{"id":41140,"date":"2009-04-05T22:41:12","date_gmt":"2009-04-05T14:41:12","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/processing-on-track-for-sts-125-as-mission-heads-to-frr-season-and-sims\/"},"modified":"2009-04-05T22:41:12","modified_gmt":"2009-04-05T14:41:12","slug":"processing-on-track-for-sts-125-as-mission-heads-to-frr-season-and-sims","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/processing-on-track-for-sts-125-as-mission-heads-to-frr-season-and-sims\/","title":{"rendered":"Processing on track for STS-125 as mission heads to FRR season and Sims"},"content":{"rendered":"<p>No issues are being worked on Atlantis at Pad 39A, as STS-125 continues to proceed towards launch in just over a month\u2019s time. One crucial element for the May 12 launch is the replacement hardware that Atlantis will carry to the Hubble Space Telescope, with several days of mission content simulations taking place next week,&nbsp; which includes fine-tuning the procedures for the mission\u2019s EVAs.<\/p>\n<p>\nSTS-125 Flow Latest:<\/p>\n<p>Out at the Pad, Atlantis is behaving well, with Space Shuttle Main Engine (SSME) aero-surface frequency response testing performed, and blank-off plates installed in preparation of helium signature testing \u2013 which has since been completed. Preparations for hyper-load testing will begin on Wednesday.<\/p>\n<p>\u201cS0009, Launch Pad Validation, is essentially complete: Ground umbilical carrier plate (GUCP) leaks checks are complete and good,\u201d noted the latest processing information on L2.<\/p>\n<h4 class=\"widget-title penci-border-arrow\">See Also<\/h4>\n<ul>\n<li>LIVE STS-125 UPDATES<\/li>\n<li>L2 STS-125\/400 Special Section<\/li>\n<li>Click here to Join L2<\/li>\n<\/ul>\n<p>\u201cPRSD (Power Reactant Storage and Distributation) LO2\/LH2 system checkouts are complete. PRSD LO2\/LH2 system Midbody leak checks are complete. G2340 LO2\/LH2 ET auto functional\/hardware checkout is completed. Engine and aero surface FRTs are complete, He signature test and ball seal leak checks continuing.\u201d<\/p>\n<p>The successful installation and leak checks on the GUCP were expected, although attention will be placed on the hardware during tanking, following the issue with the opening launch attempt for STS-119 \u2013 when a large leak of gaseous LH2 was detected by sensors, once the seals were under cryo conditions.<\/p>\n<p>No root cause on the problem has been found, with the second launch attempt observing no leaks, allowing for a successful launch. However, confidence the issue won\u2019t repeat is high, following the installation of the \u201cbest seal\u201d into the GUCP hardware.<\/p>\n<p>\u201cAt KSC, there is an investigation going on to understand the root cause the GUCP gaseous hydrogen leak that caused a scrub for the first launch attempt of STS-119. ET (External Tank) is participating from MAF (Michoud Assembly Facility) and from MSFC (Marshall Space Flight Center),\u201d noted the only reference on a Shuttle Stand-Up\/Integration report, on L2.<\/p>\n<p>Space tourism guides<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>SpaceX<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Spaceflight news subscription<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p>\u201c(Shuttle manager) John Shannon inquired whether we sent the flight seals for the GUCP from MAF to KSC. KSC installed one, while are continuing to investigate the inspection criteria. If it has to be changed out it, can be done at the pad.<\/p>\n<p>\u201cWent ahead and put the best one they had back in. MAF had a spare that was cleaned and inspected prior to shipping out for installation. Ground Ops QD\u2019d the flight seal, and leak checks were successfully completed.\u201d<\/p>\n<p>Hubble Hardware:<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignleft size-full wp-image-9433\" title=\"a22\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2009\/04\/a22.jpg\" alt=\"a22\" width=\"279\" height=\"215\">With the replacement Science Instrument Command and Data Handler (SIC&amp;DH) now installed into the MULE that will be carried in Atlantis\u2019 Payload Bay, mission simulations will take place to work on fine tuning the EVAs that will take place on orbit.<\/p>\n<p>\u201cThere will be several simulations next week regarding EVA1 and EVA2; this will complete the simulation runs for STS-125\/HST-SM4,\u201d noted the Stand-Up report, referring to the three days of sims between the HST team, JSC teams, and others.<\/p>\n<p>Engineers will cover the first EVA (WFC3 and SICDH) on Monday\/Tuesday and then Rendezvous and Capture on Wednesday.<\/p>\n<p>The formal terminology for next week\u2019s activities is \u201cJoint Integrated Simulations,\u201d or JIS. These entail everyone involved in the mission manning their stations in a flight-like configuration, running through flight days.<\/p>\n<p>\u201cNext week is the 26 hour JIS 10 covering the wide-field camera replacement (WFPC2 out\/WFC3 in), Science Instrument Command and Data Handler (SIC&amp;DH) replacement, Latch Over Center Kits (LOCK) installation on some doors to speed later tasks, and the Soft Capture Mechanism (SCM) attachment to Hubble\u2019s base,\u201d outlined the sim info. \u201cWednesday will be the final simulation, JIS 7, covering the Rendezvous and Capture on Flight Day 3.\u201d<\/p>\n<p>STS-125 FRR Season:<\/p>\n<p>Also building up is the Flight Readiness Review (FRR) season, which was already complete to the point of the MOD and SSP (Space Shuttle Program) FRR from the first launch attempt last year, prior to the Hubble trouble on orbit. All STS-125 MOD and SSP FRR presentations from last year\u2019s attempt are available in L2 to download.<\/p>\n<p>However, all the FRRs will be repeated, in order to align to the May 12 launch attempt, along with updating vehicle status and on orbit threats \u2013 such as MMOD (Micro-Meteoroid Orbital Debris).<\/p>\n<p>First up is the L-30 Bench Review for STS-125\/HST-SM, which will take place on April 10. MOD will hold its STS-125\/HST-SM4 FRR on April 14. The USA (United Space Alliance) in-house FRR will begin at noon on April 16. The following day, another FRR will be held with the OPO (Orbiter Project Office).<\/p>\n<p>Pre-SSP FRR meetings will then take place at a department level, ahead of the all-important SSP FRR, which takes place over April 20 to 21. The Agency SOMD FRR will be conducted on April 30 \u2013 which is when the launch date will be officially set.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-9434\" title=\"a31\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2009\/04\/a31.jpg\" alt=\"a31\" width=\"147\" height=\"233\">STS-125 will be the first of a surge of three launches over four months \u2013 four if Ares I-X doesn\u2019t continue to slip, which remains likely \u2013&nbsp;coming soon after the highly successful STS-119 mission with Discovery.<\/p>\n<p>Addressing the vast shuttle teams, Mr Shannon noted that next week\u2019s IFA (In Flight Anomaly Review) of STS-119 will be a focal point for concentrating on the upcoming STS-125 mission.<\/p>\n<p>\u201cThe Team is operating at an extremely high level. We just landed STS-119\/15A \u2013 and it is already way back in the rear-view mirror,\u201d Mr Shannon noted on the latest Stand-Up report.<\/p>\n<p>\u201cBe sure that we are giving the proper attention to the Integrated IFAs, so these can be dispositioned at next week\u2019s SSP PRCB (Program Requirements Control Board) meeting.<\/p>\n<p>\u201cWe will have three flights in the next four months. This will be an extremely busy period.\u201d<\/p>\n<p><em><em>L2 members<\/em><\/em><em><em>:&nbsp;Documentation \u2013 from which the above article has quoted snippets \u2013 is available in full in the related L2 sections, now over 4000 gbs in size.<\/em><\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>No issues are being worked on Atlantis at Pad 39A, as STS-125 continues to proceed towards launch in just over a month\u2019s time. One crucial element for the May 12 launch is the replacement hardware that Atlantis will carry to the Hubble Space Telescope, with several days of mission content simulations taking place next week,&nbsp; [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[3610,9122,8290],"class_list":["post-41140","post","type-post","status-publish","format-standard","hentry","category-news","tag-frr","tag-gucp","tag-sts-125"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41140"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=41140"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41140\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=41140"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=41140"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=41140"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}