{"id":40986,"date":"2009-09-19T18:26:19","date_gmt":"2009-09-19T10:26:19","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/ares-i-x-undergoing-ordnance-installation-i-x-sts-129-conflict-evaluations\/"},"modified":"2009-09-19T18:26:19","modified_gmt":"2009-09-19T10:26:19","slug":"ares-i-x-undergoing-ordnance-installation-i-x-sts-129-conflict-evaluations","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/ares-i-x-undergoing-ordnance-installation-i-x-sts-129-conflict-evaluations\/","title":{"rendered":"Ares I-X undergoing ordnance installation \u2013 I-X\/STS-129 conflict evaluations"},"content":{"rendered":"<p>The Ares I-X test vehicle is continuing to undergo the business end of processing inside the Vehicle Assembly Building (VAB) \u2013 which includes the installation of its ordnance over the weekend. Meanwhile, Shuttle and Constellation managers are debating its October 31 launch date, due to the proximity of Atlantis\u2019 preparations for her STS-129 launch from the adjacent Pad 39A.<\/p>\n<p>Ares I-X Objectives:<\/p>\n<p>The Ares I-X Flight Test Vehicle is the first major flight test of hardware related to the Ares I Crew Launch Vehicle (CLV). Although it is based on a four segment first stage \u2013 as opposed to Ares I\u2019s five segment booster \u2013 \u201careas of comparison\u201d will be tested during I-X\u2019s short flight off Pad 39B.<\/p>\n<p>These tests include the outer mold line (OML) geometry, aerosciences, trajectory, structural modes, flight control architecture, separation sequence, and relevant element differences.<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignleft size-full wp-image-11809\" title=\"A2\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2009\/09\/A211.jpg\" alt=\"A2\" width=\"285\" height=\"271\">Five major hardware elements comprise the Ares I-X. These include the First Stage (FS), the mass and OML simulators of the Upper Stage (US) and Crew Module (CM)\/LAS (Launch Abort System), the Roll Control System (RoCS), and the avionics \u2013 parts of which are located throughout the vehicle.<\/p>\n<p>The number one primary Ares I-X objective is to demonstrate control of a vehicle dynamically that are similar to the Ares I, using Ares I relevant flight control algorithms. The vehicles use the same overall architecture and augmentation approaches, enabling common design and analysis techniques.<\/p>\n<p>Despite the single-team approach to Ares I and Ares I-X GN&amp;C, there are significant differences in the two vehicles that will mean the Ares I-X flight test results will not directly validate Ares I control laws. Instead, they will be used to validate and calibrate the design and analysis tools used to develop the flight control architecture for Ares I.<\/p>\n<p>The test flight is set to proceed despite the uncertainty surrounding Ares I\u2019s future. Hearings in front of politicians in Washington D.C. this past week confirmed that Norm Augustine \u2013 in charge of providing options for President Obama \u2013 believes Ares I-X should launch regardless.<\/p>\n<p>NASA mission updates<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Spaceflight<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Rocket launch schedules<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p>\u201cWe did not discuss Ares I-X (at the Augustine Review),\u201d noted Mr Augustine. \u201c(However,) I did with Gerst (Bill Gerstenmaier\/Associate Administrator, Space Operations Mission Directorate). It\u2019s his call to make. If it was my call, I\u2019d fly it. We\u2019d learn important technical knowledge that we\u2019ve paid to get. If we continue Ares I it\u2019s important, if we don\u2019t continue Ares I we still learn.\u201d<\/p>\n<p>Ares I-X Processing Latest:<\/p>\n<p>With the more realistic October 31 launch target \u2013 a target that has been delayed numerous times during the build-up to the $400m test \u2013 engineers are on track for the rollout of Ares I-X, which will take place just a few days ahead of launch.<\/p>\n<h4 class=\"widget-title penci-border-arrow\">See Also<\/h4>\n<ul>\n<li>Ares I\/I-X Forum Section<\/li>\n<li>L2 Ares I-X Special Section<\/li>\n<li>L2 Ares\/Orion Sections<\/li>\n<li>Click here to Join L2<\/li>\n<\/ul>\n<p>Checkouts are continuing on the power up of the vehicle, which was successfully started a week ago, while testing of the vehicle\u2019s flight control systems and the preparations for the installation of its ordnance have been in focus over the past few days in High Bay 3 of the VAB.<\/p>\n<p>\u201cAres I-X (VAB HB-3) (Pad-B) VAB HB-3: Powered testing and checkouts continue,\u201d noted processing information on L2, before noting a rare processing issue during the flow.<\/p>\n<p>\u201cDuring preps for power up a nonconformance was picked up to document that the GC3 archive server stopped communicating, a reboot corrected the problem. This was not a constraint to power up.<\/p>\n<p>\u201cThis server is used for FR1 personnel to view ADMS data. It is not used for any vehicle commands by flight controls as those are routed through RIC NR1. The team will evaluate and troubleshoot this problem later. The current constraint will be to Launch Vehicle Readiness Test (LVRT).<\/p>\n<p>\u201cTVC (Thrust Vector Control) actuator unpinned testing was completed. Flight controls testing was completed. RoCS channelization set-up complete, testing performed Friday. DFI (Detailed Flight Instrumentation) and Comm testing is planned (end of week through weekend).<\/p>\n<p>\u201cWeekend work: SIGI, Mux Recorder, DFI, and Comm system testing on Saturday. Ordnance installation on Sunday.\u201d<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-11810\" title=\"A3\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2009\/09\/A39.jpg\" alt=\"A3\" width=\"277\" height=\"221\">Also related to the launch, modifications to Pad 39B are nearing an end, as it transforms for a shuttle launch pad into the launch site for Ares I-X.<\/p>\n<p>\u201cPad-B: Working Vehicle Stabilization System (VSS) Hydraulic line installation. Validation testing of the damper arms is planned for next week,\u201d added processing information. \u201cRemainder of Environmental Control System (ECS) validation testing is holding for VSS welding activities. Estimate to recommence testing early next week.\u201d<\/p>\n<p>Once Ares I-X launches, work will pick up on additional pad modifications for Ares I itself, which will include the massive undertaking of a rollercoaster EES (Emergency Escape System) being built on site.<\/p>\n<p>Ares I-X Launch Conflict Evaluations:<\/p>\n<p>While the processing flow remains on target for the Halloween launch, a potential conflict with Atlantis\u2019 STS-129 launch is being evaluated by managers. Currently, Atlantis is set to launch around two weeks after Ares I-X, which means she will already be on Pad 39A when I-X lifts off for Pad 39B on its suborbital flight.<\/p>\n<p>Considerations include a failure of Ares I-X \u2013 especially during very early flight \u2013 which in turn would threaten Atlantis just a short distance away.<\/p>\n<p>\u201cRegarding launch date planning: the 5R (MRM) launch from Russia will stay at November 10. This means that the launch of STS-129\/ULF3 will remain at November 12,\u201d noted Shuttle manager John Shannon on the latest Shuttle Standup\/Integration report \u2013 available on L2 \u2013 outlining the STS-129 launch window based on their discussions with the Russians. \u201cThe goal now is to have a launch window of November 12-16.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-11813\" title=\"A4\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2009\/09\/A48.jpg\" alt=\"A4\" width=\"290\" height=\"225\">\u201cThere is a great deal of discussion between the SSP (Space Shuttle Program) and the CxP (Constellation Program) on how to handle the Ares I-X launch in the same time frame.<\/p>\n<p>\u201cThe team is concentrating on several areas: 1) if there is an issue during launch, what is the probability of impact if the Shuttle is on Pad A and the Ares I-X is on Pad B \u2013 more Range information will be in by mid-October.<\/p>\n<p>\u201c2) how long will it take if there is an anomaly \u2013 on either vehicle \u2013 to disposition the issue and be ready to launch.\u201d<\/p>\n<p>If range evaluations show a potential threat to Atlantis, managers will likely slip Ares I-X to after STS-129\u2019s launch. Ares I-X obviously would not be affected by the Beta cutout that kicks in on November 20.<\/p>\n<p><em><em>L2 members<\/em><\/em><em><em>:&nbsp;Documentation \u2013 from which the above article has quoted snippets \u2013 is available in full in the related L2 sections, now over 4000 gbs in size.<\/em><\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Ares I-X test vehicle is continuing to undergo the business end of processing inside the Vehicle Assembly Building (VAB) \u2013 which includes the installation of its ordnance over the weekend. Meanwhile, Shuttle and Constellation managers are debating its October 31 launch date, due to the proximity of Atlantis\u2019 preparations for her STS-129 launch from [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[9203,9199],"class_list":["post-40986","post","type-post","status-publish","format-standard","hentry","category-news","tag-ares-i-x","tag-sts-129"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/40986"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=40986"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/40986\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=40986"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=40986"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=40986"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}