{"id":41064,"date":"2009-06-29T18:47:00","date_gmt":"2009-06-29T10:47:00","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/knob-removed-atlantis-window-inspection-begins-longerons-in-cart-accident\/"},"modified":"2009-06-29T18:47:00","modified_gmt":"2009-06-29T10:47:00","slug":"knob-removed-atlantis-window-inspection-begins-longerons-in-cart-accident","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/knob-removed-atlantis-window-inspection-begins-longerons-in-cart-accident\/","title":{"rendered":"Knob removed, Atlantis window inspection begins \u2013 longerons in cart accident"},"content":{"rendered":"<p>Engineers have successfully removed the work light knob \u2013 embedded between the pressure pane on Atlantis\u2019 pilot window and the dashboard panel \u2013 late on Monday night, after pressurizing the orbiter to aid its liberation. Meanwhile, a cart full of payload bay equipment has fallen off a truck, leading to evaluations on the state of several longerons that were heading for installation into Atlantis.<\/p>\n<p>Atlantis\u2019 Window Latest:<\/p>\n<p>Engineers had an array of options to remove the knob, with a plan to use the least intrusive \u2013 and subsequently less damaging to the window pane \u2013 methods, in the hope of avoiding a requirement to replace the pressure pane, which would result in a standdown of the orbiter for up to six months.<\/p>\n<p>Click here to read the article first revealing the news last week:<br \/>\nhttp:\/\/www.nasaspaceflight.com\/2009\/06\/window-damage-on-atlantis-threatens-six-month-delay-to-sts-129\/<br \/>\nUPDATE, DAMAGE CLEARED:<br \/>\nhttp:\/\/www.nasaspaceflight.com\/2009\/07\/endeavour-into-countdown-atlantis-window-damage-cleared\/<\/p>\n<p>Late on Monday, a technician, an engineer, and a SpaceCraft Operator&nbsp;(SCO) entered Atlantis, ahead of a slight pressurization of the orbiter.<\/p>\n<h4 class=\"widget-title penci-border-arrow\">See Also<\/h4>\n<ul>\n<li>LIVE STS-127 UPDATES<\/li>\n<li>L2 STS-127 Special Section<\/li>\n<li>Click here to Join L2<\/li>\n<\/ul>\n<p>It&nbsp;was hoped that the slight expansion of the flight deck under pressurization will help free the knob. However, Atlantis can only be pressurized to a maximum of 3 psid, compared to the 14.7 psid on orbit. Dry ice&nbsp;was again used to try and shrink the knob to aid it\u2019s removal, although an opening attempt using this method failed.<\/p>\n<p>\u201cPlans for Window 5 have been developed, to remove the knob that is wedged between the panes. The crew module will be pressurized during second-shift (ends midnight) on Monday, in an attempt to dislodge the knob,\u201d noted processing information on L2.<\/p>\n<p>\u201cPreps to configure the crew module for pressurization are expected to be completed 1st shift today with testing to begin on 2nd shift.<\/p>\n<p>NASA mission updates<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Spaceflight news subscription<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Rocket launch schedules<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignleft size-full wp-image-10572\" title=\"b4\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2009\/06\/b4.jpg\" alt=\"b4\" width=\"328\" height=\"230\">The successful removal of the knob late on Monday night has been confirmed, although several opening attempts failed to liberate it.<\/p>\n<p>\u201cThe pressurization of the vehicle and cooling did not remove the knob. The vehicle was pressurized 3.7 psi above ambient to 17.87 psi. The knob was cooled with slugs to -9 deg F. Other options will be discussed to remove the knob,\u201d noted an opening log report last night on L2, prior to success being noted at the end of the second shift.<\/p>\n<p>\u201cThe go ahead was given to use hand pressure to manipulate it loose. The knob is out of the ship. First shift needs to add disposition to take molds of the window.\u201d<\/p>\n<p>\u201cCrew module pressurization testing was successfully completed last night. The knob that had been wedged between the pressure plate and dash structure was liberated at 2247EDT,\u201d confirmed&nbsp;Tuesday morning processing information on L2.&nbsp;\u201cWindow will be inspected for damage using borescope.\u201d<\/p>\n<p>Evaluations into whether Atlantis will require the replacement of the pressure pane are now taking place, with proposals of new inspection methods \u2013 and a special inspection tool \u2013 under development this week.<\/p>\n<p>Small areas of damage have already been observed where the edges of the knob are embedded into the pane, although engineers are hoping the borescope images are showing mainly cosmetic damage, as opposed to a breach of the pane\u2019s safety criteria.<\/p>\n<p>\u201cDiscussions were held with OPO on how best to remove the knob from Window 5. Borescope inspection reveals that the knob is wedged between the panes and may have already done damage,\u201d the Orbiter Project Office (OPO) noted ahead of rhe removal on the Shuttle Standup\/Integration report (L2).<\/p>\n<p>\u201cAfter the knob is removed, in-depth inspection must be performed to determine the extent of damage to the window. If the window must be R&amp;R\u2019d, it will result in a very long downtime (worst case estimates range as far as six months).<\/p>\n<p>\u201cMultiple techniques are being investigated on how best to remove the knob. As the pressure in the crew module decreased from a high of 14.7 psi, the item became stuck. It is hoped that this can be reversed by pressurizing the cabin again. The team will do everything possible to safely remove the knob and salvage the window.\u201d<\/p>\n<p>It has been confirmed by shuttle management that a spare pressure pane for window 5 is in stock, while long lead items such as associated seals are being looked into.<\/p>\n<p>Manifest Impact In Event Of Replacement:<\/p>\n<p>Should evaluations call for the replacement of the pane, Atlantis is likely to be removed from STS-129 duty due to the length of her standdown. Contingency planning is already taking place into handing the flight to Discovery.<\/p>\n<p>Although a stretching of the manifest is unavoidable, the main area of discussion relates to Discovery breaching her eight flight OMDP (Orbiter Maintenance Down Period) limit.<\/p>\n<p>This limit is based on a timeline that was extended in 2007 to allow the fleet to fly out the remaining missions on the manifest, without the one year standdown for their scheduled OMMs (Orbiter Major Modification) periods.<\/p>\n<p>Back in mid-2007, engineers devised a priority list of work that was required on Atlantis, creating \u2018mini-OMDP\u2019 processing which could be conducted inside the OPF during regular post and pre-flight flows.<\/p>\n<p>Atlantis originally had no choice but to retire in 2008, given she was due for her overhaul in that year, which would have been deemed pointless as she would be returning to flight status near the end of the shuttle program. The original plan back in 2007 was to retire Atlantis into a spare parts donor to her sisters after arriving back from STS-125.<\/p>\n<p>However, engineers designed the \u20183 year \/ 8 Flight OMRSD (Operations Maintenance Requirements Specifications Document) Review\u2019, which created the option to extend orbiter\u2019s flight status in-between OMDPs to eight flights and five and a half years \u2013 instead of the previous three years. Only Endeavour was able to fly until 2010 under the previous definitions.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-10571\" title=\"b3\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2009\/06\/b3.jpg\" alt=\"b3\" width=\"252\" height=\"219\">Following PRCB (Program Requirements Control Board) approval, the FAWG (Flight Assignment Working Group) handed two \u201cextra\u201d missions to Atlantis, thus reducing the burden on Endeavour and Discovery.<\/p>\n<p>The Space Shuttle Program (SSP) also successfully argued the importance of flying out the schedule with three orbiters, so as to ensure an on time transition of shuttle resources to Constellation, ultimately resulting in NASA approval of the plan.<\/p>\n<p>However, the incident with Atlantis has now switched focus back to Discovery, with the addition of STS-129 \u2013 should Atlantis\u2019 pressure pane require replacement \u2013 breaching those refined OMRSD rules.<\/p>\n<p>\u201cIf a ninth flight is required for OV-103 (Discovery) to complete the manifest, we run into issues with the mandatory OMM scheduled after its eighth flight,\u201d added the Orbiter Project, via the Standup (L2).<\/p>\n<p>\u201cThe current manifest does not afford room for an OMM. Initial work is in progress to determine what items can be waived or pushed off to a later date and what work will have to be slotted into the flows as time allows.<\/p>\n<p>\u201cThe OMDP requirements (roughly 830) are being scrutinized in case a ninth flight is required on OV-103. Good rationale exists for about 380 of these requirements and the remaining 450 are being investigated. In the past, the OMM has been extended past eight flights, based on appropriate flight rationale. This is being researched.\u201d<\/p>\n<p>Longeron Cart Accident:<\/p>\n<p>Evaluations are taking place on several items of payload equipment that fell of a truck that was transporting the hardware to Atlantis\u2019 OPF last week. The cart contained several structural beams \u2013 known as longerons \u2013 that are installed between bays for supporting payloads.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-10570\" title=\"b2\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2009\/06\/b2.jpg\" alt=\"b2\" width=\"267\" height=\"210\">\u201cDuring transport of the longerons for OV-104 (Atlantis), the work cart holding the equipment fell off of the truck. The Accident Investigation Team reported immediately to the scene. Payload Engineering also responded to monitor lifting and securing the cart,\u201d noted processing information on L2 late last week.<\/p>\n<p>\u201cThe equipment was moved back to the Flight Kit Facility processing area to be secured. Evaluation and unpackaging of the container has begun. The hardware consisted of three longeron latch assembly build-ups (Bay 6 Starboard, Bay 10 Starboard, and Bay 10 Port). These three assemblies consist of roughly 150 unique piece-parts.\u201d<\/p>\n<p>It is hoped most of the hardware is still acceptable for flight, and subsequently will not become a schedule impact to STS-129 \u2013 regardless of the evaluations into Atlantis\u2019 Window 5 pressure pane.<\/p>\n<p>\u201cInitial evaluation to the manifest impact shows two of three longerons available (missing the Bay 10 Starboard), and one of three latches are available (missing the Bay 6 Starboard and Bay 10 Port),\u201d added the report. \u201cThe Bay 10 latch is a standard weight latch, but there is a middleweight latch available.<\/p>\n<p>\u201cThe Bay 6 latch is a lightweight item, but there is a middleweight latch available. This issue will be worked with the Engineering Community to see if these are acceptable. Worst case outcome at this time is for the Bay 10 Starboard longeron.<\/p>\n<p>\u201cThe investigation into the root cause of this accident is ongoing, and a safety stand-down of all three shifts of transportation drivers was held. All packaging and transportation procedures were revisited before they were released to do more work.\u201d<\/p>\n<p>The incident is understood to have occurred when the truck turned a corner just outside the OPF buildings. The cart wheel\u2019s locking system is believed to have failed.<\/p>\n<p><em><em>L2 members<\/em><\/em><em><em>:&nbsp;Documentation \u2013 from which the above article has quoted snippets \u2013 is available in full in the related L2 sections, now over 4000 gbs in size.<\/em><\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Engineers have successfully removed the work light knob \u2013 embedded between the pressure pane on Atlantis\u2019 pilot window and the dashboard panel \u2013 late on Monday night, after pressurizing the orbiter to aid its liberation. Meanwhile, a cart full of payload bay equipment has fallen off a truck, leading to evaluations on the state of [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[9199,9006],"class_list":["post-41064","post","type-post","status-publish","format-standard","hentry","category-news","tag-sts-129","tag-window"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41064"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=41064"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41064\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=41064"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=41064"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=41064"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}