{"id":41102,"date":"2009-05-16T18:04:33","date_gmt":"2009-05-16T10:04:33","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/endeavour-waits-for-sts-400-standdown-sts-125-flies-through-eva-3\/"},"modified":"2009-05-16T18:04:33","modified_gmt":"2009-05-16T10:04:33","slug":"endeavour-waits-for-sts-400-standdown-sts-125-flies-through-eva-3","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/endeavour-waits-for-sts-400-standdown-sts-125-flies-through-eva-3\/","title":{"rendered":"Endeavour waits for STS-400 standdown \u2013 STS-125 flies through EVA-3"},"content":{"rendered":"<p>While STS-125 continues to enjoy a successful Hubble servicing mission \u2013 marked by&nbsp;a hugely successful&nbsp;third spacewalk&nbsp;\u2013 Endeavour has progressed to a standby point for her STS-400 LON (Launch On Need) role, which is expected to be stood down after the Damage Assessment Team (DAT) evaluation of Late Inspection data near the end of Atlantis\u2019 mission.<\/p>\n<p>STS-400 Status:<\/p>\n<p>The unique rescue mission was designed due to the unavailability of the International Space Station (ISS) as a \u2018safe haven\u2019 for the STS-125 crew&nbsp;in the event of serious damage being found on the orbiter.<\/p>\n<p>Following a successful launch and clearance of Atlantis\u2019 Thermal Protection System (TPS) for re-entry, it would take a freak incident \u2013 such as a major MMOD strike \u2013 to cause managers to place Endeavour into a launch pose.<\/p>\n<h4 class=\"widget-title penci-border-arrow\">See Also<\/h4>\n<ul>\n<li>LIVE STS-125 UPDATES<\/li>\n<li>LIVE STS-127 UPDATES<\/li>\n<li>L2 STS-125\/400 Special Section<\/li>\n<li>L2 STS-127 Special Section<\/li>\n<li>Click here to Join L2<\/li>\n<\/ul>\n<p>However, that\u2019s exactly what Endeavour has been working towards over the past few weeks, allowing for a rescue mission to be launched within days \u2013 should a major problem be found during Late Inspections.<\/p>\n<p>\u201cSTS-400 LON S0007 Launch Countdown pre-ops continue,\u201d noted Endeavour\u2019s processing flow at Pad 39B via L2. \u201cS1287 Orbiter Aft Closeout continues. 50-1\/2 door installation and Aft confidence test is scheduled for Friday.<\/p>\n<p>Endeavour will hold at this point of her flow, pending a Mission Management Team (MMT) decision to either proceed or standdown from the STS-400 requirement next week.<\/p>\n<p>In the highly unlikely event STS-400 was required to launch and rescue the STS-125 crew, Endeavour\u2019s main propulsion systems would be pressurized for flight, before heading into S0007 Launch Countdown operations on Wednesday.<\/p>\n<p>SpaceX<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Spaceflight news subscription<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Space Shuttle models<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p>\u201cSTS-400 Late LON-Launch (5\/23\/09) Ops \u2013 Execution by MMT direction only: CTS (Call To Stations) for S0071, Hyper\/MPS (Main Propulsion System) Pressurization for Flight is scheduled for 0530L on Monday 5\/18,\u201d added the STS-400 processing flow.<\/p>\n<p>\u201cCTS for S0007, Launch Countdown is scheduled for 0530L on Wednesday 5\/20. S0024 Hyper QD (Quick Disconnect) de-mates will be performed in S0007 post-PRSD (Power Reactant Storage and Distributation) load.\u201d<\/p>\n<p>Following the expected STS-400 standdown, Endeavour will be prepared for her rollover to Pad 39A \u2013 ahead of her primary STS-127 mission to the ISS, currently scheduled for a June 13 launch date.<\/p>\n<p>STS-125: FD6\/EVA-3:<\/p>\n<p>Following Flight Day 5\u2019s lengthy spacewalk \u2013 which was the 8th longest EVA in history \u2013 Mission specialists John Grunsfeld (EV1) and Drew Feustel (EV2) are conducting several highly complex tasks on EVA-3.<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignleft size-full wp-image-9914\" title=\"a214\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2009\/05\/a214.jpg\" alt=\"a214\" width=\"347\" height=\"240\">First up&nbsp;was the removal of COSTAR, which includes the corrective mirrors that were required by Hubble\u2019s flawed primary mirror that was suffering from spherical aberration until the STS-61 servicing mission in 1993. COSTAR will be replaced by COS (Cosmic Origins Spectrograph)<\/p>\n<p>\u201cCOS: EV2 rides over to the \u2013V2 aft shroud door to open the doors. They both perform removal of the old COSTAR instrument and EV2 takes it over to the ORUC (Orbital Replacement Unit Carrier) for temp stow,\u201d noted the flight plan overview.<\/p>\n<p>\u201cThey retrieve COS from the ASIPE (Axial Scientific Instrument Protection Enclosure) and close the ASIPE lid.<\/p>\n<p>\u201cThey head over to the \u2013V2 aft shroud location, where EV2 (on the Remote Manipulator System) inserts COS into place. EV1 will mate the 4 connectors pins and install the harness that had been used to keep COSTAR in place.<\/p>\n<p>\u201cEV2 retrieves COSTAR from the temp stow location and rides to the ASIPE to stow it for return. EV1 closes the ASIPE lid and retrieves the STS PFR for use on the ACS task.\u201d<\/p>\n<p>UPDATE: This task has been completed successfully.<\/p>\n<p>The second big task of EVA-3 relates to the repair of the Advanced Camera for Surveys (ACS) \u2013 which suffered from an anomaly that occurred on January 27, 2007.<\/p>\n<p>The repair will see the replacement of the CCD electronics box (CEB) in the ACS\u2019s Wide Field Channel (WFC). The replacement CEB will be powered by a replacement LVPS (low-voltage power supply), completely independent of the failed unit.<\/p>\n<p>The replacement CEB will communicate with the WFC CCD \u2013 as well as with the rest of the instrument for command and data- via the edge connectors in the original CEB. The replacement LVPS draws power from the ACS primary power connectors, accessed via a splitter cable installed by the spacewalkers.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-9915\" title=\"a311\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2009\/05\/a311.jpg\" alt=\"a311\" width=\"328\" height=\"231\">\u201cACS-Part I: Both crew perform this activity pretty much together. At the \u2013V2 location, the crew removes fasteners from the ACS WFC CCD Electronics Box CEB and installs four guide studs into the fastener holes,\u201d added the flight plan walkthrough.<\/p>\n<p>\u201cThey then retrieve and install the grid cutter and ground strap from the New ORU Protective Enclosure NOPE (New ORU Protective Enclosure). Then they cut the grid and remove the grid and the cutter and restow in the NOPE.<\/p>\n<p>\u201cThey retrieve and install the ACS Fastener Capture Plate on the guide studs. This allows the crew to remove 32 fasteners and the CEB cover from the ACS so they can access the electronic cards 1 and 2, which will be removed and stowed into a card stowage module.<\/p>\n<p>As Grunfeld was removing the screws, he paid homage to an episode of The Simpsons, noting \u201cTo Scooter: This activity is dedicated to the study of tiny screws in space.\u201d<\/p>\n<p>That process essentially concluded ACS for EVA-3. \u201cThe temp CEB-R cover is installed,\u201d will follow. \u201d&nbsp;The \u2013V2 doors are closed.\u201d<\/p>\n<p>With Part I completed well ahead of the timeline, the spacewalk utilized available time to enter a second phase of ACS repairs.<\/p>\n<p>\u201cACS-Part II: If time permits in this EVA, the crew will proceed with completing ACS install. Otherwise, it will not be completed unless the STIS (Space Telescope Imaging Spectrograph) repair was unsuccessful. In that situation, ACS will be completed on EVA-5.<\/p>\n<p>\u201cHowever, if the crew is pressing on, they will now remove cards 3 and 4. Then they will retrieve the CEB replacement module and the Low Voltage Power Supply (LVPS) from the Large ORU Protective Enclosure (LOPE). The CEB module will be installed on the ACS and the new LVPS will be mounted to the ACS handhold.<\/p>\n<p>\u201cThe Power Input Element (PIE) cable (prepared as a get ahead on a previous EVA) will be mated to the LVPS. After the PIE is mated, the power output element (POE) cable to the CEB. This will conclude ACS.\u201d<\/p>\n<p>Part II was also completed well ahead of schedule, with the EVA then moving into clean-up activities, before the spacewalk was concluded after six hours and 36 minutes.<\/p>\n<p>Grusfeld praised the teams involved with making the special tools that worked so well during the EVA, while Feustel added \u201cEV2, just happy to be here!\u201d<\/p>\n<p><em><em>L2 members<\/em><\/em><em><em>:&nbsp;Documentation \u2013 from which most of the above article has quoted snippets \u2013 is available in full in the related L2 sections, now over 4000 gbs in size.<\/em><\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>While STS-125 continues to enjoy a successful Hubble servicing mission \u2013 marked by&nbsp;a hugely successful&nbsp;third spacewalk&nbsp;\u2013 Endeavour has progressed to a standby point for her STS-400 LON (Launch On Need) role, which is expected to be stood down after the Damage Assessment Team (DAT) evaluation of Late Inspection data near the end of Atlantis\u2019 mission. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[567,8290,8291],"class_list":["post-41102","post","type-post","status-publish","format-standard","hentry","category-news","tag-eva","tag-sts-125","tag-sts-400"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41102"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=41102"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41102\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=41102"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=41102"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=41102"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}