{"id":40937,"date":"2009-11-16T19:37:02","date_gmt":"2009-11-16T11:37:02","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/launch-day-live-fuel-cell-2-issue-cleared-atlantis-in-perfect-launch\/"},"modified":"2009-11-16T19:37:02","modified_gmt":"2009-11-16T11:37:02","slug":"launch-day-live-fuel-cell-2-issue-cleared-atlantis-in-perfect-launch","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/launch-day-live-fuel-cell-2-issue-cleared-atlantis-in-perfect-launch\/","title":{"rendered":"LAUNCH DAY LIVE: Fuel Cell 2 issue cleared \u2013 Atlantis in perfect launch"},"content":{"rendered":"<p>With a smooth countdown behind her, Atlantis launched on her opening opportunity on the STS-129\/ULF-3 mission to the International Space Station (ISS). Engineers only had to work one issue during the count \u2013 relating to noise on the H2 pump inside Fuel Cell 2.<\/p>\n<p>Countdown Status&nbsp;\u2013 Click here for post launch article:<\/p>\n<p>The flight marks the first time since 2002 that NASA has accomplished five shuttle launch flows within a calendar year \u2013 a milestone that highlights the ingenuity and tenacity of the NASA workforce<\/p>\n<p>Over one month after arriving at Launch Pad 39-A, orbiter Atlantis is ready to embark on her 31st voyage to space. The mission \u2013 STS-129 \u2013 will be the 129th shuttle flight and the 31st shuttle mission dedicated to construction and outfitting of the International Space Station.<\/p>\n<p>Coming at the end of a highly successful year for NASA, Atlantis entered S0007 operations (launch countdown) at 1300 hours on Friday, November 13. Since then, she has enjoyed an issue-free countdown, with launch personnel completing the Power Reactant Storage Distribution (PRSD) system load for the orbiter\u2019s Fuel Cells on Saturday evening.<\/p>\n<h4 class=\"widget-title penci-border-arrow\">See Also<\/h4>\n<ul>\n<li>LIVE STS-129 UPDATES<\/li>\n<li>L2 STS-129 Special Section<\/li>\n<li>Click here to Join L2<\/li>\n<\/ul>\n<p>When PRSD load was complete, there were 2 days of LH2 (Liquid Hydrogen) pad hold time and 5 days of LO2 (Liquid Oxygen) pad hold time available. While these numbers differ from the pre-load estimates, these pad hold time numbers will support all STS-129 countdown objectives, including the ability to try for three launch attempts in a row if needed.<\/p>\n<p>If not, the plan is to accomplish a single commodity top off of LH2 during a standard 48-hour scrub turnaround. LO2 replenish is not necessary as the LO2 pad hold time exceeds the available window for STS-129.<\/p>\n<p>Further, workers at Pad-A removed the Rotating Service Structure from Atlantis and the 129 stack at 5:30p.m. Sunday evening before beginning final vehicle power-ups and check-outs for flight.<\/p>\n<p>The pre-launch Mission Management Team met at 4:30a.m. to review the status of the 129 vehicle\u2019s system before giving a \u201cgo\u201d to proceed with cryogenic loading of the External Tank with over 500,000 gallons of LO2 and LH2.<\/p>\n<p>Aerospace industry analysis<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Space Technology<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Spaceflight history books<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p>Liquid Hydrogen began&nbsp;flowing into Atlantis\u2019 External Tank at ~5:13a.m. \u2013 ten minutes after LH2 chilldown operations commenced. Likewise, LO2 loading of the External Tank began shortly befor 5:43a.m.<\/p>\n<p>Liquid Oxygen loading entered \u201cfast fill\u201d at around 5:53a.m. with LH2 loading entering \u201cfast fill\u201d mode at ~6:03a.m. LH2 topping followed at 7:18a.m. with both LO2 and LH2 entering stable replenish at ~8:03a.m.<\/p>\n<p>The Flight Crew left the Operations and Checkout building and have ingressed the orbiter&nbsp;\u2013 around which time an issue with Fuel Cell 2 was reported, relating to noise on the H2 pump. This has been seen before with STS-125, and a solution may be to simply update the GLS to avoid the countdown being hit by the issue.<\/p>\n<p>Engineers have&nbsp;30 minutes to evaluate instrumentation and report back on the forward plan, which may involve tests with the&nbsp;associated&nbsp;circuit breakers. After debating the situation, engineers have decided to&nbsp;leave the current GLS plan in place and continue to monitor during the countdown.&nbsp;<\/p>\n<p>STS-129 Specific Articles: http:\/\/www.nasaspaceflight.com\/tag\/sts-129\/<\/p>\n<p>The countdown resumed at 13:23 EST and count down to the T-9 minute mark. At that point (13:34 EST), the countdown entered its final built in hold. This hold, assuming a launch at the center of the window, will last for 45-minutes and 11-seconds.<\/p>\n<p>Approximately 15-minutes before the targeted T0 time, NASA Test Director Steve Payne and Shuttle Launch Director Mike Leinbach conducted the final \u201cGo\/No Go\u201d for launch poll. If all consoles poll \u201cgo,\u201d Atlantis\u2019 countdown resumed at 14:19:11 EST.<\/p>\n<p>All went as&nbsp;planned, with Atlantis\u2019 three Space Shuttle Main Engines conducting their staggered start sequence at 14:28:04.4 EST, with the Solid Rocket Boosters igniting at 14:28:11 EST to begin to the STS-129 mission. The lauch was extreemly clean, with no issues during ascent.<\/p>\n<p>Fleet Fuel Cell Update:<\/p>\n<p>Highlighting the resolve of the NASA workforce to understand any unexpected performance issues with the Shuttle fleet, engineers have reviewed the recent performance discrepancies with two Fuel Cells (one each on STS-127 and STS-128).<\/p>\n<p>On STS-128, Fuel Cell 2 (FC-2) experienced two operating anomalies, neither of which affected the mission performance of orbiter Discovery.<\/p>\n<p>\u201cDuring landing, the FC coolant pressure typically drops temporarily as loads are increased,\u201d notes the STS-129 FRR (Flight Readiness Review). \u201cHowever, FC2 (S\/N 107) has been dropping lower each flight for the last several flights.\u201d<\/p>\n<p>Despite this downward trend, FC-2 never dropped below the Operations and Maintenance Requirements and Specifications (OMRS) limit of 55 psi before STS-128.<\/p>\n<p>The FRR presentation noted that this trend could be part of an overall trend in the H2\/O2 regulator. A less likely possibility is that the drop in coolant pressure was the result of a coolant leak. Nevertheless, the problem could not be repeated during post-flight troubleshooting efforts.<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignleft size-full wp-image-12553\" title=\"A2\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2009\/11\/A216.jpg\" alt=\"A2\" width=\"333\" height=\"262\">Moreover, since there is no evidence of this \u201ctrending\u201d in any of the three Fuel Cells in Atlantis, and coolant ullage checks have verified that no leaks are present, this issue is not a concern for STS-129.<\/p>\n<p>However, this was not the only issue observed with FC-2 during STS-128. During the mission, the FC exhibited a \u201cgreater than normal condenser exit temperature and lower resultant KOH concentration,\u201d notes the Orbiter Project FRR presentation for STS-129.<\/p>\n<p>In fact, FC-2 on Discovery was the second FC in as many missions to exhibit a high condenser exit temperature coupled with a low KOH concentration.<\/p>\n<p>One of Endeavour\u2019s Fuel Cells (S\/N 121) on STS-127 reached a condenser exit temperature of 161 degrees F and a KOH level of 28 percent. During Discovery\u2019s mission, FC-2 reached a condenser exit temperature of 159 degrees F with a KOH concentration reading of 29 percent.<\/p>\n<p>Initial thoughts indicated that this issue may pertain to the use of the SSPTS (Station to Shuttle Power Transfer System) to alleviate the burden on the Fuel Cells in Discovery and Endeavour (the only two orbiters that have SSPTS capability) during docked operations with the International Space Station. However, this line of thought no longer appears to be correct.<\/p>\n<p>\u201cAll of the above problems appear to be independent of SSPTS operations,\u201d notes the Orbiter Project Office FRR presentation.<\/p>\n<p>In all, SSPTS has flown on eight missions (four each on Discovery and Endeavour) with the FC issue manifesting only on the last two SSPTS flights.<\/p>\n<p>While a high condenser exit temperature and low KOH concentration holds the potential for Fuel Cell shutdown during flight, both Endeavour\u2019s and Discovery\u2019s affected Fuel Cells were in no danger of being shutdown. This was due in large part to the vigilance of ground controllers and pre-flight KOH measurements of the Fuel Cells that verified the KOH limits and the proper calibration of the KOH sensors.<\/p>\n<p>The KOH lower-level limit is 24 percent, with the in-flight rule being 29 percent to protect for potential instrumentation bias. Since the \u201caverage KOH concentration on both flights was 30 percent,\u201d the missions were not in danger of losing a Fuel Cell to this issue.<\/p>\n<p>Nevertheless, investigations on these anomalies were conducted, with vendor review of the Thermal Control Valve histories of the affected Fuel Cells starting after the completion of STS-128.<\/p>\n<p>These investigations showed that all condenser exit temperatures were within expected limits during the last Acceptance Test Procedure (ATP). With the exception of FCs S\/N107 and S\/N121, \u201cpower plant condenser exit temperature has been repeating within ~1 deg from flight to flight.\u201d<\/p>\n<p>As such, testing has failed to identify any correlation between the SSPTS operation and the long-term health of the Fuel Cells.<\/p>\n<p>\u201cPost SSPTS qualification test at vendor, fuel cell was subjected to ATP with no adverse effects noted. Fuel Cell accumulated 102 hours during test for both transient and steady state load sharing between it and Power Transfer Unit. At SSPTS termination during flight, Fuel Cell operating parameters return to nominal values.\u201d<\/p>\n<p>Further, all three Fuel Cells installed on Atlantis have passed diagnostics and\/or ATP and all Fuel Cells with \u201cout-of-family\u201d condenser exit temperatures have been removed from the fleet.<\/p>\n<p>As such, STS-129 and subsequent flights have been cleared for flight from this issue.<\/p>\n<p><em><em>L2 members<\/em><\/em><em><em>:&nbsp;Documentation \u2013 from which the above article has quoted snippets \u2013 is available in full in the related L2 sections, now over 4000 gbs in size.<\/em><\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>With a smooth countdown behind her, Atlantis launched on her opening opportunity on the STS-129\/ULF-3 mission to the International Space Station (ISS). Engineers only had to work one issue during the count \u2013 relating to noise on the H2 pump inside Fuel Cell 2. Countdown Status&nbsp;\u2013 Click here for post launch article: The flight marks [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[9199],"class_list":["post-40937","post","type-post","status-publish","format-standard","hentry","category-news","tag-sts-129"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/40937"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=40937"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/40937\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=40937"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=40937"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=40937"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}