{"id":41058,"date":"2009-07-04T23:23:48","date_gmt":"2009-07-04T15:23:48","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/constellation-battle-numerous-top-risks-orion-loses-unmanned-capability\/"},"modified":"2009-07-04T23:23:48","modified_gmt":"2009-07-04T15:23:48","slug":"constellation-battle-numerous-top-risks-orion-loses-unmanned-capability","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/constellation-battle-numerous-top-risks-orion-loses-unmanned-capability\/","title":{"rendered":"Constellation battle numerous Top Risks \u2013 Orion loses unmanned capability"},"content":{"rendered":"<p>The Orion Crew Exploration Vehicle (CEV)&nbsp;is undergoing further reductions in its capability \u2013 including the&nbsp;elimination of the vehicle\u2019s unmanned&nbsp;ability \u2013&nbsp;as Constellation managers attempt to resolve numerous issues ahead of the Orion Project PDR (Preliminary Design Review). Issues noted in the recent \u201cTop Risks\u201d review list&nbsp;10 serious issues with the Ares and Orion vehicles, ranging from Ares I-X, through to Orion itself.<\/p>\n<\/p>\n<p>A large amount of uncertainty surrounds the future of the Ares I Crew Launch Vehicle, uncertainty that even led to the high ranking MOD (Mission Operations Directorate) director, Paul Hill, to speak only of his confidence that there will at least be a \u201cfollow on program\u201d \u2013 whatever that may be \u2013 after shuttle is retired, during the end of June All Hands address to MOD staff. (Article to be published in the coming days).<\/p>\n<p>However, it is unlikely any fallout from the Augustine Commission \u2013 which Mr Hill was referencing \u2013 will result in the Ares I-X test flight being cancelled, as the four segment test vehicle attempts to keep to its mid-September launch date.<\/p>\n<p>See all of NASASpaceflight.com\u2019s Constellation related articles:<br \/>\nhttp:\/\/www.nasaspaceflight.com\/news\/constellation\/<\/p>\n<p>Ares I-X Processing Latest:<\/p>\n<p>Although public schedules continue to class Ares I-X as launching at the end of August, internal manifests show Ares I-X as launching NET (No Earlier Than) September 18, with threats of day-to-day slips based on processing milestones.<\/p>\n<h4 class=\"widget-title penci-border-arrow\">See Also<\/h4>\n<ul>\n<li>Constellation Forum&nbsp;Sections<\/li>\n<li>L2&nbsp;Ares I-X&nbsp;Special Section<\/li>\n<li>L2 Ares\/Orion Sections (over several hundred gbs in size)<\/li>\n<li>Click here to Join L2<\/li>\n<\/ul>\n<p>\u201cAccomplishments include the transfer of the Aft Skirt to Rotational Processing Surge Facility (RPSF) and the Forward Assembly to the VAB (Vehicle Assembly Building), the completion of the Forward Assembly Review, and the mating of the Aft Skirt to Aft Motor Segment,\u201d noted an 8th Floor (MOD) overview of status (L2).<\/p>\n<p>Company News<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>SpaceX launch tickets<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Spaceflight history books<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p>However, the opening stacking operations on the handed-over Mobile Launch Platform (MLP) \u2013 one of the key processing milestones \u2013 have been delayed by over a week, due to what appeared to be issues repairing a broken crane that is being tasked with transferring the assembled Aft Booster for its stacking in the VAB. While that is related, tests on the stack\u2019s \u201cintegrity\u201d are being called as per mate review for I-X.<\/p>\n<p>\u201cAres I-X (VAB HB-3\/4) (RPSF) (Pad-B): Aft Booster transfer to pallet on hold for crane repair. Transfer to VAB and stacking moved to next Wednesday, July 8th,\u201d noted the latest daily processing flow information (L2).<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignleft size-full wp-image-10647\" title=\"a2\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2009\/07\/a2.jpg\" alt=\"a2\" width=\"270\" height=\"196\">Based on the realigned flow timeline, Monday will involve work in High Bay 3, relating to MLP Flame trench closeouts. Over in High Bay 4, the forward assembly will be prepared for 5SS Lift\/Mate operations, ahead of Aft Booster stacking on Wednesday.<\/p>\n<p>So far, no alteration to the launch date has been noted on the internal milestones, though it may be expected \u2013 due to the tight flow ahead of rollout to Pad 39B, scheduled for just three days ahead of launch.<\/p>\n<p>\u201cAB Camera &amp; Bracket Installations\/DFI (Development Flight Instrumentation) Cable Bracket Installation complete-to-date. Remaining work will be completed in the VAB,\u201d added other processing notes.<\/p>\n<p>\u201cVAB HB-4 (High Bay 4): Interstage\/Forward Assembly match drilling complete. Stack-1 Modal testing setups are in work. Re-pining pressure transducers in work. US-7 Harness and connector mates continue.<\/p>\n<p>\u201cVAB HB-3: HDP alignment optics in work. Stacking preps continue. No Weekend\/Holiday work planned.\u201d<\/p>\n<p>Ares I-X Major Risks:<\/p>\n<p>As noted on the June 22, 09 \u201cTop Risks\u201d review notes, acquired by L2, Ares I-X has four major issues \u2013 one of which relates to the continually slipping launch date, and three related to technical issues. Levels of \u2018risk\u2019 range from the smallest on the 25 box risk matrix, noted as 1\u00d71 (GREEN), to the highest, seen as 5\u00d75 (RED) \u2013 which list the \u2018Likelihood\u2019 the issue would occur x severity of \u2018Consequence\u2019 such an issue would have on the vehicle.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-10648\" title=\"a3\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2009\/07\/a3.jpg\" alt=\"a3\" width=\"202\" height=\"252\">Interestingly, Thrust Oscillation (TO), even on the Ares I-X four segment \u2013 as opposed to the well know issues with the Ares I five segment \u2013 first stage dominates Ares I-X\u2019s Top Risks findings.<\/p>\n<p>This is despite warnings from the Ares I-X Chief Engineer over a year ago \u2013 as reported by this site \u2013 that TO and vibro-acoustic effects on the vehicle\u2019s Flight Termination System (FTS) required mitigation.<\/p>\n<p>\u201cRequirement: FTS Range frequency \u2013 using current Air Force waiver. FTS Components environments exceeded at T+110 seconds \u2013 end of burn (Thrust Oscillation condition),\u201d wrote the Chief Engineer on his expansive presentation (available on L2) to the Ares I-X System Critical Design Review (CDR) Phase II meeting in June, 2008.<\/p>\n<p>Yet on the June 22, 2009 \u201cTop Risk\u201d review, \u201cThrust Oscillation and its affects on the Flight Termination System (Range Safety),\u201d is classed as a 4\u00d75 risk, showing it\u2019s actually increased as a concern.<\/p>\n<p>That increase is related to the time of ascent where TO\u2019s effects on the vehicle\u2019s FTS exceeds rated vibrational input levels, now deemed as starting around T+70 seconds \u2013 not T+110 seconds \u2013 into flight.<\/p>\n<p>This in turn has placed pressure on obtaining the required Air Force waiver for the range, without which, Ares I-X would not be allowed to launch.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-10649\" title=\"a4\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2009\/07\/a4.jpg\" alt=\"a4\" width=\"240\" height=\"168\">Another waiver will be required on the second \u201cTop Risk\u201d \u2013 related to Thrust Oscillation effects on the first stage TVC (Thrust Vector Control) electronics, used to gimble the solid rocket motor\u2019s nozzle during steering commands. This risk, which is listed as 3\u00d75, makes its debut on the Top Risk list.<\/p>\n<p>However, a waiver on this issue is understood to be less of a problem to acquire, due to the knowledge of the \u201cstock shuttle legacy SRB TVC system\u201d, which Ares I-X will be using.<\/p>\n<p>The biggest risk, a 5\u00d75 risk, relates to the \u201cvibro-acoustic environment input to Upper Stage Simulator (USS) exceeding structural margins.\u201d<\/p>\n<p>Very little is noted on this problem, although a recommendation that the USS should receive additional bracing to carry the higher than anticipated loads is noted as an avenue of mitigation. It is not known if that work has already been added to Ares I-X\u2019s processing flow, although no reference has been made on the daily processing notes.<\/p>\n<p>Ares I-Y Status Update:<\/p>\n<p>The second test flight for Ares \u2013 prior to the \u2018full up\u2019 Ares I unmanned test flight in 2014 \u2013 remains in flux, as managers discuss either the deletion of Ares I-Y, or changes to the vehicle\u2019s configuration and test requirements.<\/p>\n<p>Ares I-Y\u2019s future is embedded into the drive to solve \u201cschedule disconnect\u201d issues that were raised at the start of this year\u2019s PMR (Program Milestone Review or Program Manager\u2019s Recommend) cycle, which showed threats to the entire Constellation schedule, and the possibility that the gap between shuttle retirement and Orion\u2019s FOC (Full Operational Capability) debut on Orion 4 (ISS crew rotation) could be as large as seven years.<\/p>\n<p>With such a gap deemed as unacceptable by Constellation management, Ares I manager Jeff Hanley built his own point-by-point plan to return the schedule back into the March, 2015 IOC (Initial Operating Capability \u2013 or Orion 2) timeframe.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-10650\" title=\"a5\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2009\/07\/a5.jpg\" alt=\"a5\" width=\"248\" height=\"212\">Mr Hanley\u2019s plans included the deletion of the Ares I-Y test flight \u2013 which has now slipped to 2014 \u2013 to be possibly replaced by an Ares I-X hybrid known as Ares I-X Prime, capable of carrying out high abort testing earlier in the Constellation schedule.<\/p>\n<p>These plans remain under discussion, with the latest information \u2013 noted on the latest MOD 8th Floor News \u2013 pointing towards evaluations into flying a reconfigured Ares I-Y vehicle, earlier in the schedule. However, as per evaluation notes, advancing this stage of testing may not be possible.<\/p>\n<p>\u201cAres I-Y flight definition: The Ares Project presented their assessment to determine the earliest possible date to fly I-Y as a powered second stage configuration,\u201d noted the 8th Floor memo (L2).<\/p>\n<p>\u201cThe earliest available Upper Stage is June 2014 (3 month slip to current I-Y date), this is driven by facilities. The earliest available J-2X engine is February 2013 for upper stage integration, this does not support Upper Stage need dates or all testing.<\/p>\n<p>\u201cCurrently Ares I-Y is scheduled for March 2014 with no powered second stage. Many believe that the program needs to demonstrate two unmanned flights prior to the first manned flight, today\u2019s manifest has only one.<\/p>\n<p>\u201cThe board decided not to change the manifest at this time, but a detailed CR (Change Request) with all the proposed changes, including Orion and Ground Operations impacts and test needs, will come to the board in October.\u201d<\/p>\n<p>Ares I itself has three top risks, with First Stage nose first re-entry, now classed as a 4\u00d74 risk and increasing. Range Safety System certification is classed as a 4\u00d75 risk and increasing, while TVC certification is now a noted as a 3\u00d75 risk.<\/p>\n<p>Interestingly, Thrust Oscillation is not listed for Ares I.<\/p>\n<p>Orion Status Update:<\/p>\n<p>Orion is likely to survive any fallout from potential changes to the forward plan for NASA\u2019s return to the moon. However, the manned vehicle is suffering from its own technical challenges, in part due to the continued stripping of its capabilities based on mass growth versus Ares I performance.<\/p>\n<p>Ares I can launch the ISS version of Orion, thanks to a series of mass stripping exercises \u2013 notably the ZBV (Zero Based Vehicle) effort. However, the Lunar Orion\u2019s mass properties \u2013 again based on Ares I\u2019s performance capability \u2013 is a major challenge, seeing its \u201cscore card\u201d mass properties between Orion 606-E (December 2008) and Orion 606-G (May 2009) grow into a RED risk for the program.<\/p>\n<p>Solutions will need to be sought throughout all of the major components on Orion; with the LAS (Launch Abort System), CM (Crew Module), SM (Service Module) and Jettisoned Spacecraft Adapter (SAJ) all trending up in mass \u2013 which includes the breaching of the \u201cmanagers reserves\u201d, set aside for mass growth margins.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-10651\" title=\"a9\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2009\/07\/a9.jpg\" alt=\"a9\" width=\"250\" height=\"180\">Orion is also suffering from problems with its electric power generation and storage margins, which is threatening a redesign of the vehicle\u2019s Solar Arrays\/Panels.<\/p>\n<p>According to documentation, the required margins on the ability for the solar panels to generate enough power for storage in the vehicle\u2019s batteries \u2013 for use during the Lunar Orion\u2019s flight out of sunlight \u2013 is short by 22 percent.<\/p>\n<p>The solutions to this problem would require either an increase in the size of Orion\u2019s solar wings and\/or additional battery storage capacity \u2013 with both options adding yet more mass to the vehicle. The ISS Orion\u2019s electric power generation and storage margins are understood to be within requirements.<\/p>\n<p>Engineering challenges with new flight hardware are commonplace, yet solutions to those problems should also be expected, thanks to the talented engineering workforce Constellation has at its disposal. In Orion\u2019s case, NASA and Lockheed Martin engineers have been meeting at Lockheed\u2019s Denver base to aid that mitigation process.<\/p>\n<p>\u201cMany MOD personnel have been in Denver the last two weeks supporting the Orion Project Subsystem Design Review (SSDR). The purpose of the design review is to resolve issues and close details on the subsystems prior to the Orion Project PDR, which is scheduled for August this year, followed by a software review in November,\u201d noted the 8th Floor.<\/p>\n<p>\u201cMOD folks are heavily engaged at the subsystem level and are providing valuable input to the project. The coordination and integration of the MOD review has been lead by our CEV Operations Manager.\u201d<\/p>\n<p>As previously reported, Orion\u2019s crew capability has been reduced from carrying six crewmembers to four \u2013 with the possibility of adding six person crews after Orion\u2019s design has matured. This drive is part of Mr Hanley\u2019s suggestions for finding get-wells in the vehicle\u2019s development cycle by simplifying the \u201cApollo on Steroids\u201d spacecraft with the aim to increase margin in the overall schedule.<\/p>\n<p>However, Constellation\u2019s management are taking the crew reduction a stage further, by changing Orion\u2019s capability from 0-6 crew (unmanned capability) to 2-4 crew \u2013 with a contingency of no less than one crewmember being able to fly the vehicle. Such a change eliminates Orion\u2019s ability to fly unmanned, which could have been utilized in a number of scenarios.<\/p>\n<p>\u201cOrion Crew Size Requirement: There were a couple of key topics of interest to MOD this week at the CxCB (Constellation Control Board),\u201d noted a memo outlining discussions (L2). \u201cFirst, a change to the requirements for Orion to be capable to fly 0-6 crew to 2-4 crew.<\/p>\n<p>\u201cFour is the requirement for Lunar and flights to ISS do not require 6, thus reducing the maximum crew by 2 will simplify design and build margin in the schedule.\u201d<\/p>\n<p>Orion will be designed with the intent that two crew members will fly the vehicle, but can be operational if only one crew member is available during a contingency event.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-10652\" title=\"a10\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2009\/07\/a10.jpg\" alt=\"a10\" width=\"250\" height=\"185\">\u201cThere was a concern raised that unless 1 crew (one person) is specified, the design will not be driven to make it actually operational by 1 crew,\u201d added the CxCB memo.<\/p>\n<p>\u201cThe Orion Project interpreted the 1 crew requirement to be only contingency, with the focus being on 1 crew being able to control the vehicle and to ingress and egress (hatch operation).<\/p>\n<p>\u201cThe board decision was that the intent is to get one crew back safely, not provide a nominal one crew capability. The design will be for 2-4, with 1 crew contingency. An action given to rewrite the single crew requirement to clearly reflect the intent vs. leaving the contingency words it in the rationale.\u201d<\/p>\n<p>It is not clarified in the CxCB notes as to whether the loss of unmanned capability relates to both ISS and Lunar Orion\u2019s full mission capability, such as Lunar landings \u2013 which currently involve Orion being left unmanned on orbit. If that specific capability is lost, only two crewmembers would be able to undock with Altair and land on the lunar surface, while two crewmembers stay with Orion.<\/p>\n<p>Such a loss of capability is unlikely, due to the massive impact such a decision would have on moon missions. Sources also claim an autonomous capability is likely to remain for leaving Orion in a Lunar orbit, and that the change relates to eliminating Orion\u2019s ability to return to Earth without the aid of the crew.<\/p>\n<p><em><em>L2 members<\/em><\/em><em><em>:&nbsp;Documentation \u2013 from which the above article has quoted snippets \u2013 is available in full in the related L2 sections, now over 4000 gbs in size.<\/em><\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Orion Crew Exploration Vehicle (CEV)&nbsp;is undergoing further reductions in its capability \u2013 including the&nbsp;elimination of the vehicle\u2019s unmanned&nbsp;ability \u2013&nbsp;as Constellation managers attempt to resolve numerous issues ahead of the Orion Project PDR (Preliminary Design Review). Issues noted in the recent \u201cTop Risks\u201d review list&nbsp;10 serious issues with the Ares and Orion vehicles, ranging from [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[9198,9203,9216,640,8184],"class_list":["post-41058","post","type-post","status-publish","format-standard","hentry","category-news","tag-ares","tag-ares-i-x","tag-ares-i-y","tag-orion","tag-sls-orion"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41058"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=41058"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41058\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=41058"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=41058"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=41058"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}