{"id":40935,"date":"2009-11-17T17:19:47","date_gmt":"2009-11-17T09:19:47","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/sts-129-tps-inspections-mark-fd2-photos-show-extremely-clean-et-133\/"},"modified":"2009-11-17T17:19:47","modified_gmt":"2009-11-17T09:19:47","slug":"sts-129-tps-inspections-mark-fd2-photos-show-extremely-clean-et-133","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/sts-129-tps-inspections-mark-fd2-photos-show-extremely-clean-et-133\/","title":{"rendered":"STS-129: TPS Inspections mark FD2 \u2013 Photos show extremely clean ET-133"},"content":{"rendered":"<p>STS-129\u2019s crew have worked through the primary Flight Day 2 task of inspecting Atlantis\u2019 Thermal Protection System via the Orbiter Boom Sensor System (OBSS),&nbsp;while the&nbsp;Mission Management Team (MMT) review ascent data and imagery of STS-129\u2019s External Tank (ET-133). Post Sep ET Umbilical Well photography shows what appears to be one of the cleanest tanks on record, although some intertank foam loss is noted on the backside of the tank.<\/p>\n<p>STS-129: Mission Evaluation Room:<\/p>\n<p>Flight Day 1 activities rounded up the crew\u2019s day after launch, with the opening of the Payload Bay Doors and Ku-band antenna deployment. Remote Manipulator System (RMS) activation and Umbilical Well and Handheld External Tank photo and TV downlinks followed, prior to crew sleep.<\/p>\n<p>Some of the crew went to bed over an hour later than scheduled, likely due to the excitement of the super launch they had just been involved with.<\/p>\n<p>\u201cThe STS-129 mission was launched at 320\/19:28:09.985 GMT. A nominal Orbital Maneuvering System (OMS) assist maneuver was performed following SRB separation. Ignition occurred at 320\/19:30:24.2 GMT [00\/00:02:14.3 Mission Elapsed Time (MET)], and the maneuver was 84.40 sec in duration. MECO occurred at 320\/19:36:34 GMT (00\/00:08:24.0 MET). The ET separated from the Orbiter at 320\/19:35:56 GMT (00\/00:08:38..2 MET),\u201d noted the MER manager\u2019s report (L2).<\/p>\n<h4 class=\"widget-title penci-border-arrow\">See Also<\/h4>\n<ul>\n<li>LIVE STS-129 UPDATES<\/li>\n<li>L2 STS-129 Special Section<\/li>\n<li>Click here to Join L2<\/li>\n<\/ul>\n<p>\u201cA nominal OMS-2 maneuver was performed at 320\/20:06:25.2 GMT (00\/00:38:16.3 MET). The maneuver was 63.8 sec in duration with a differential velocity of 96.9 ft\/sec. The achieved orbit was 85.2 by 124.7 nmi.<\/p>\n<p>\u201cThe payload bay doors were opened at 320\/21:12:17 GMT (00\/01:44:07 MET). The Ku-Band antenna was deployed and the self-test was completed with satisfactory results.\u201d<\/p>\n<p>An expanded systems overview of Atlantis\u2019 performance during ascent will be provided in an upcoming article, based on information collated in the expansive Consolidated Ascent Report (L2).<\/p>\n<p>Spaceflight<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>NASA mission patches<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>SpaceX<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p>Following wake up on Flight Day 2, the crew pressed forward with the TPS and OMS pod survey via OBSS. Other tasks for Tuesday involve EMU checkout and Centerline camera installation, followed by ODS (Orbiter Docking System) ring extension and Rendezvous tools checkout. The RMS will also be positioned to grapple ELC-1 (ExPRESS Logistics Carrier) in Payload Bay.<\/p>\n<p>Atlantis remains on the timeline, ahead of Flight Day 3\u2019s rendezvous and docking with the International Space Station (ISS), with only three \u201cfunnies\u201d (minor issues) reported by the Mission Evaluation Room (MER).<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignleft size-full wp-image-12587\" title=\"A2\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2009\/11\/A218.jpg\" alt=\"A2\" width=\"353\" height=\"310\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2009\/11\/A218.jpg 353w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2009\/11\/A218-350x307.jpg 350w\" sizes=\"(max-width: 353px) 100vw, 353px\">\u201cFunnies: MADS PCM BITE Failure \u2013 INCO (Instrumentation and Communications Officer) reported a PCM BITE failure post wide band shutdown. The team is still looking at the data and will present a status at tomorrow\u2019s OPO (Orbiter Project Office) tag,\u201d noted Tuesday\u2019s NTD status via the MER (L2).<\/p>\n<p>\u201cHD Video D\/L (Download) Unsuccessful \u2013 Crew was not able to downlink HD video. Troubleshooting note going up today. Camera A Yellow Hue \u2013 Intermittent yellow hue on video. Known issue with this serial number and observed on previous missions.\u201d<\/p>\n<p>The MMT have already been handed a presentation on the MADS (Modular Auxiliary Data System) PCM (Pulse Code Modulation) BITE (Built In Test Equipment) failure, which holds no mission impact due to 3\/3 criticality.<\/p>\n<p>MADS is an onboard instrumentation system measures and records selected pressure, temperature, strain, vibration and event data to support payloads and experiments and to determine orbiter environments during flight. It supplements existing orbiter operational instrumentation by conditioning, digitizing and storing data from selected sensors and experiments.<\/p>\n<p>The MADS collects detailed data during ascent, orbit and entry to define vehicle response to flight environments. It permits correlation of data from one flight to another and enables comparison of flight data from one orbiter to another orbiter.<\/p>\n<p>MADS records approximately 246 measurements from the orbiter airframe, skin and orbital maneuvering system\/reaction control system left-hand pod and works on several \u201cmodes\u201d \u2013 one of which is PCM mode.<\/p>\n<p>\u201cDescription of Anomaly: MADS PCM BITE indicated fail at 320:19:54:54 for 16 seconds and then continuously from 320:19:55:38. MADS PCM BITE normally indicates fail when MADS PCM power is removed. However the command to remove MADS PCM power was not sent until 320:19:58:33,\u201d noted the MMT presentation, available on L2.<\/p>\n<p>\u201cThis was after SSR1 stopped recording MADS data at 320:19:53:34 so MADS PCM ascent data was not affected. Consequences of Anomaly: If the problem is a failure of the MADS PCM, PCM entry data may be lost. MADS PCM is criticality 3\/3. Loss of MADS data will not affect crew or vehicle safety or mission success.<\/p>\n<p>\u201cRecommendations\/Action Plan: No workarounds exist to recover data. When MADS PCM is powered on for entry, a BITE fail indication could occur. This will result in possible loss of some or all MADS PCM entry data. MADS Recorder dump may provide additional information for troubleshooting postflight.<\/p>\n<p>\u201cKSC will provide postflight troubleshooting. However there are no spare MADS PCM units available.\u201d<\/p>\n<p>STS-129 Specific Articles: http:\/\/www.nasaspaceflight.com\/tag\/sts-129\/<\/p>\n<p>Though prior to launch, the \u201cnoise\u201d issue with Fuel Cell 2\u2019s H2 pump motor has also been documented on the MER list. The FC has been performing well since \u2013 and given the condition has been seen on previous flights, it will be documented as an explained condition.<\/p>\n<p>\u201cFuel Cell 2 FCP H2 Pump Motor Status, was erratic pre-launch. Most of the bit flips were only 1 flip with an occasional 2-3 bit-flip toggles. Based on a pre-launch PRT discussion, it was decided to leave the measurement in the Ground Launch Sequencer with no value changes,\u201d added the MER.<\/p>\n<p>\u201cWith load changes on AC 2 immediately prior to launch, the Fuel Cell 2 H2 Pump Motor became stable. After launch it resembled the other fuel cells H2 Pump Motor Status signatures. MER Manager will document the issue as an \u201cExplained Condition\u201d and the PRT will develop a plan to disposition the issue.\u201d<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-12588\" title=\"A4\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2009\/11\/A410.jpg\" alt=\"A4\" width=\"303\" height=\"252\">The main focus of engineers on the ground over the coming days will be the evaluation of ascent and on orbit imagery to ensure Atlantis is safe for re-entry at the end of this month.<\/p>\n<p>The DAT (Damage Assessment Team) have started to review ascent imagery from ground based cameras and radar facilities, ahead of their opening report to the MMT on Flight Day 4.<\/p>\n<p>Handheld video and footage from the new minicam on the flight deck have already been downlinked to the ground, as have the set of ET Umbilical Well images of the tank just after separation.<\/p>\n<p>These photographs are utilized to reveal the health of the tank\u2019s TPS foam after ascent, with any liberations easily visible \u2013 allowing for mass measurements, composition and origin of liberation to be cross referenced with video footage of foam loss and potential impacts on the orbiter.<\/p>\n<p>The initial estimate of three debris events observed on the ET cam during ascent is unlikely to rise, with an amazingly clean tank that only appears to have two very minor areas of foam loss \u2013 as per set of hi res ET Umbilical Well photographs, acquired on Tuesday morning by L2.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-12589\" title=\"A3\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2009\/11\/A313.jpg\" alt=\"A3\" width=\"304\" height=\"234\">These two areas are so minor, they might even be pre-flight areas of repair.<\/p>\n<p>The photographs taken by the ET Umbilical Well\u2019s flash\/camera system show all of the LO2 and LH2 Ice Frost Ramps (IFRs) to be intact, with no foam loss from the intertank or other critical areas.<\/p>\n<p>There appears to be a minor foam loss near the 17 inch feedline, and one under the left hand bipod strut, likely awarding ET-133 with the honor of being one of the cleanest tanks since Return To Flight.<\/p>\n<p>No other areas of foam loss are obvious \u2013 at least to the untrained eye \u2013 which once again boosts the continuous efforts to mitigate foam liberations by engineers within the Space Shuttle Program (SSP), and at the Michoud Assembly Facility (MAF) in New Orleans.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-12598\" title=\"A6\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2009\/11\/A64.jpg\" alt=\"A6\" width=\"308\" height=\"229\">UPDATE: Further images from the handheld camera do show what appears to be foam loss events on the backside of the tank&nbsp;\u2013 although such liberations would not hold any impact threat to the orbiter.<\/p>\n<p>Foam loss threats from an orbiter impact standpoint mainly originate come from the top side \u2013 in line with the orbiter during ascent.<\/p>\n<p>Additional ascent footage will be taken from recorders on the two Solid Rocket Boosters (SRBs), once they have been towed back to port by the retrieval ships Liberty and Freedom. The boosters are expected to be ready to pull out of the water on Thursday.<\/p>\n<p>\u201cSRB Retrieval Status: Recovery going well. All chutes and both frustums are on-board. Operations are expected to pick up at 0700 this morning,\u201d added Tuesday NTD information. \u201cLiberty and Freedom Star are expected to arrive at Hangar AF dock Thursday at 0800 and 1000 EST respectively. Open Assessment is expected to begin on Friday at 0700 EST.\u201d<\/p>\n<p>Washdown and safing of Pad 39A is also in work, with some reports of damage to the flame pit being noted \u2013 although full evaluations can only take place when the pad has been fully cleared for engineerings to enter.<\/p>\n<p><em><em>L2 members<\/em><\/em><em><em>:&nbsp;Documentation \u2013 from which the above article has quoted snippets \u2013 is available in full in the related L2 sections, now over 4000 gbs in size.<\/em><\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>STS-129\u2019s crew have worked through the primary Flight Day 2 task of inspecting Atlantis\u2019 Thermal Protection System via the Orbiter Boom Sensor System (OBSS),&nbsp;while the&nbsp;Mission Management Team (MMT) review ascent data and imagery of STS-129\u2019s External Tank (ET-133). Post Sep ET Umbilical Well photography shows what appears to be one of the cleanest tanks on [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[9021,9199],"class_list":["post-40935","post","type-post","status-publish","format-standard","hentry","category-news","tag-et","tag-sts-129"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/40935"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=40935"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/40935\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=40935"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=40935"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=40935"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}