{"id":41039,"date":"2009-07-28T01:52:04","date_gmt":"2009-07-27T17:52:04","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/sts-127-ends-replanned-eva-5-pad-39a-ready-to-support-discovery\/"},"modified":"2009-07-28T01:52:04","modified_gmt":"2009-07-27T17:52:04","slug":"sts-127-ends-replanned-eva-5-pad-39a-ready-to-support-discovery","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/sts-127-ends-replanned-eva-5-pad-39a-ready-to-support-discovery\/","title":{"rendered":"STS-127 ends replanned EVA-5; Pad 39A ready to support Discovery"},"content":{"rendered":"<p>STS-127 has concluded it\u2019s fifth and final EVA, following the pacy completion of EVA-5\u2019s tasks.&nbsp; Meanwhile, at Launch Pad 39A, engineers have completed turnaround procedures to prepare the pad for the arrival of the STS-128 payload on Friday and Discovery early next week.<\/p>\n<p>EVA-5:<\/p>\n<p>As is the case with the ever-changing nature of manned space exploration, changes to planned mission timelines are a routine occurrence.&nbsp;<\/p>\n<p>Given the highly complex nature of the STS-127 assembly mission to the International Space Station (ISS), EVA-5 was planned into the mission timeline to be a catch up day for any mission EVA (Spacewalk) objectives that, for whatever reason, could not be accomplished in their originally planned slots.<\/p>\n<\/p>\n<h4 class=\"widget-title penci-border-arrow\">See Also<\/h4>\n<ul>\n<li>LIVE STS-127 UPDATES<\/li>\n<li>L2 STS-127 Special Section<\/li>\n<li>Click here to Join L2<\/li>\n<\/ul>\n<p>This concept has proved to be invaluable for astronauts Chris Cassidy and Tom Marshburn, who completed the mission\u2019s fifth and final spacewalk on Monday.<\/p>\n<p>Working on a revised EVA schedule, Marshburn and Cassidy were tasked with installing a patch on a panel on the Z1 truss (Cassidy) and removing covers from Canada\u2019s Special Purpose Dexterous Manipulator (Marshburn).<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-10988\" title=\"D2\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2009\/07\/D21.jpg\" alt=\"D2\" width=\"177\" height=\"207\">They also installed the&nbsp;forward and aft cameras (or Vision Equipment as they are called) on the Japanese Exposed Facility (both Cassidy and Marshburn), and were set to move the S3 Zenith Outboard PAS into its deployed cofiguration.<\/p>\n<p>NASA mission updates<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>NASA educational resources<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>SpaceX launch tickets<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p>However, that latter task was deleted during the EVA due to a 5 hours 30 minutes restriction on Cassidy\u2019s METOX limitations. The PAS task would have taken 90 minutes to complete, as&nbsp;a get-ahead task. Several foot restraint tasks \u2013 in order to help STS-128 \u2013 were completed instead.<\/p>\n<p>The contents of EVA-5 had to be replanned primarily because of delays encountered during EVA-3 and the P6 truss battery R&amp;R (removal and replacement) activities.&nbsp;<\/p>\n<p>EVA-3 was supposed to see the R&amp;R of four P6 batteries with EVA-4 seeing the completion of the battery R&amp;R (two batteries) and other scheduled tasks.<\/p>\n<p>However, after just two batteries had been installed on EVA-3, the spacewalk was terminated due to rising CO2 (Carbon Dioxide) levels in Chris Cassidy\u2019s spacesuit.<br \/>\n&nbsp;<br \/>\nTherefore, EVA-4 was devoted to the completion of the battery R&amp;R with other previously planned tasks for EVA-4 slipping into EVA-5.<\/p>\n<p>To accommodate these objective into EVA-5, several get-head tasks originally planned for the spacewalk were deferred until a later time. EVA-5 was set to be&nbsp;scheduled for about six and half hours in duration, but ended after 4 hours and 54 minutes \u2013&nbsp;due to great progress on the opening tasks and the METOX limitation.<\/p>\n<p>Fuel Cell 3 Update:<\/p>\n<p>As noted previously by this site, Shuttle Mission Managers discussed a potential issue with Endeavour\u2019s Fuel Cell 3 (FC-3) in the hours before her launch on July 15.<\/p>\n<p>According FD-2 (Flight Day 2) MMT briefing materials&nbsp;\u2013 available for download on L2&nbsp;\u2013 \u201cPre-launch tests conducted to verify FC-3 KOH values remain within operation limits when FC-3 is loaded at an expected on-orbit SSPTS (Station to Shuttle Power Transfer System)&nbsp;lower power level.\u201d<\/p>\n<p>These tests indicated that FC-3 could be operated at the lower power level without causing \u201ccell flooding.\u201d<\/p>\n<p>However, as Mike Moses, chairman of the pre-launch MMT at the Kennedy Space Center, explained during a pre-launch interview on Wednesday, \u201cAt the pad, water was cycled through the Fuel Cell to verify that we could transfer for drinking water. If we don\u2019t drain the water, it\u2019ll build up. Too much water would let the electrolyte compound (KOH) into Fuel Cell and end up drying out the Fuel Cell,\u201d which would render it inoperative.<\/p>\n<p>Furthermore, Moses explained that \u201cWe can\u2019t monitor the exact KOH concentration on orbit, but we can on the ground. When we run the SSPTS system on orbit, it takes off a lot of the load from the Fuel Cells. That means we don\u2019t dry the fuel cells out enough and the temperatures in the Fuel Cells increase.<\/p>\n<p>\u201cIf we can\u2019t drain the Fuel Cells, then we can\u2019t take as much power from the SSPTS and we lose some mission duration.\u201d<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-10989\" title=\"D3\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2009\/07\/D31.jpg\" alt=\"D3\" width=\"249\" height=\"161\">Following this assessment, the Mission Evaluation Room (MER) processed and approved a request from Electrical, General Instrumentation, and Lighting Engineer to operate FC-3 below the 29 percent KOH limit set by the Combined Environmental Test document rules.<\/p>\n<p>With this new procedure, FC-3 functioned as expected until FD-8.<\/p>\n<p>According to the FD-10 MMT briefing materials \u2013 available for download on L2 \u2013 \u201cFC3 sustaining heater remained powered longer than expected (Mission Elapsed Time 7-days 21-hours 19-minutes 48-seconds to 7-days 21-hours 41-minutes 12-seconds) while the Fuel Cell was at low power levels.\u201d<\/p>\n<p>To preclude the possibility of another heater becoming stuck in the \u2018on\u2019 position, the load on FC-3 was increased by \u201ctaking Main C Bus Tie\u201d to the off position.<\/p>\n<p>As of FD-10, the forward plan was to perform a Main A to B Bus Tie to obtain improved power transfer abilities while still maintaining FC-3 at the higher power level to prevent heater \u201csticking.\u201d<\/p>\n<p>While this new issue with FC-3 was identified quickly, the stuck heater has caused an impact to Endeavour\u2019s consumable (liquid hydrogen and liquid oxygen fuel for the Fuel Cells) status.<\/p>\n<p>According to the preliminary calculations at the end of FD-9, Endeavour\u2019s consumable status with the Station to Shuttle Power Transfer System (SSTPS) was 1-day and 22-hours above the baselined 16+0+2 day mission and 1-day above the baseline without SSTPS.<\/p>\n<p>However, at the end of FD-11, that margin was down to only 22-hours above the baseline with SSTPS and 14-hours without SSTPS.<\/p>\n<p>While this does not affect Endeavour\u2019s mission at the Station, it does affect the time Endeavour can stay on orbit in the event of unfavorable weather at her landing sites or for a unforeseen systems error after undocking.<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignleft size-full wp-image-10990\" title=\"D4\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2009\/07\/D41.jpg\" alt=\"D4\" width=\"297\" height=\"220\">As of now, Endeavour only has two weather waive off days before her onboard fuel status (consumables) would force Flight Directors to land her at the earliest available Primary Landing Site in the U.S. (either the Kennedy Space Center in Florida, White Sands Space Harbor in New Mexico, or Edwards Air Force Base in California).<\/p>\n<p>While this consumable status is perfectly acceptable&nbsp;\u2013 as all Shuttle flights are planned around the potential for at least two weather waive offs&nbsp;\u2013 Flight Directors and Mission Managers always prefer to have a little more consumable margin than just the prescribed minimum.<\/p>\n<p>As such, Mission Managers do not want to violate\/eliminate that two day contingency time.&nbsp; As noted in the FD-10 MMT update, \u201cShould the heater fail on permanently there will be a large margin impact and the FC3 will not be considered usable as a last fuel cell.\u201d<\/p>\n<p>As a result, a request has been submitted to further refine the acceptable KOH concentration levels for FC-3.<\/p>\n<p>\u201cChange KOH concentration lower instrumentation limit from 29 to 24 percent,\u201d notes the MMT FD-10 update.<\/p>\n<p>\u201cBased on the Fuel Cell 3 operational data observed during the Pre-launch FC Low Power test, the Fuel Cell can be operated at lower power levels without the Condenser Exit Temperature set point causing cell flooding.&nbsp; The Fuel Cell was operated over an extended period of time (~1 hr) with the calculated KOH concentration below the 29 percent&nbsp;instrumentation limit without any indications of cell flooding.\u201d<\/p>\n<p>At the time of the FD-10 MMT update, the KOH concentration of FC-3 was holding at ~28.5 percent.<\/p>\n<p>Pad 39A Status Update:<\/p>\n<p>Following the successful launch of Endeavour on July 15, technicians began the process of the turning Pad 39A around to prepare it for the arrival of Space Shuttle Discovery and her associated payload.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-10991\" title=\"D6\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2009\/07\/D6.jpg\" alt=\"D6\" width=\"243\" height=\"144\">These initial inspections revealed two areas of damage on the SRB (Solid Rocket Booster) flame deflector.<\/p>\n<p>\u201cThe SRB Main Flame Deflector liberated fondu-fyre during launch.&nbsp; Two areas, measuring 7\u2032 x 12\u2032 and 3\u2032 x 4\u2032, were identified.&nbsp; These are located on the mid and upper eastern half of the Main Flame Deflector,\u201d noted a daily processing report on L2.<\/p>\n<p>After initial pad inspections were complete, and pad repairs underway, the Mobile Launch Platform (MLP-3) that Endeavour launched off of was moved off the pad to the east refurbishment site to the north side of the VAB.<\/p>\n<p>The final operations performed at Pad 39A included upper and lower jackscrew replacement on the Gaseous Oxygen Vent Arm, replenishment of the Liquid Hydrogen and Liquid Oxygen storage facilities, and SCAPE operations of various fuel meters and systems around the pad area.<\/p>\n<p>As of now, Discovery\u2019s payload (the MPLM Leonardo) is expected to arrive at Pad 39A during the early morning hours of Friday, July 31st with Discovery rolling out to the pad in the early part of the following week.<\/p>\n<p><em><em>L2 members<\/em><\/em><em><em>:&nbsp;Documentation \u2013 from which the above article has quoted snippets \u2013 is available in full in the related L2 sections, now over 4000 gbs in size.<\/em><\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>STS-127 has concluded it\u2019s fifth and final EVA, following the pacy completion of EVA-5\u2019s tasks.&nbsp; Meanwhile, at Launch Pad 39A, engineers have completed turnaround procedures to prepare the pad for the arrival of the STS-128 payload on Friday and Discovery early next week. EVA-5: As is the case with the ever-changing nature of manned space [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[567,9038],"class_list":["post-41039","post","type-post","status-publish","format-standard","hentry","category-news","tag-eva","tag-sts-127"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41039"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=41039"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41039\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=41039"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=41039"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=41039"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}