{"id":41047,"date":"2009-07-17T21:12:46","date_gmt":"2009-07-17T13:12:46","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/sts-127-endeavour-completes-rpm-and-docks-with-iss-tps-latest\/"},"modified":"2009-07-17T21:12:46","modified_gmt":"2009-07-17T13:12:46","slug":"sts-127-endeavour-completes-rpm-and-docks-with-iss-tps-latest","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/sts-127-endeavour-completes-rpm-and-docks-with-iss-tps-latest\/","title":{"rendered":"STS-127: Endeavour completes RPM and Docks with ISS \u2013 TPS latest"},"content":{"rendered":"<p>Endeavour has docked with the International Space Station (ISS) on Flight Day 3, following a stunning RPM (Rbar Pitch Maneuver) \u2013 allowing&nbsp;engineers on the ground to make extensive evaluations into the orbiter\u2019s Thermal Protection System (TPS). So far, engineers expect to see only minor cosmetic damage on Endeavour\u2019s heatshield, following several debris events during her ride uphill on Wednesday.<\/p>\n<p>Endeavour Latest:<\/p>\n<p>Endeavour docked with the&nbsp;ISS\u2019s PMA-2 (Pressurized Mating Adapter) on the Harmony module, marking the start of a busy five EVA docked phase for STS-127.<\/p>\n<p>Endeavour herself continues to perform well, with no technical issues of note listed by the Mission Evaluation Room (MER) \u2013 a list that includes the completed replacement of a Microbial Filter by the crew following a leakage, and similarly a Galley H2O Transfer Hose leak that was ably controlled.<\/p>\n<p>All other items on the list are also minor, such as \u201cduring Post Insertion the crew reported that all of the circuit breakers on panel ML86B, Row F were open,\u201d as reported by the MER.<\/p>\n<h4 class=\"widget-title penci-border-arrow\">See Also<\/h4>\n<ul>\n<li>LIVE STS-127 UPDATES<\/li>\n<li>L2 STS-127 Special Section<\/li>\n<li>Click here to Join L2<\/li>\n<\/ul>\n<p>\u201cA portion of these circuit breakers should be closed during the Switch List for Handover procedures, while the rest should be closed in the Post Insertion. The crew was instructed to close all to match the On-Orbit Switch List procedures.\u201d<\/p>\n<p>Flight Controllers in Houston are also continuing to monitor whether a COMBO (Computation of Misses Between Orbits) related reboost will be required. Those evaluations will be completed later on FD3.<\/p>\n<p>\u201cThere is a potential need to do a reboost following docking due to a COMBO,\u201d noted an overnight shift summary, acquired by L2. \u201cFDO (Flight Dynamics Officer) will continue to obtain tracking data through the night and post-docking to determine whether the reboost will be necessary.\u201d<\/p>\n<p>NASA mission updates<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Company News<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Aerospace industry analysis<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p>\u201cWe are currently tracking a conjunction with Object 84180,\u201d added the publicly released execute package. \u201cThe Time of Closest Approach (TCA) is around 2\/11:08. We have planned a Config 3 reboost at 2\/02:27 to avoid this object if necessary.<\/p>\n<p>\u201cThe plan is to assess the miss distances and probability of collision after tracking out the docking dispersions to determine whether or not we will need to execute the reboost.\u201d<\/p>\n<p>That reboost \u2013 using Endeavour\u2019s venier thrusters to raise the ISS\/Shuttle stack by 0.8m per second over 15 minutes \u2013&nbsp;was&nbsp;later&nbsp;confirmed and was carried out&nbsp;at 7:30pm Central.<\/p>\n<p>TPS Evaluation Latest:<\/p>\n<p>The main interest continues to focus on evaluations into the health of Endeavour\u2019s TPS \u2013 as is the case with all missions. Aiding the evaluations will be the visually beautiful back flip that the orbiter was&nbsp;commanded through, around one hour ahead of docking.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-10852\" title=\"G2\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2009\/07\/G2.jpg\" alt=\"G2\" width=\"272\" height=\"180\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2009\/07\/G2.jpg 272w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2009\/07\/G2-263x175.jpg 263w\" sizes=\"(max-width: 272px) 100vw, 272px\">The RPM \u2013 Rbar denoting along the radius vector of the ISS, downward \u2013 allows the ISS crew to perform a high resolution photo survey of the lower surface TPS tiles to screen for ascent debris damage.<\/p>\n<p>The nine minute maneuver \u2013 which involves the orbiter being commanded through a 360 degree back-flip \u2013 was debuted on STS-114\u2019s Return To Flight mission, following months of planning by shuttle experts at the Johnson Space Center (JSC).<\/p>\n<p>They were tasked with the limitations on crew and sensor visibility, maneuvers conducted about an unstable orbital station keeping position, inherently unstable attitude dynamics, thruster plume impingement on the ISS, shuttle propellant limitations, and a very tight set of lighting and geometry constraints for the inspection photography.<\/p>\n<p>That photography will be downloaded to engineers on the ground, who will carry out what is now a well rehearsed exercise of checking through all areas of Endeavour\u2019s TPS for any areas of concern.<\/p>\n<p>The data will be added to Flight Day 2\u2019s OBSS (Orbiter Boom Sensor System) surveys, along with the already acquired ascent imagery and radar data.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-10853\" title=\"G3\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2009\/07\/G3.jpg\" alt=\"G3\" width=\"246\" height=\"192\">Flight Day 2 photography of Endeavour\u2019s two OMS Pods \u2013 set of hi res images available on L2 \u2013 is also undergoing evaluation, with no concerned noted at present.<\/p>\n<p>Previous missions have shown blankets attached to the associated tiles on the pods can have a tendency to come loose and protrude, although new stitching procedures appear to have mitigated the issue, with no problems observed for a number of recent missions, including STS-127.<\/p>\n<p>Also aiding debris analysis will be camera footage from the two Solid Rocket Boosters \u2013 currently under tow back to the Kennedy Space Center, and due to arrive on Saturday,<\/p>\n<p>\u201cSRB Retrival Status: SRB recovery is going well. Liberty Star with the RH SRB is expected at the dock tomorrow at 0800 EDT and Freedom Star will follow with LH SRB at 1000 EDT,\u201d noted Friday processing information (L2).<\/p>\n<p>\u201cOpen Assessment is scheduled to begin on the Monday at 0700 EDT. An SRB ship crewmember experienced chest pains yesterday. He was stabilized and MEDEVAC\u2019d to Shands Jacksonville.\u201d<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-10856\" title=\"G7\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2009\/07\/G7.jpg\" alt=\"G7\" width=\"287\" height=\"173\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2009\/07\/G7.jpg 287w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2009\/07\/G7-180x110.jpg 180w\" sizes=\"(max-width: 287px) 100vw, 287px\">The importance of checking the orbiter\u2019s TPS is obvious, although there is slightly more interest in Endeavour\u2019s ascent due to dramatic footage of ET-131\u2019s foam liberating at several intervals during ascent.<\/p>\n<p>The main area of foam loss was observed from the intertank ribs on the tank, and while the liberation was very late in ascent \u2013 and thus unlikely to be a TPS damage concern \u2013 evaluations are already taking place on ET-132 (set to fly with Discovery next month) and downstream tanks at the Michoud Assembly Facility (MAF) in New Orleans.<\/p>\n<p>\u201cET-132 \/ BI-139\/ RSRM 107 (VAB HB-1) C and E Platforms are retracted. B and D platforms are on hold at this time pending the need to perform assessment of the Intertank area on ET-132,\u201d noted STS-128 processing information on L2.<\/p>\n<p>The assessments will involve pull tests on the intertank foam, and potentially X-Rays, as engineers check the adhesive properties between the foam and the tank\u2019s structure \u2013 which is currently a leading candidate for the liberations during Endeavour\u2019s ascent.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-10854\" title=\"G4\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2009\/07\/G4.jpg\" alt=\"G4\" width=\"283\" height=\"227\">However, several other foam liberation events were noted at various stages of STS-127\u2019s ride uphill, with the DAT (Damage Assessment Team) mainly focusing on the two events around T+106, where \u201cshowers\u201d of debris could be seen passing by the External Tank camera, before some of the debris impacted the orbiter on the right hand Chine area.<\/p>\n<p>\u201cDAT FD2 Summary: RH Chine damage noted during ascent imagery review (around) 106 sec debris event WLE (Wing Leading Edge) sensor indications,\u201d noted a DAT summary presentation on L2. \u201cFD3 RPM imagery will identify location and magnitude of damage. FD2 scan did not image area.\u201d<\/p>\n<p>The event was similar to STS-125\u2019s Chine damage, although engineers believe Endeavour has suffered even less \u201ccosmetic-level\u201d damage. As noted by Shuttle Manager John Shannon, the footage was more dramatic as the foam liberated from near the ET camera, before hitting the tank\u2019s feedline, breaking up and passing in front of the camera\u2019s immediate field of view.<\/p>\n<p>Also aiding evaluations is date from the WLE IDS (Wing Leading Edge Impact Detection System) \u2013 a suite of sensors embedded into the leading edges of the orbiter\u2019s wings, used to \u201cfeel\u201d for any impacts on the critical flight surfaces.<\/p>\n<p>Seven indications were \u2018felt\u2019 by the sensors on the starboard (right hand) side of the orbiter during ascent, which are likely to relate to the foam liberation events at around T+106 seconds. However, the indications \u2013 rated by Grms ratios \u2013 are all low, thus no damage is likely to have occurred.<\/p>\n<p>It is understood that readings of 10 to 20 Grms and above would become a concern for engineers on the ground. According to the WLE IDS presentation, RCC Panel 9R suffered the largest indication of 3.3 Grms.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-10855\" title=\"G6\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2009\/07\/G6.jpg\" alt=\"G6\" width=\"281\" height=\"224\">\u201cAll WLE IDS ascent summary data was downloaded and down linked successfully. Seventeen (17) half second windows of detailed G time histories were downloaded in order to confirm the implication of cases above 1 Grms. In total, there are ten (10) probable indications,\u201d noted the WLE IDS presentation into Endeavour\u2019s ascent.<\/p>\n<p>\u201cSeven (7) probable indications occurred on the starboard RCC and one (1) probable indication occurred on the port RCC. Two (2) probable indications occurred on the starboard chine. Damage Risk categories for the indications range from Category 1 \u2013 Category 4.<\/p>\n<p>\u201cOverall, background levels for STS-127 are very similar to background levels of previous missions. All units triggered on Main Engine Ignition within 0.15 seconds of each other.\u201d<\/p>\n<p>The system will continue its work on orbit, checking for any impact indications from MMOD. Further indications are not unusual, given the sensitivity of the system.<\/p>\n<p>\u201cWLE IDS On-Orbit Monitoring is currently planned to begin at approximately MET 16:27 Hours with Port and Starboard Group 2.\u201d<\/p>\n<p>The DAT engineers also made a reference to the Nose Landing Gear Door (NLGD) as an area they will be taking a closer look at, once the RPM imagery has been downlinked to the Johnson Space Center (JSC).<\/p>\n<p>\u201cDebris detected near NLGD at around 377 seconds (into ascent). Forward edge imaged during nose cap scan on FD2. Mid area and aft visible in ascent imagery. Nominal FD2 nose scan is not conducive to imaging fwd NLGD area.\u201d However, a debris event at such a late stage of ascent is highly unlikely to have resulted in serious damage.<\/p>\n<p>Chips to tiles around the Main and Nose Landing Gear Doors has been seen on numerous missions in the past \u2013 all of which have been cleared for re-entry.<\/p>\n<p>Further updates will follow. For live, up-to-the-second updates, refer to the live update pages linked above.<\/p>\n<p><em><em>L2 members<\/em><\/em><em><em>:&nbsp;Documentation \u2013 from which the above article has quoted snippets \u2013 is available in full in the related L2 sections, now over 4000 gbs in size.<\/em><\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Endeavour has docked with the International Space Station (ISS) on Flight Day 3, following a stunning RPM (Rbar Pitch Maneuver) \u2013 allowing&nbsp;engineers on the ground to make extensive evaluations into the orbiter\u2019s Thermal Protection System (TPS). So far, engineers expect to see only minor cosmetic damage on Endeavour\u2019s heatshield, following several debris events during her [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[233,9038,7935],"class_list":["post-41047","post","type-post","status-publish","format-standard","hentry","category-news","tag-iss","tag-sts-127","tag-tps"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41047"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=41047"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41047\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=41047"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=41047"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=41047"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}