{"id":41067,"date":"2009-06-27T01:52:50","date_gmt":"2009-06-26T17:52:50","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/et-131-repair-proceeding-to-plan-confidence-root-cause-has-been-found\/"},"modified":"2009-06-27T01:52:50","modified_gmt":"2009-06-26T17:52:50","slug":"et-131-repair-proceeding-to-plan-confidence-root-cause-has-been-found","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/et-131-repair-proceeding-to-plan-confidence-root-cause-has-been-found\/","title":{"rendered":"ET-131 repair proceeding to plan \u2013 confidence root cause has been found"},"content":{"rendered":"<p>Preparations for next Wednesday\u2019s tanking test are proceeding well, with the flight seal now replaced ahead of weekend work to reinstall the Quick Disconnect (QD) on the Ground Umbilical Carrier Plate (GUCP). A successful tanking test is expected, due to \u201chigh confidence\u201d a misalignment was responsible for at least STS-127\u2019s scrub.<\/p>\n<p>ET-131 Latest:<\/p>\n<p>Engineers have been carrying out a complex procedure to replace the flight seal, compared to the first scrub turnaround of STS-127, in an attempt to prove \u2013 and subsequently mitigate \u2013 the root cause of the leaks suffered by ET-131\u2019s two tankings.<\/p>\n<p>\u201cPlanning continues to progress for a tanking test (S0037), targeted for next week, to assess the effectiveness of the GUCP troubleshooting effort,\u201d outlined confirmation the current plan is on track, via processing latest (L2).<\/p>\n<h4 class=\"widget-title penci-border-arrow\">See Also<\/h4>\n<ul>\n<li>LIVE STS-127 UPDATES<\/li>\n<li>L2 STS-127 Special Section<\/li>\n<li>Click here to Join L2<\/li>\n<\/ul>\n<p>\u201cPending successful installation of the new seal (complete) and QD (in work), the call to stations is currently scheduled for 20:30 EDT, Monday, 29 June 2009. Filling of the External Tank should begin at 0700 EDT on Wednesday, 01 July 2009.\u201d<\/p>\n<p>It\u2019s been a busy couple of days at Pad 39A, with engineers working through the three shifts on a dual approach of replacing the GUCP hardware, whilst taking numerous measurements of the system, in order to build the database of information for engineers working on the mitigation plan.<\/p>\n<p>\u201cNumerous measurements and observations were made on the hardware during disassembly and that data is being compiled and evaluated by the respective teams,\u201d added information via L2.<\/p>\n<p>\u201cThe development of a concentricity tool is complete and the offline process development test in the VAB (Vehicle Assembly Building) with the GSE (Ground Support Equipment) test panel and two part seal was successfully performed.<\/p>\n<p>Aerospace &amp; Defense<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Technology News<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Spaceflight history books<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignleft size-full wp-image-10540\" title=\"g2\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2009\/06\/g2.jpg\" alt=\"g2\" width=\"270\" height=\"191\">Following the removal of the GUCP QD this week, strain gauges were installed on to the hardware \u2013 which in turn will provide data during Wednesday\u2019s tanking test. Also, several elements of the removed GUCP hardware are being examined, such as the pyro bolt \u2013 now enroute to the Marshall Space Flight Center (MSFC).<\/p>\n<p>\u201cThe ordnance (pyro) bolt R&amp;R was completed and the bolt is expected to arrive at MSFC for NDE (Non Destructive Evaluation) testing on Saturday,\u201d added Friday processing information.<\/p>\n<p>With data comparisons between the first and second scrubs now fully evaluated, confidence is high that the previously noted misalignment issue \u2013 related to the External Tank Carrier Assembly (ETCA) mounts, or feet \u2013 was the cause of both scrubs.<\/p>\n<p>However, there appears to be a lack of reference to the root cause of ET-127\u2019s scrub during STS-119, other than Flight Readiness Review (FRR) documentation noting alignment issues during the GUCP\u2019s installation inside the VAB on both STS-119 and STS-127\u2019s tanks. For the interim, engineering notes only refer to Endeavour\u2019s ET-131.<\/p>\n<p>\u201cThe engineering teams, after much analysis of the measurement data between the 2nd scrub disassembly and the 1st scrub disassembly have high confidence that misalignment is the issue,\u201d added engineering notes (L2).<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-10541\" title=\"g3\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2009\/06\/g3.jpg\" alt=\"g3\" width=\"335\" height=\"188\">\u201cThe carrier plate was realigned using the high fidelity 0.515\u201d alignment pins and a check of the pivot assembly feet indicated that an interference condition exists between the feet and the pivot support brackets.<\/p>\n<p>\u201cFaro Arm optics measurements were performed Thursday night on the gap between the pivot support bracket and the bracket feet with the feet placed in the nominal centered position on the pivot pins.<\/p>\n<p>\u201cThese gap measurements were then used to develop a CAD drawing that will used to machine new feet specifically tailored for ET-131. In addition, concentricity measurements were also performed to verify that the plate, once aligned, will indeed result in acceptable alignment of the flight seal and QD bellows probe when the QD is reinstalled.\u201d<\/p>\n<p>With the alignment issues understood, a new flight seal (a new two-part flight seal) installed, and an array of instrumentation available to monitor the GUCP hardware during tanking, engineers are confident the tanking test will prove to be successful \u2013 allowing STS-127 to realign for a July 11 launch to the International Space Station.<\/p>\n<p>Engineers will continue to work out at the pad over the weekend, installing the GUCP QD and remating the vent line \u2013 prior to conducting leak checks, measurements, and inspections on the tank.<\/p>\n<p>For all 17 NASASpaceflight.com articles on the GUCP, click here: http:\/\/www.nasaspaceflight.com\/tag\/gucp\/<\/p>\n<p>ET-131\u2019s PRCB Note Of Interest:<\/p>\n<p>ET-131\u2019s GUCP hardware also gained a section of the \u201cQuarterly Process Escape Summary, 2nd Quarter Fiscal Year 2009 (Reporting Period: January through March 2009)\u201d presentation to the all-powerful Program Requirements Control Board (PRCB) meeting on Thursday. (Presentation available on L2).<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-10542\" title=\"g4\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2009\/06\/g4.jpg\" alt=\"g4\" width=\"358\" height=\"268\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2009\/06\/g4.jpg 358w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2009\/06\/g4-350x262.jpg 350w\" sizes=\"(max-width: 358px) 100vw, 358px\">The \u201cIncorrect Washer Stack Between GUCA Foot and Leg Assembly\u201d report is not understood to be related to the root cause of the tank\u2019s scrubs, despite the that specific area of the tank being of interest during the investigation.<\/p>\n<p>\u201cProcess Escape Description: Ground Umbilical Carrier Plate (GUCP) pivot assemblies were incorrectly assembled with one washer, instead of three washers as required by the drawing, in each pivot assembly bolt stack,\u201d outlined the presentation, dated June 25.<\/p>\n<p>\u201cProximate Cause: In February 2005, the GUCP post-launch refurbishment procedure was updated to reflect the complete design modification of the GUCP Leg assemblies. Part of the design change included the use of three (3) washers versus one (1) washer to reduce thread protrusion due to the lengthening of the bolts.<\/p>\n<p>\u201cThe change to the number of washers was inadvertently omitted from the procedure update. Subsequent review in place at that time failed to identify the omission.\u201d<\/p>\n<p>Despite the issue being classed only as a \u201cgreen\u201d risk, NASA managers take all design issues \u2013 even a few missing washers \u2013 very seriously.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-10543\" title=\"g5\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2009\/06\/g5.jpg\" alt=\"g5\" width=\"348\" height=\"232\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2009\/06\/g5.jpg 348w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2009\/06\/g5-263x175.jpg 263w\" sizes=\"(max-width: 348px) 100vw, 348px\">However, an interesting reference is made to modifications that have been carried out on the Ground Umbilical Carrier Assembly (GUCA) \u2013 central to the recent leaks and scrubs \u2013 and the approval of flight rationale from ET-127, the tank that leaked on STS-119\u2019s first attempt.<\/p>\n<p>\u201cIt should be noted that this change was implemented with a full compliment of other modifications done to the GUCA\u2019s which included multiple changes to the drawing. All other drawing changes were successfully implemented, however the washer additions were inadvertently missed,\u201d added the presentation.<\/p>\n<p>\u201cRationale for Flight: Approval was obtained for ET-127 since vent line was in flight configuration and access was limited. The GUCPs for External Tanks (ET-130, ET-131 and ET-132) in process since discovery of this condition were corrected to reflect proper drawing configuration. The GUCA, GUCP, and legs are cleaned, processed, and refurbished after each flight.<\/p>\n<p>\u201cLessons Learned: When major design modifications are incorporated into work instructions, attention to detail is required to ensure all changes are included. Controls that rely on human behavior require constant monitoring through measurement, reporting and investigation of any errors to understand possible improvement opportunities to the process.\u201d<\/p>\n<p>Given no reference is made to the leak issues with either ET-127 or ET-131, the incorrect hardware configuration is likely to be coincidental, as opposed to linked to the recent scrubs.<\/p>\n<p><em><em>L2 members<\/em><\/em><em><em>:&nbsp;Documentation \u2013 from which the above article has quoted snippets \u2013 is available in full in the related L2 sections, now over 4000 gbs in size.<\/em><\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Preparations for next Wednesday\u2019s tanking test are proceeding well, with the flight seal now replaced ahead of weekend work to reinstall the Quick Disconnect (QD) on the Ground Umbilical Carrier Plate (GUCP). A successful tanking test is expected, due to \u201chigh confidence\u201d a misalignment was responsible for at least STS-127\u2019s scrub. ET-131 Latest: Engineers have [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[9122,9217],"class_list":["post-41067","post","type-post","status-publish","format-standard","hentry","category-news","tag-gucp","tag-sts_127"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41067"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=41067"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41067\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=41067"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=41067"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=41067"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}