{"id":41087,"date":"2009-05-31T18:12:24","date_gmt":"2009-05-31T10:12:24","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/endeavour-arrives-at-pad-39a-atlantis-heading-to-biggs-texas-on-monday\/"},"modified":"2009-05-31T18:12:24","modified_gmt":"2009-05-31T10:12:24","slug":"endeavour-arrives-at-pad-39a-atlantis-heading-to-biggs-texas-on-monday","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/endeavour-arrives-at-pad-39a-atlantis-heading-to-biggs-texas-on-monday\/","title":{"rendered":"Endeavour arrives at Pad 39A \u2013 Atlantis heading to Biggs, Texas on Monday"},"content":{"rendered":"<p>The high tempo pace of shuttle processing continues through the weekend and earlier into next week, with Atlantis\u2019 departure from California on top of the Shuttle Carrier Aircraft (SCA) set for Monday and Endeavour\u2019s pad swap on&nbsp;Sunday morning. Endeavour will be arriving at a Pad 39A that has undergone several repairs, following damage sustained during STS-125 launch.<\/p>\n<p>Atlantis Latest:<\/p>\n<p>The SCA\/Atlantis duo were set to leave California on Sunday, before a couple of weather related delays in the flow forced managers to change the schedule on Friday night, with departure from Dryden moved to no earlier than Monday.<\/p>\n<p>It was the unusual occurrence of storms in the desert region where Atlantis landed at the conclusion of STS-125 that interrupted the timeline for the installation of the tailcone that surrounds the orbiter\u2019s aft hardware to reduce drag during the piggyback journey across the States.<\/p>\n<h4 class=\"widget-title penci-border-arrow\">See Also<\/h4>\n<ul>\n<li>LIVE STS-125 UPDATES<\/li>\n<li>L2 STS-125\/400 Special Section<\/li>\n<li>MAX Q\u2019s STS-125 Review Video<\/li>\n<li>Click here to Join L2<\/li>\n<\/ul>\n<p>\u201cPost Landing Ops: Facility Power breakers are still operating nominally. EMUs are removed and the airlock is closed. Tile post flight inspections complete. Pyro Safing is complete. Fuel cell purges are complete. Water drain was completed. Eight orbiter side tailcone fittings are installed,\u201d noted processing information on L2.<\/p>\n<p>\u201cSCAPE operations for hyper de-servicing were completed. Shuttle Carrier Aircraft (SCA) polarity checks were successfully completed.\u201d<\/p>\n<p>The removal of the support structure \u2013 used for the mating of the tailcone to the orbiter \u2013 was also slightly problematic, due to tight clearance margins between the structure and Atlantis\u2019 body flap. Final work involved the retraction of the landing gear and the closure of the associated doors.<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignleft size-full wp-image-10158\" title=\"a228\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2009\/05\/a228.jpg\" alt=\"a228\" width=\"291\" height=\"193\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2009\/05\/a228.jpg 291w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2009\/05\/a228-263x175.jpg 263w\" sizes=\"(max-width: 291px) 100vw, 291px\">This marked the end of hydraulic operations and tailcone installation work, with Atlantis scheduled to be raised on the MDD (Mate Demate Device) at 8am (local time) on Sunday, before the converted 747 takes its position below the orbiter at 10am. The rest of Sunday will be dedicated towards the mating of Atlantis on top of the SCA.<\/p>\n<p>Aerospace &amp; Defense<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>NASA educational resources<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Spaceflight history books<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p>This will be followed by the Ferry Flight Readiness Review (FFRR), which will also plan out the route the SCA\/Atlantis duo will take over the mainland United States, resulting in an arrival back at the Kennedy Space Center (KSC) \u2013 depending on weather \u2013 sometime on Tuesday. Refer to the live coverage pages for updates.<\/p>\n<p>Other work that has taken place during Atlantis\u2019 Californian vacation includes the removal of her GH2 Flow Control Valves (FCVs), which allowed for delivery to the valve\u2019s contractor, Vacco, to be checked for any cracks that may have been suffered during Atlantis\u2019 launch.<\/p>\n<p>Click here for NASASpaceflight.com articles&nbsp;on the FCV issue since STS-126.<\/p>\n<p>\u201cIn support of OV-104, the FCVs will be hand-delivered to the vendor. Once there, they will go through eddy-current testing,\u201d noted the latest Shuttle Standup\/Integration report on L2, although it has been noted that ascent data pointed towards no issues with the valves during the STS-125 ride uphill.<\/p>\n<p>Earlier in the pre-Ferry flow, engineers also took the opportunity to begin testing of the Aerosurface Servoamplifer (ASA) wiring, following the failure of one of the four channels on STS-125 \u2013 caused by the noise of Space Shuttle Main Engine (SSME) ignition.<\/p>\n<p>\u201cThe DFRC (Dryden Flight Research Center) team has been directed to perform ASA #1 (IPR 129V-0002) troubleshooting,\u201d added processing information. \u201cThe plan was to take resistance measurements on the orbiter wiring and into ASA #1. The vehicle was then reconfigured for ferry flight.\u201d<\/p>\n<p>Further testing will take place inside the Orbiter Processing Facility (OPF) once Atlantis has returned to KSC, which will hopefully result in additional data for STS-127\u2019s flight rationale when managers meet for the Agency Flight Readiness Review (FRR) next week.<\/p>\n<p>Atlantis is departing at 8am local time on Monday and heading to Biggs, Texas on the first leg of her journey.<\/p>\n<p>Endeavour Latest:<\/p>\n<p>Back at KSC, Endeavour swapped pads from 39B to 39A, which will mark the end of shuttle operations at 39B, prior to being turned over for the Ares I-X launch (date remains under review). Endeavour had taken vacancy of 39B for the STS-400 LON (Launch On Need) requirement in support of STS-125.<\/p>\n<h4 class=\"widget-title penci-border-arrow\">See Also<\/h4>\n<ul>\n<li>LIVE STS-127 UPDATES<\/li>\n<li>L2 STS-127 Special Section<\/li>\n<li>Click here to Join L2<\/li>\n<\/ul>\n<p>Now in a tight flow towards the STS-127 launch date, Endeavour was backed out of STS-400 processing, which involved the removal of the ordnance, to be reinstalled once she\u2019s on Pad 39A. However, a large amount of STS-400 pad flow work already conducted on the stack, which removes around two weeks of processing from the STS-127 flow on Pad 39A.<\/p>\n<p>\u201cS0024 Prelaunch propellant servicing was completed. S5009 Ordnance disconnects in preparation for roll to Pad A completed. S0038 preps for roll-around to Pad A began Thursday. First motion to Pad A is now planned for 0001 hrs on Sunday,\u201d noted processing information on L2.<\/p>\n<p>\u201cS0017 Terminal Count Demonstration Test has been rescheduled to Wednesday\/Thursday next week to provide additional time to complete the above work. Preparations continue at Pad A for OV-105 (Endeavour) rollover\/rollaround, currently scheduled for Sunday.\u201d<\/p>\n<p>The scheduled start time for first motion was delayed for several hours, with a requirement to back out and realign the Crawler Transporter (CT) under the Mobile Launch Platform (MLP) twice. The stack eventually started to depart the pad shortly before 2:30am local time.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-10159\" title=\"a321\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2009\/05\/a321.jpg\" alt=\"a321\" width=\"284\" height=\"174\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2009\/05\/a321.jpg 284w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2009\/05\/a321-180x110.jpg 180w\" sizes=\"(max-width: 284px) 100vw, 284px\">Endeavour arrives at a repaired Pad 39A, following damage sustained to several areas of the pad during STS-125\u2019s launch, mainly on the Solid Rocket Booster (SRB) flame deflector. Around two weeks of repairs took place on the trench, which required a new coat of fondu fyre refractory concrete.<\/p>\n<p>None of the resulting debris from the flame deflector held any risk of impacting the shuttle during launch \u2013 although it gained a large amount of documentation in the STS-125 IFA (In Flight Anomaly) and STS-127 SSP FRR (Space Shuttle Program Flight Readiness Review) presentations.<\/p>\n<p>\u201cFlame Deflector Repairs standard turnaround operation. West SRB side is typically damaged. The direction of STS-125 liberations were within model predictions. Areas of liberation was identified as non-mandatory repair,\u201d noted the opening page of the damage overview in the STS-127 SSP FRR presentations (30 of which are available on L2).<\/p>\n<p>\u201cActions Taken\/Planned: Inspection complete \u2013 looks for cracks and dislodged pieces \u2013 repairs identified. Additionally, tap testing for hollow sounding areas is performed (complete) \u2013 historically, hollow areas were trended for growth, if growth then repaired (complete).<\/p>\n<p>\u201cHydro-blasting in preparation for new application is a recent enhancement (complete). All priority levels of damage on SRB deflector including hollow areas are to be repaired prior to STS-127 (complete).<\/p>\n<p>\u201cAgreement with STS-127 Payload Customer allows for application after Payload to Pad A and is inside PCR (Payload Changeout Room) with PCR doors closed (complete. \u201cStudy in work with Orbiter to capture and investigate concerns with potential TPS contamination if future application required concurrent with STS at Pad. Sampling and testing are planned.\u201d<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-10160\" title=\"a411\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2009\/05\/a411.jpg\" alt=\"a411\" width=\"333\" height=\"263\">The force of Atlantis\u2019 launch also damaged several pneumatic lines at the pad, which have also been repaired ahead of STS-127\u2019s arrival at the pad on Sunday.<\/p>\n<p>\u201cLH2 North Bridge Disconnect Tower Pneumatic Line Damage: During STS-125 launch Fondu Fyre Debris liberation impacted various tubing\/lines on NE pad surface near MLP (Mobile Launch Platform) post #1.<\/p>\n<p>\u201cNo line ruptures or leaks occurred. GH2 line could have been isolated. Repairs were required prior to STS-127<\/p>\n<p>\u201cAction Taken\/Planned: Repairs Complete. Fabrication of lines and welding of lines and x-rays. Welding of new supports. All areas are now per print, no deltas.<\/p>\n<p>\u201cInvestigation in work to identify all similar commodity and communication service lines that are at risk for similar damage. Review for susceptibility for damage, LPS visibility, isolation and safing capability to be carried out.\u201d<\/p>\n<p>Despite the successful completion of repairs \u2013 which was never in any doubt to support STS-127\u2019s launch date \u2013 Sunday\u2019s rollover places Endeavour\u2019s flow at minus one day on available contingency for a June 13 launch.<\/p>\n<p>Although the launch date won\u2019t be set until next week\u2019s Agency FRR, Mission Management Team (MMT) co-chair Leroy Cain and SSP manager John Shannon understand they face a challenge to be in a posture that will allow for three launch attempts.<\/p>\n<p>However, as is typical of their management style, if they are forced to slip, \u201cso be it\u201d, as the Program works to a mantra of \u201csafety first\u201d.<\/p>\n<p>\u201cThe STS-127\/2JA SSP FRR went well. The team at the launch site is working extremely hard to get Endeavour ready for this mission,\u201d added the Standup. \u201cLet us be sure to stay within our processes, to ensure safety at all times.<\/p>\n<p>\u201cAt the end of the FRR yesterday, John Shannon remarked on the challenges we face to get to a launch date of June 13. Mr. Cain reiterated that we have just come off of an extremely challenging mission where everyone performed in an outstanding manner. We need to stay focused, exercise due diligence in everything we do, and maintain the rigor we have in our processes.<\/p>\n<p>\u201cIf we have to slip the launch date to fly safely, so be it. First and foremost, we need to be taking care of our people. Rotate in your deputies and backups as needed so people get some downtime. There is no more important launch than the next one, so please be considerate of your people.<\/p>\n<p>\u201cIf there are any concerns, do not hesitate to push them forward. It is management\u2019s job to be sure that we have done the things that need to be accomplished, so the Program is ready to fly.\u201d<\/p>\n<p><em><em>L2 members<\/em><\/em><em><em>:&nbsp;Documentation \u2013 from which most of the above article has quoted snippets \u2013 is available in full in the related L2 sections, now over 4000 gbs in size<\/em><\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The high tempo pace of shuttle processing continues through the weekend and earlier into next week, with Atlantis\u2019 departure from California on top of the Shuttle Carrier Aircraft (SCA) set for Monday and Endeavour\u2019s pad swap on&nbsp;Sunday morning. Endeavour will be arriving at a Pad 39A that has undergone several repairs, following damage sustained during [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[9131,8290,9038],"class_list":["post-41087","post","type-post","status-publish","format-standard","hentry","category-news","tag-sca","tag-sts-125","tag-sts-127"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41087"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=41087"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41087\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=41087"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=41087"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=41087"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}