{"id":41128,"date":"2009-04-19T22:09:45","date_gmt":"2009-04-19T14:09:45","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/nasa-updates-milestones-for-atlantis-sts-129-mission\/"},"modified":"2009-04-19T22:09:45","modified_gmt":"2009-04-19T14:09:45","slug":"nasa-updates-milestones-for-atlantis-sts-129-mission","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/nasa-updates-milestones-for-atlantis-sts-129-mission\/","title":{"rendered":"NASA updates milestones for Atlantis\u2019 STS-129 mission"},"content":{"rendered":"<p>With Atlantis and Endeavour now in their dual processing flows for the STS-125 mission to the Hubble Space Telescope, NASA managers have updated plans for shuttle Atlantis\u2019 next mission \u2013 STS-129 \u2013 via the Launch Site Flow Review (LSFR).<\/p>\n<p>\nHighlighting the ever-fluctuating nature of the Space Shuttle Program (SSP), STS-129 was originally scheduled to fly with Discovery; however, delays to the Hubble Space Telescope servicing mission forced NASA to realign its downstream flight manifest \u2013 resulting in an orbiter swap from Discovery to Atlantis.<\/p>\n<p>With the change of orbiters, as well as changes to the mission\u2019s middeck payload, flight planners are now projecting an Ascent Performance Margin of 1,101-lbs for STS-129 based on a November 12 launch.<\/p>\n<h4 class=\"widget-title penci-border-arrow\">See Also<\/h4>\n<ul>\n<li>LIVE Atlantis Updates<\/li>\n<li>L2 STS-129 Section<\/li>\n<li>L2 PRCB Section<\/li>\n<li>Click here to Join L2<\/li>\n<\/ul>\n<p>Furthermore, the 106 page LSFR presentation \u2013 available for download on L2 \u2013&nbsp;shows that Atlantis will not exceed any weight limits for the nominal abort modes available to her Flight Crew in the event of an emergency during launch.<\/p>\n<p>However, Atlantis\u2019 weight will exceed the Contingency Return weight limit set forth by the SSP.<\/p>\n<p>\u201cCONT RTRN exceeds 233,000-lbs Nominal End Of Mission limit,\u201d notes the LSFR presentation.<\/p>\n<p>This, however, does not appear to be of great concern to the SSP as there is no further mention of this issue in the LSFR presentation.<\/p>\n<p>Currently targeting launch No Earlier Than November 12, 2009, the STS-129 mission will see Atlantis deliver the Express Logistics Carriers 1 &amp; 2 (ELC-1 and ELC -2), along with SASA and MISSE (Materials on International Space Station Experiment) 7A and 7B, to the Space Station.<\/p>\n<p>Aerospace industry analysis<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Technology News<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Company News<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p>Additionally, the all-powerful Program Requirements Control Board (PRCB) has filed a Change Request to add RAMBO-2 (a Department of Defense payload of opportunity) to the mission. The addition of this payload is scheduled to be discussed on April 27.<\/p>\n<p>Modifications for Atlantis:<\/p>\n<p>As with every OPF (Orbiter Processing Facility) flow, Atlantis will undergo a series of configuration changes\/upgrades during her scheduled 127 day stay in the OPF.<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignleft size-full wp-image-9573\" title=\"a212\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2009\/04\/a212.jpg\" alt=\"a212\" width=\"287\" height=\"192\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2009\/04\/a212.jpg 287w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2009\/04\/a212-263x175.jpg 263w\" sizes=\"(max-width: 287px) 100vw, 287px\">The first such modification scheduled for Atlantis is the redesign of the gaseous hydrogen Flow Control Valve (FCV) elbow \u2013 a modification necessary to provide additional protection for Atlantis in the event of a FCV liberation and impact event in the gaseous hydrogen lines.<\/p>\n<p>\u201cProposed redesign of the FCV elbows involves increased wall thickness, a change in material from CRES 304L to 21-6-9 steel, and a longer elbow arm eliminating a tube section and braze joint downstream of each elbow,\u201d notes the presentation.<\/p>\n<p>The redesign will be installed in all six downstream gaseous hydrogen line locations. Further, while this safety modification will result in a marginal weight increase for Atlantis, the alteration of the FCV elbows will not require \u201cvibration testing.\u201d Rather, the modification will be certified for flight by analysis.<\/p>\n<p>More will follow in an upcoming article based on the FCV forward plan presentation, which was reviewed by last Thursday\u2019s PRCB, relating to missions STS-125 and beyond.<\/p>\n<p>Click here for NASASpaceflight.com articles&nbsp;on the FCV issue since STS-126.<\/p>\n<p>The second issue, first discovered during Atlantis\u2019 flow for the STS-115 mission back in 2006, relates to an Extended Capture Latch duct clamp and cushion installation discrepancy in avionics bays one and two.<\/p>\n<p>Because of limited access to the area in question, program engineers analyzed the situation back in 2006 and determined that the affected system would continue to function properly.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-9574\" title=\"a213\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2009\/04\/a213.jpg\" alt=\"a213\" width=\"284\" height=\"213\">As a result, the SSP accepted the condition and deferred replacement of the duct clamp and cushion until Atlantis\u2019 next Orbiter Modification Down Period (OMDP).<\/p>\n<p>Since Atlantis was originally scheduled to retire after STS-125, the duct clamp and cushion issue would not need to be dealt with as Atlantis would retire before her next OMDP.<\/p>\n<p>However, NASA managers later decided to retain Atlantis for service to the Shuttle program through 2010, thus giving Atlantis two additional flights and bringing this issue back to the table for discussion.<\/p>\n<p>Again, since access to avionics bays one and two is limited, requiring the removal of the Tactical Air and Navigation and Microwave Scanning Beam Landing System decoder for proper access, the SSP will likely accept an additional waiver for this condition, deferring modifications until \u201cthe next time access is obtained.\u201d<\/p>\n<p>Also, additional upgrades to Atlantis will include the installation of a resized orifice to middeck avionics bay 3A, the modification of wiring for the oxygen crossover valves, a change to the external airlock ducting configuration, the removal of a recorder box from the left OMS Pod, and the addition of acreage doublers to avionics bays four, five, and six.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-9576\" title=\"a53\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2009\/04\/a53.jpg\" alt=\"a53\" width=\"311\" height=\"221\">For the middeck avionics bay airflow reconfiguration, the ISS payload Mice Drawer System, which will be installed in middeck avionics bay 3A will not have sufficient airflow to \u201cto accommodate rear breathing payload in the middeck avionics bay 3A,\u201d notes the LSFR presentation.<\/p>\n<p>The intended modifications (installing a bracket in the duct to allow the installation of an upgraded orifice) will increase the airflow and provide avionics cooling support for the Mice Drawer System.<\/p>\n<p>In addition to this modification, Atlantis airlock fan will be configured to run from \u201cpost-insertion through de-orbit preparation.\u201d<\/p>\n<p>The LSFR notes that the Mission Operations Directorate has determined that Atlantis\u2019 future missions will not need to benefit from the cryo savings associated with the \u201cuse of the booster fan bypass duct.\u201d<\/p>\n<p>The new duct modification will reduce the amount of crew work associated with the fan in its current configuration; nevertheless, the option to fly the booster fan bypass duct will still be available to the STS-129 crew.<\/p>\n<p>On another front, the addition of acreage doublers to Avionics Bays four, five, and six is a preventative measure to reduce the risk of ground processing damage to the avionics bay doors.<\/p>\n<p>The LSFR presentation notes that \u201cProtective doublers over the entire acreage will prevent future damage and work stoppage during damage assessment and repair effort.\u201d\u201d<\/p>\n<p>Furthermore, work will also be conducted on Atlantis\u2019 Rudder Speed Brake (RSB) inconel thermal barrier tabs.<\/p>\n<p>The tabs, which are designed to prevent ascent heating from adversely affecting the RSB assembly and which are not necessary for reentry protection, have a history of coming lose during missions. The most notable example was seen during the STS-124 flight last June when one of these tabs dislodged during the standard Flight Control Surface and RCS hotfire tests the day before landing.<\/p>\n<p>Improved ground inspection techniques were added for the STS-126 mission in November. However, despite these efforts, seven tabs were found to be missing when Endeavour returned to KSC.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-9575\" title=\"a48\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2009\/04\/a48.jpg\" alt=\"a48\" width=\"312\" height=\"218\">For STS-129, the redesigned inconel thermal barrier tabs will improve the strength of the tab\u2019s attachment to the inside of the RSB. \u201cThe redesign effort will reduce the moment arm and stress to the spot welds and will provide a secondary mechanical attachment,\u201d notes the presentation.<\/p>\n<p>Moreover, \u201cRedesign lengthens tab to reach screw, slides tab into spring by .70\u201d (.30\u201d overhang), includes more spot welds and changes the spot weld from Class \u201cC\u201d to Class \u201cB\u201d (additional quality control to ensure weld conformance).\u201d<\/p>\n<p>Additionally, ground technicians will also be charged with conducting a mandatory structural inspection of Atlantis\u2019 Wing Leading Edge (WLE) spars.<\/p>\n<p>These inspections, which would normally be conducted during an OMDP or a prolonged OPF flow, are due for Atlantis by January 22, 2010. Since this date is before the final manifested mission of Atlantis \u2013 and since the last complete inspection was back in 2003 \u2013 Program managers developed three working options for this issue.<\/p>\n<p>The first solution was to simply extend the time between inspections, therefore negating the necessity to conduct the intrusive inspections (which requires the removal of several RCC panels) during the 129 flow.<\/p>\n<p>Nevertheless, the SSP decided that it could not accept any justification for not performing at least some of the inspection.<\/p>\n<p>To this end, Atlantis\u2019 engineers will perform WLE spar inspections of RCC panels 9-16 on each wing during the STS-129 OPF flow. The Program is expected to accept the risk of a partial inspection during a PRCB meeting April 24.<\/p>\n<p>Furthermore, one final modification for Atlantis relates to her Shuttle Remote Manipulator System (SRMS) \u2013 or robot arm.<\/p>\n<p>Due to a back-up release stall problem on STS-103 in December 1999 \u2013 and the fact that raybestos brakes\/clutches are no longer available \u2013 the shuttle fleet\u2019s SRMS End Effectors are being upgraded with ceramic material brakes.<\/p>\n<p>Endeavour\u2019s SRMS End Effector was upgraded last summer before her STS-126 flight; Discovery\u2019s SRMS End Effector is being upgraded for her STS-128 mission in August.<\/p>\n<p>Atlantis is scheduled to have her SRMS End Effector upgraded during the STS-129 flow; however, delivery of the new End Effector is currently two days behind the KSC need date. The presentation notes that the Government Flown Equipment team is working with the KSC team to refine the delivery dates at this time.<\/p>\n<p>As always, refinements to Atlantis\u2019 flow for STS-129 will be made over the coming weeks and months after the vehicle returns from the Hubble Telescope servicing mission.<\/p>\n<p><em><em>L2 members<\/em><\/em><em><em>:&nbsp;Documentation \u2013 from which the above article has quoted snippets \u2013 is available in full in the related L2 sections, now over 4000 gbs in size.<\/em><\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>With Atlantis and Endeavour now in their dual processing flows for the STS-125 mission to the Hubble Space Telescope, NASA managers have updated plans for shuttle Atlantis\u2019 next mission \u2013 STS-129 \u2013 via the Launch Site Flow Review (LSFR). Highlighting the ever-fluctuating nature of the Space Shuttle Program (SSP), STS-129 was originally scheduled to fly [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[9191,9211,9225,9199],"class_list":["post-41128","post","type-post","status-publish","format-standard","hentry","category-news","tag-fcv","tag-prcb","tag-rsb","tag-sts-129"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41128"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=41128"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41128\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=41128"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=41128"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=41128"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}