations occurred nominally. Atlantis was spotted in OPF-1 at 1650L. T-0 mates occurred 1914L and Fuel Cells were powered down at 2355L. On Saturday the Cryos were drained and PRSD system secured,\u201d noted NASA Test Director processing information (L2). \u201cOn Monday morning the orbiter began OPF turnaround with V1103 Power Up.<\/p>\n<p>\u201cPost flight inspections continue. Orbiter manual power up and power system validation were successfully completed. Payload bay door opening and latch verification were completed. KU band functional and OMS\/RCS static air checks were completed. Nose Landing Gear Strut thruster electrical disconnects being worked.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-12766\" title=\"A66\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2009\/12\/A66.jpg\" alt=\"A66\" width=\"322\" height=\"260\">Engineers also started work on the small issues noted during the countdown \u2013 relating to the noise on Fuel Cell 2\u2019s H2 pump, and on orbit \u2013 relating to the Waste Tank plumbing that was blocked during a dump near the end of the mission.<\/p>\n<p>\u201cOrbiter: On OV-104 (Atlantis), were able to do some troubleshooting on that fuel cell noisy motor signature seen prelaunch,\u201d noted the Orbiter Project Office (OPO) on the Standup report. \u201cWere able to reproduce a very similar signature, but not in the believed prelaunch configuration.\u201d<\/p>\n<p>\u201cIPR (Interim Problem Report) 0001 Update: Ran troubleshooting on the noisy FC2 H2 Pump Motor Noise,\u201d added the NTD report. \u201cThe circuit dimmers were operated per plan and some line noise was able to be created using different lighting configurations of the Numeric OS lighting of the Aft Station. Further evaluation will be required.<\/p>\n<p>\u201cNew IPR 0003: Documenting a reduced drain rate of the Waste Tank. Engineering will perform some additional data review prior to troubleshooting for a suspect blockage within the urine filter (MER (Mission Evaluation Room issue)-10).<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-12767\" title=\"A213\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2009\/12\/A213.jpg\" alt=\"A213\" width=\"260\" height=\"267\">As if not to feel left out, Atlantis appears to have suffered from the nozzle leaks on her Space Shuttle Main Engines (SSMEs), though less than that observed on her sisters, Discovery and Endeavour, after their STS-127 and STS-128 missions.<\/p>\n<p>While a new corrosion inhibitor is set to debut on STS-130, flight rationale was built around additional mitigation procedures for STS-129\u2019s engines \u2013 which includes the cycling of reconditioned air into the nozzles during Atlantis\u2019 pad flow. This appears to have reduced the amount of tiny pinpoint holes in the nozzle \u2013 which are of no concern for their performance during ascent.<\/p>\n<p>\u201cOn Sunday, were able to do a preliminary nozzle tube leak check on Engines 1 and 2. Engine 1 had ~12 leaks. Engine 2 had ~180+ leaks, which is what was seen on the prior two flights for the worse case leak assessment,\u201d added the SSME section of the Standup report.<\/p>\n<p>\u201cOn Engine 3, the preliminary leak check assessment was not done because it was never exposed to the chlorides from the sponge (Nozzle 5011). Will need to look at nozzle allocations and see what can be done to best allocate these nozzles.<\/p>\n<p>\u201cThis was the flight for which the drying purge was kept on the nozzles at the pad, so kept a dry environment on them all the way up to launch.\u201d<\/p>\n<p>With the removal of the use of sponges for the application of the corrosion inhibitor for the remainder of the shuttle program, engineers will have eliminated source of high chlorides on the nozzles by the time Endeavour flies in February.<\/p>\n<p><em><em>L2 members<\/em><\/em><em><em>:&nbsp;Documentation \u2013 from which the above article has quoted snippets \u2013 is available in full in the related L2 sections, now over 4000 gbs in size.<\/em><\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Space Shuttle Program (SSP) will have \u201cno idea\u201d where it stands from a budget standpoint until February, as the viability of extending the shuttle manifest continues to be eroded by the lack of a clear direction at the political level. The irony of running head first into shuttle retirement comes as the Space Shuttle [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[9157,8116,9199],"class_list":["post-40922","post","type-post","status-publish","format-standard","hentry","category-news","tag-extension","tag-ssme","tag-sts-129"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/40922"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=40922"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/40922\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=40922"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=40922"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=40922"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}