{"id":41034,"date":"2009-08-04T01:36:41","date_gmt":"2009-08-03T17:36:41","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/discovery-completes-dramatic-rollout-unique-srb-repairs-to-take-place-at-pad\/"},"modified":"2009-08-04T01:36:41","modified_gmt":"2009-08-03T17:36:41","slug":"discovery-completes-dramatic-rollout-unique-srb-repairs-to-take-place-at-pad","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/discovery-completes-dramatic-rollout-unique-srb-repairs-to-take-place-at-pad\/","title":{"rendered":"Discovery completes dramatic rollout \u2013 Unique SRB repairs to take place at Pad"},"content":{"rendered":"<p>With around three weeks until the launch of STS-128, Discovery has finally arrived at Pad 39A, following a dramatic 10 hour-plus rollout on Tuesday. Once at the pad, engineers will incorporate around a week\u2019s worth of changeouts associated with the left Solid Rocket Booster (SRB), following issues with a Check Valve Filter Assembly (CVFA) \u2013 a system that has never required replaced during a KSC flow until now.<\/p>\n<p>STS-128 Latest:<\/p>\n<p>Discovery had spent over a week inside the Vehicle Assembly Building (VAB), undergoing mating with her External Tank (ET-132) and twin SRBs. It\u2019s been an eventful flow ahead of rollout, with a number of engineering challenges noted.<\/p>\n<p>While soft and hard mate procedures went to plan, engineers noted \u201cgalled\u201d threads on the LH2 monoball connector \u2013 which required repair.<\/p>\n<p>\u201cOrbiter: OV-103 \/ ET-132 \/ BI-139\/ RSRM 107 (VAB HB-1) S0004 Orbiter\/ET mate: Repair to the LH2 monoball connector galled threads was completed Friday along with LH2 Monoball installation, mates, and closeouts,\u201d noted processing information on L2.<\/p>\n<p>One of the final procedures ahead of rollout is the Shuttle Interface Test (S0008) \u2013 which checks the connections and interfaces between the orbiter, ET and SRB hardware. This process was completed during Monday processing.<\/p>\n<p>\u201cS0008, Shuttle Interface Test: VAB testing is essentially complete, less SRB hydraulics (IPR-0046). SRB PIC resistance tests, MDM (Multiplexer\/Demultiplexer) verifications, and stray voltage tests are complete,\u201d noted Monday morning processing information. \u201cVAB portion of T-0 and Orbiter\/ET interface leak checks are also complete.\u201d<\/p>\n<\/p>\n<h4 class=\"widget-title penci-border-arrow\">See Also<\/h4>\n<ul>\n<li>STS-128 Processing Latest<\/li>\n<li>L2 STS-128 Section<\/li>\n<li>Click here to Join L2<\/li>\n<\/ul>\n<p>NASA educational resources<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Aerospace &amp; Defense<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>SpaceX<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p>One minor issue related to circuit breakers was noted during the tests. However, this was soon cleared, allowing S0008 operations to be completed.<\/p>\n<p>\u201cDuring preps for S0008 stray voltage checks, noticed that the PIC Rack Circuit breakers were open and should be closed. Unable to determine exactly what opened them. The breakers were closed which solved the problem and Stray Voltage Checks proceeded normally.\u201d<\/p>\n<p>The main problem noted during the weekend \u2013 which ultimately caused the one day slip to the scheduled rollout date \u2013 related to a Check Valve on the left SRB.<\/p>\n<p>\u201cDuring B1009 High Pressure Leak Checks, a loud noise was heard shortly after pressure was applied to the LH SRB tilt system. Engineers were notified on console and noticed a rise in the Gas Generator bed temperature, and secured the system,\u201d added processing information.<\/p>\n<p>\u201cAfter lengthy discussions, the SRB community believes that a check valve failed, which caused the pump and APU (Auxiliary Power Unit) to spin backwards (which caused the noise that was heard), and potentially damaged the flight hardware.<\/p>\n<p>\u201cAs a result, the APU, hydraulic pump and check valve filter assembly will likely need to be R&amp;Red. Engineering is estimating at least a week to R&amp;R, retest, and hot fire the APU. Flow management is evaluating the impacts to the integrated pad flow.\u201d<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-11082\" title=\"S4\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2009\/08\/S4.jpg\" alt=\"S4\" width=\"248\" height=\"180\">Two HPUs (Hydraulic Power Units) are located in each booster\u2019s aft skirt assembly, each of which include an APU, hydraulic pump, a fuel supply and a hydraulic fluid manifold. The hydraulic power they generate supplies the TVC (Thrust Vector Control) system, allowing for the booster nozzles to steer during their two minutes of ascent.<\/p>\n<p>Additional engineering notes acquired by L2 confirmed that some of the associated hardware will require replacement at the pad. At present, impacts to the late August launch date are still being assessed.<\/p>\n<p>\u201cOn Saturday August 1st at approximately 0120 EST during S0008 SRB Hydraulic Initial High Pressure Leak Checks, a loud noise was heard from the Left SRB Aft Skirt when pressure was applied,\u201d outlined the engineering notes.<\/p>\n<p>\u201cAfter securing hydraulics, data revealed that the Left Tilt SRB GG temperature increased 15 degrees in approx 6 minutes. Also, on station technician and engineering noted the on-board SRB hydraulic pump was too hot to touch.<\/p>\n<p>\u201cAn on-board Check Valve Filter Assembly (CVFA) isolates ground hydraulic pressurized flow from the on-board hydraulic pump. If this check valve assembly fails, the hydraulic pump and the SRB APU will spin up backwards. It is suspected that the CVFA failed and spun the on-board hydraulic pump and SRB APU up backwards, which caused the loud noise inside the Left SRB Aft Skirt.<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignleft size-full wp-image-11081\" title=\"S2\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2009\/08\/S2.jpg\" alt=\"S2\" width=\"275\" height=\"226\">\u201cThis failure mode will require R&amp;R of SRB APU, on-board hydraulic pump, and CVFA.\u201d<\/p>\n<p>While engineers are more than capable of troubleshooting at the pad during the scheduled pad flow milestones, this particular hardware has never been replaced whilst the vehicle is in a stacked configuration out at the pad \u2013 or inside the VAB for that matter.<\/p>\n<p>\u201cWe (Ground Ops) have never replaced a Check Valve Filter Assembly in the Aft Skirt. The paper (procedure) will need to be written and reviewed carefully since these R&amp;Rs are not normally performed. Also, since an SRB APU has not been replaced in a long time and the CVFA has never been replaced by Ground Ops, we have little experience with these R&amp;Rs.<\/p>\n<p>\u201cTherefore, these R&amp;Rs will be worked closely with the TVC team as they have more experience with these types of R&amp;Rs. Retest of these R&amp;Rs includes 20 to 25 OMRS (Operational Maintenance Requirements and Specifications) and an on-pad hotfire of the Left SRB HPU systems (Rock &amp; Tilt).\u201d<\/p>\n<p>Just to add to the challenge, no spare SRB APU is on site, meaning the replacement hardware will need to be removed from a downstream flight\u2019s Aft Skirt \u201cbuild-up\u201d \u2013 its status ahead of stacking \u2013 which will subsequently require a new system itself.<\/p>\n<p>\u201cCurrently there are no spare SRB APUs or hydraulic pumps. Therefore, the TVC team will be removing an APU and a pump from one of their Aft Skirt build-ups to get us replacement hardware ASAP. USA (United Space Alliance) Ground Ops will be in work writing disposition tomorrow with help\/insight from design.\u201d<\/p>\n<p>Otherwise, operations proceeded to plan for STS-128, with the logistics payload arriving at the pad, and repairs to ET-132\u2019s pull test holes completed \u2013 the latter allowing for the retraction of the E, D and B platforms that had surrounded the vehicle inside the VAB.<\/p>\n<p>\u201cS0600 Payload Operations: Payload Canister lift\/mate with the PCR (Payload Checkout Room) was completed on Friday. The Payload has been transfer to the PGHM (Payload Ground Handling Mechanism),\u201d processing information added.<\/p>\n<p>\u201cTPS Foam Bond Adhesion: 18 additional pull tests were performed on the -Z side of the external tank on Friday. All pull values were above the 30 psi requirement.\u201d<\/p>\n<p>Discovery is hoping to launch no later than the end of the month, so as to allow for the best possible launch window availability for Japan\u2019s debut flight of the HTV cargo vehicle to the International Space Station (ISS) next month.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-11090\" title=\"S5\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2009\/08\/S5.jpg\" alt=\"S5\" width=\"296\" height=\"221\">However, that launch date was nearly put into doubt when a decision to rollback was almost made during today\u2019s trip to 39A, as the crawler-trasporter started to struggle with mud on the crawlerway.<\/p>\n<p>\u201cTurn before 569 is all mud. We are 100yds from CCF road and crawler trucks are screeching bad. Surveyed remainder of crawlerway and it doesn\u2019t look any better. Have 8\u201d gaps in crawlerway,\u201d noted one NASA Test Director.&nbsp;<\/p>\n<p>\u201cWould be OK to return to VAB because we have already squashed the water out. Recommend return to VAB due to high risk of damaging crawler tracks.\u201d<\/p>\n<p>With bad weather closing in on the KSC area for later in the day, having Discovery stuck out in the middle of the crawlerway would have proven to be very undesirable, and further calls to bring the vehicle back into the VAB were being made.<\/p>\n<p>However, engineers decided they could keep the crawler moving and get Discovery to the pad, as much as rollback was being allowed by management has it been required, with Launch Director Mike Leinbach saying \u201cI don\u2019t give a damn about launch date. Let\u2019s protect this vehicle,\u201d at one point over the ground communication links.<\/p>\n<p>Discovery and her STS-128 stack&nbsp;finally arrived for harddown on Pad 39A, over ten hours after departing from the VAB.<\/p>\n<p>Refer to live update pages \u2013 linked above \u2013 for full rollout coverage and a review of the discussions that took place on a potential rollback.<\/p>\n<p><em><em>L2 members<\/em><\/em><em><em>:&nbsp;Documentation \u2013 from which the above article has quoted snippets \u2013 is available in full in the related L2 sections, now over 4000 gbs in size.<\/em><\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>With around three weeks until the launch of STS-128, Discovery has finally arrived at Pad 39A, following a dramatic 10 hour-plus rollout on Tuesday. Once at the pad, engineers will incorporate around a week\u2019s worth of changeouts associated with the left Solid Rocket Booster (SRB), following issues with a Check Valve Filter Assembly (CVFA) \u2013 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[7806,9205],"class_list":["post-41034","post","type-post","status-publish","format-standard","hentry","category-news","tag-srb","tag-sts-128"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41034"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=41034"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41034\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=41034"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=41034"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=41034"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}