{"id":41121,"date":"2009-04-24T17:59:14","date_gmt":"2009-04-24T09:59:14","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/shuttle-managers-decide-to-advance-sts-125-launch-target-to-may-11\/"},"modified":"2009-04-24T17:59:14","modified_gmt":"2009-04-24T09:59:14","slug":"shuttle-managers-decide-to-advance-sts-125-launch-target-to-may-11","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/shuttle-managers-decide-to-advance-sts-125-launch-target-to-may-11\/","title":{"rendered":"Shuttle managers decide to advance STS-125 launch target to May 11"},"content":{"rendered":"<p>Following a meeting of the Noon Board at the Johnson Space Center (JSC), managers have decided to issue a Change Request (CR) and advance the STS-125 launch date by one day to May 11. The Agency Flight Readiness Review (FRR) will set the official launch date next Thursday.<\/p>\n<\/p>\n<p>STS-125 Flow Latest:<\/p>\n<p>Processing is proceeding to plan, with only two issues under evaluation \u2013 relating to the ET Umbilical Well Camera\/Flash system \u2013 which is currently undergoing troubleshooting \u2013 and final checks into the slight damage to the left radiator panel.<\/p>\n<p>\u201cS0600 vertical payload operations: Payload electrical and mechanical mates continue,\u201d noted Friday processing information on L2. \u201cPayload battery connections are complete and battery conditioning is in work. Currently, not tracking any payload issues.\u201d<\/p>\n<h4 class=\"widget-title penci-border-arrow\">See Also<\/h4>\n<ul>\n<li>LIVE STS-125 UPDATES<\/li>\n<li>L2 STS-125\/400 Special Section<\/li>\n<li>Click here to Join L2<\/li>\n<\/ul>\n<p>It is unlikely a repair will be required on the small area that was impacted by a torque wrench socket, though engineers are ensuring the radiator has no underlying cracks on the face sheet.<\/p>\n<p>\u201cDinged radiator panel update: Ultrasound testing found that there are de-bonds (between the face sheet and the honeycomb) in the dented areas. Inspections will continue tomorrow to see if there are any cracks in the face sheet,\u201d added Friday processing information.<\/p>\n<p>\u201cThis will probably require the tape to be removed from the area for a visual inspection. Analysis is continuing to determine what, if any, repair is necessary.\u201d<\/p>\n<p>SpaceX launch tickets<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Space Technology<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Space Shuttle models<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p>Meanwhile, Orbiter Mid-body Umbilical Unit (OMBUU) mate operations are complete, as the flow moves into closeouts.<\/p>\n<p>\u201cOrbiter aft closeouts (S1287) will begin this morning. Flight and mid-deck cable stow is planned to start today.&nbsp;Two waves of tankers are expected today for LH2 tank replenishment. Weekend Work: Flight and mid-deck cable stow continues. Payload ops.\u201d<\/p>\n<p>Launch Date Advancement:<\/p>\n<p>In order to allow for three launch opportunities prior to the range becoming unavailable, managers began assessments into advancing STS-125\u2019s launch date target by one day earlier this week \u2013 as reported by this site&nbsp;on Tuesday.<\/p>\n<p>Several studies, with a number of options, were presented to the daily Program Requirements Control Board (PRCB) meetings&nbsp;over the past couple of days.<\/p>\n<p>\u201cA launch date change for STS-125\/HST-SM4, accelerating by one day to May 11, was presented at the Noon Board on Wednesday,\u201d noted Mission Management Team (MMT) manager Mike Moses, in a series of memos acquired by L2.<\/p>\n<p>\u201cAll Shuttle elements reported \u201cGO\u201d for this option. The schedules for the HST team would remain nearly identical to the current plan. An official decision will be made at Friday\u2019s Noon Board.\u201d<\/p>\n<p>During the evaluations, options were built to allow for the HST team to support the acceleration, after they initially noted they would not be able to support the move to May 11.<\/p>\n<p>\u201cAs you all know, we talked the last two days at FRR about the possibility of moving the STS-125 launch date from 5\/12 to 5\/11. We are going to have a Daily PRCB discussion on Wednesday 4\/22 to assess the supportability of a 5\/11 launch date,\u201d added Mr Moses.<\/p>\n<p>\u201cIt\u2019s time to make it official to make sure there no other issues with an earlier date (for example, flow control valve delivery, mission timelines, cryo supportability, flight design products, flight crew schedules, etc.).<\/p>\n<p>\u201cAs stated in the SSP (Space Shuttle Program) FRR, the position of the HST team here at KSC is that an acceleration of the schedule cannot be supported. That said, we are going to go ahead and ensure that the rest of the Shuttle team could support 5\/11 if it became a feasible option.<\/p>\n<p>\u201cI do not plan to ask the HST team for a Go\/No-Go at this meeting \u2013 we will continue to assess their schedules and status throughout the week.\u201d<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignleft size-full wp-image-9650\" title=\"a220\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2009\/04\/a220.jpg\" alt=\"a220\" width=\"315\" height=\"241\">Noted as Option 2, a slight realignment to the shuttle\u2019s processing flow over the coming days out at Pad 39A&nbsp;has&nbsp;proved to be acceptable to the HST team.<\/p>\n<p>\u201cAll signs are looking good to support a 5\/11 launch date using Option 2. For those of you who weren\u2019t at the Wednesday meeting, this option allows the HST processing to follow very closely to the previous schedule and shuffles the shuttle processing around to accommodate.<\/p>\n<p>\u201cThe schedule is very near to zero margin, but it allows us to be ready to try a 5\/11 launch.\u201d<\/p>\n<p>Meeting at the Noon Board on Friday, and working via a 10 page plan that allows the Hubble team to complete electrical testing within the May 11 timeline, Mr Moses announced the Change Request (CR) to re-target for the advanced launch date.<\/p>\n<p>\u201cToday\u2019s meeting has concluded with a GO to make Option 2 the baseline and to step up to a launch date of 5\/11,\u201d wrote Mr Moses. \u201cA CR will be submitted for signature outside-of-board.<\/p>\n<p>\u201cI would like to thank the Shuttle processing team and the Hubble payload processing team for all their efforts and collaboration to make this change happen. It\u2019s really great to see the teamwork and I know this is just a precursor of the successes we\u2019ll have as a joint team in orbit.<\/p>\n<p>\u201cA great deal of good work was done by the team in wrapping up the STS-125\/HST-SM4 FRR this week. We appear to be in great shape as we approach the launch of this mission \u2013 stay focused.\u201d<\/p>\n<p><em><em>L2 members<\/em><\/em><em><em>:&nbsp;Documentation \u2013 from which the above article has quoted snippets \u2013 is available in full in the related L2 sections, now over 4000 gbs in size.<\/em><\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Following a meeting of the Noon Board at the Johnson Space Center (JSC), managers have decided to issue a Change Request (CR) and advance the STS-125 launch date by one day to May 11. The Agency Flight Readiness Review (FRR) will set the official launch date next Thursday. STS-125 Flow Latest: Processing is proceeding to [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[8290],"class_list":["post-41121","post","type-post","status-publish","format-standard","hentry","category-news","tag-sts-125"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41121"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=41121"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41121\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=41121"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=41121"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=41121"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}