{"id":40972,"date":"2009-10-06T22:06:25","date_gmt":"2009-10-06T14:06:25","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/sts-129-atlantis-arrives-in-vab-for-mating-ssme-mystery\/"},"modified":"2009-10-06T22:06:25","modified_gmt":"2009-10-06T14:06:25","slug":"sts-129-atlantis-arrives-in-vab-for-mating-ssme-mystery","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/sts-129-atlantis-arrives-in-vab-for-mating-ssme-mystery\/","title":{"rendered":"STS-129: Atlantis arrives in VAB for mating \u2013 SSME mystery"},"content":{"rendered":"<p>Atlantis is preparing to mate with her External Tank (ET-133) and twin Solid Rocket Boosters (SRBs), following rollover to the Vehicle Assembly Building (VAB) on Tuesday morning. Meanwhile, engineers are finaling plans to protect the Space Shuttle Main Engine (SSME) nozzles at the pad, following leaks on the last two missions, and an observation of a mystery organic rubber material on Discovery\u2019s Engine 3.<\/p>\n<p>STS-129 Latest:<\/p>\n<p>Atlantis\u2019 roll to the VAB came after one late engineering item of interest was noted, relating to the changeout of the onboard Waste Collection System (WCS).<\/p>\n<p>All associated mechanical work was completed in the Orbiter Processing Facility (OPF), while retests will take place at Pad 39A \u2013 when Atlantis as the STS-129 stack rolls out of the VAB in a week\u2019s time.<\/p>\n<p>\u201cWCS R&amp;R work is complete, and retest will be done vertically at the pad,\u201d noted Tuesday processing information on L2.<\/p>\n<h4 class=\"widget-title penci-border-arrow\">See Also<\/h4>\n<ul>\n<li>LIVE STS-129 UPDATES<\/li>\n<li>L2 STS-129 Special Section<\/li>\n<li>Click here to Join L2<\/li>\n<\/ul>\n<p>Atlantis took less than an hour to be rolled into the VAB on top of the Orbiter Transporter System (OTS). Engineers will begin mating the orbiter to the stack on Wednesday morning.<\/p>\n<p>\u201cS0004 Orbiter\/ET mate CTS (Call To Stations) is scheduled for 0600L this morning. Sling attachment is scheduled for after lunch. Orbiter rotate to vertical and lift over transom is scheduled for 2nd shift. Orbiter\/ET hard mate is scheduled to be completed tomorrow (Wednesday) morning.\u201d<\/p>\n<p>\u201cET\/SRB Aft Fairing installation is complete. Foam closeouts to be performed after S0004. Forward &amp; Aft Skirt Firing Line Checks will be performed after S0004.\u201d<\/p>\n<p>Aerospace industry analysis<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Space Technology<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>NASA educational resources<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p>Out at the Pad, truckloads of LOX and LH2 are arriving at the giant spheres that store the propellant ahead of launch day\u2019s tanking into the ET.<\/p>\n<p>\u201cPad A: 4 waves of LOX tankers were offloaded yesterday. 2 waves of LH2 tankers are scheduled for today,\u201d added Tuesday processing information. \u201cN2O4 tanker offload (in SCAPE) is scheduled today at Ox Farm.\u201d<\/p>\n<p>Work is also picking up behind the scenes, as managers prepare to head into STS-129\u2019s Flight Readiness Review (FRR) season. The STS-129 L-30 (Days) Bench Review is scheduled for Thursday, while the opening bulk of mission documentation will be presented at the MOD FRR \u2013 due on October 15.<\/p>\n<p>This will be followed by the Space Shuttle Program (SSP) and Agency level FRRs, which will discuss not only the mission in hand, but also items of interest from recent missions. One such item up for discussion will be the recent leaks observed on the SSME nozzles.<\/p>\n<p>As previously reported by this site, engineers have found the application of an adhesive tape \u2013 used to seal the throat plugs on the SSMEs since the 1990s \u2013 was the initial root cause of 340 leaks on Endeavour\u2019s number one engine (STS-127), and likely with the leaks seen on Discovery\u2019s Engine 3 (STS-128).<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-12021\" title=\"A2\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2009\/10\/A24.jpg\" alt=\"A2\" width=\"260\" height=\"189\">Sulfur in the tape has been found to interact with the nozzle\u2019s nickel finish under the extreme temperatures endured during their ascent role, causing embrittlement and then tiny cracks and corrosion of the A286 iron which the SSME nozzle tubes are made from.<\/p>\n<p>However, additional protection out at the Pad may be able to mitigate against these symptoms.<\/p>\n<p>\u201cSSME (Pratt &amp; Whitney Rocketdyne\/KSC): On OV-104 (Atlantis), there was a meeting Friday to discuss potential options on how to protect the nozzles from environment out at the launch pad \u2013 it looks like will have an opportunity to try three different methods to keep an inert atmosphere in the nozzles,\u201d noted the latest Shuttle Standup\/Integration report on L2.<\/p>\n<p>\u201cOne is to redirect the current trickle purge that runs through the engine. The second is the use ECS (Environmental Control System) air, and the third is the use a 743 panel (a direct to nitrogen purge). Will work details of that test activity this week and execute it Friday. Whichever one meets our criteria would then be available for us to use once we get out to the pad.\u201d<\/p>\n<p>With Endeavour\u2019s Engine 1 nozzle now undergoing repairs in California, engineers at the Kennedy Space Center (KSC) have switched their attention to Engine 3 that has now been removed from the aft of Discovery.<\/p>\n<p>Once in the engine shop, the nozzle will be mapped for the exact number of leaks, currently estimated to be around 200.<\/p>\n<p>\u201cOf interest to SSME\/PWR (Pratt &amp; Whitney Rocketdyne) will be to get Engine #3 to the Engine Shop to do a detailed mapping of the nozzle tube leaks to compare to those of STS-127,\u201d notes the Standup report, adding one area of interest will require further evaluations, as engineers aren\u2019t sure what they are looking at.<\/p>\n<p>\u201cOne interesting note was when the orbiter (OV-103) got back to KSC from Dryden, Logistics was able to thoroughly inspect the exterior surfaces of the nozzle. On Engine #3 hatband styben #6, which is halfway up the nozzle at the 8:00 position (when standing on runway looking at it), there was a black material adhered to those two hatbands.<\/p>\n<p>\u201cInitially it was thought to be some SRB residual. Took a sample of that material to the KSC lab, and it appears to be some kind of organic rubber compound with a neutral pH. It looks like it was heated.<\/p>\n<p>\u201cIf anyone has any ideas of where the rubber came from, SSME\/PWR would appreciate being contacted. Will get the official KSC material report out.\u201d<\/p>\n<p><em><em>L2 members<\/em><\/em><em><em>:&nbsp;Documentation \u2013 from which the above article has quoted snippets \u2013 is available in full in the related L2 sections, now over 4000 gbs in size.<\/em><\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Atlantis is preparing to mate with her External Tank (ET-133) and twin Solid Rocket Boosters (SRBs), following rollover to the Vehicle Assembly Building (VAB) on Tuesday morning. Meanwhile, engineers are finaling plans to protect the Space Shuttle Main Engine (SSME) nozzles at the pad, following leaks on the last two missions, and an observation of [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[8116,9199],"class_list":["post-40972","post","type-post","status-publish","format-standard","hentry","category-news","tag-ssme","tag-sts-129"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/40972"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=40972"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/40972\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=40972"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=40972"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=40972"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}