{"id":41142,"date":"2009-04-03T00:12:19","date_gmt":"2009-04-02T16:12:19","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/pre-empting-hubble-mod-reviews-sts-125-400-requirements\/"},"modified":"2009-04-03T00:12:19","modified_gmt":"2009-04-02T16:12:19","slug":"pre-empting-hubble-mod-reviews-sts-125-400-requirements","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/pre-empting-hubble-mod-reviews-sts-125-400-requirements\/","title":{"rendered":"Pre-empting Hubble: MOD reviews STS-125\/400 requirements"},"content":{"rendered":"<p>With Space Shuttle Atlantis undergoing her second round of pad processing for the much anticipated flagship mission to the Hubble Space Telescope in May, NASA managers continue to refine the complex ballet of procedures for STS-125 and its associated Launch On Need (LON) mission, STS-400 \u2013 with Endeavour on track for rollover to the VAB on April 10.<\/p>\n<p>\nSTS-125 Ascent:<\/p>\n<p>The Mission Operations Directorate (MOD) Flight Readiness Review (FRR) process is complete for this mission, with the next milestone coming via a new SSP (Space Shuttle Program) FRR later this month.<\/p>\n<p>During this review, the MOD discussed the various parameters pertaining to Atlantis\u2019 and Endeavour\u2019s ascent and entry profiles.<\/p>\n<p>For STS-125, a launch window of approximately 66 minutes will occur everyday, with the opening of each day\u2019s launch window moving about 30 minutes earlier than the previous day\u2019s window.<\/p>\n<p>\u201cLaunch Window is around 66 minutes,\u201d notes the MOD mission overview presentation, one of a group of MOD and initial SSP FRR presentations on L2. \u201cPreferred launch time is at the open of the launch window. In-Plane launch time is around 60 minutes past window open.\u201d<\/p>\n<p>Moreover, given that the Hubble Space Telescope\u2019s orbit is inclined to a different azimuth than that of the International Space Station, Atlantis\u2019 launch trajectory will preclude the use of two normally available Trans-oceanic Abort Landing (TAL) sites \u2013 Istres, France and Zaragoza, Spain.<\/p>\n<p>The MOD presentation also notes that \u201cTAL site required and Moron is the only one within cross range capability. Ten second gap (exists) between Return To Launch Site (RTLS) Negative Return and Press to ATO (Abort To Orbit) boundary. Moron is the only usable TAL site due to inclination.\u201d<\/p>\n<p>The MOD goes on to say that an emergency landing site at Bermuda will also be available in the event of a multiple failure scenario that would prevent the safe execution of an RTLS or TAL abort. A presentation of all the world-wide abort landing sites is also available on L2.<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignleft size-full wp-image-9411\" title=\"a21\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2009\/04\/a21.jpg\" alt=\"a21\" width=\"294\" height=\"220\">Also discussed by the MOD is a specific point about the External Tank, with the main point relating to the position at which the ET reenters the atmosphere and impacts the Pacific Ocean after launch.<\/p>\n<p>Aerospace industry analysis<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>NASA educational resources<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Rocket building kits<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p>For the Hubble mission, and associated STS-400 LON (Launch On Need) rescue mission, the ET impact zones are just to the south of the Hawaiian Islands \u2013 ranging anywhere from approximately 660nm south of Hawaii to 1100nm west of the Baja Peninsula or just a few miles south of Hawaii\u2019s southern cost to 1100nm from Baja.<\/p>\n<p>Furthermore, should STS-125 incur multiple delays, resulting in a night time launch, ET photography will be satisfied through the use of Atlantis\u2019 ET Umbilical Well camera and associated flash system.<\/p>\n<p>STS-400 Ascent\/Rendezvous\/Separation:<\/p>\n<p>Despite the fact that, if needed, Endeavour would be launched to the same orbital inclination as Atlantis, there are several aspects to the STS-400 ascent and rendezvous profile that differ from STS-125.<\/p>\n<p>The first difference is that of STS-400\u2019s launch window. \u201cLaunch Window duration varies and is a function of Flight Day 2 (FD-2) rendezvous phasing,\u201d notes the presentation. \u201cPreferred launch time will target the beginning of FD-2 phasing\/rendezvous capability.\u201d<\/p>\n<p>While a FD-2 rendezvous with Atlantis is the prime choice based on the STS-400 mission timeline, FD-3 rendezvous capability will be granted to the launch team at the Kennedy Space Center to increase the duration of the launch window.<\/p>\n<p>Furthering the difference between STS-125 and STS-400 is the lack of a TAL site for Endeavour\u2019s rescue mission. \u201cNo TAL site required for STS-400,\u201d notes the MOD. \u201cRTLS and Press to ATO abort boundaries overlap. TAL Support Team will release support after STS-125 launch.\u201d<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-9418\" title=\"a41\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2009\/04\/a41.jpg\" alt=\"a41\" width=\"344\" height=\"241\">Once Endeavour reaches orbit, rendezvous preparations with Atlantis will begin in earnest. Unlike all previous post-Return to Flight missions, should Endeavour actually be launched on STS-400, the four person crew will not perform the standard Thermal Protection System (TPS) inspections on FD-2.<\/p>\n<p>Instead, all TPS inspection related operations will be differed until after the STS-125 Flight Crew rescue milestones are complete.<\/p>\n<p>For rendezvous operations, Atlantis will be maneuvered to an orientation that places her Payload Bay toward Earth and her starboard side on the velocity bar (Vbar).<\/p>\n<p>Endeavour will then approach Atlantis from the Rbar (from underneath), \u201cflying at a 90 degree angle to Atlantis to minimize RCS plume impingement effects during final braking\u201d to a grapple range of approximately 44ft.<\/p>\n<p>Once Endeavour reaches this position, both Orbiters will be placed in free drift to allow Endeavour\u2019s crew to use their Shuttle Remote Manipulator System (SRMS) to \u201cgrapple Atlantis using the forward grapple fixture on Atlantis\u2019 berthed Orbiter Boom Sensor System (OBSS),\u201d added the MOD presentation.<\/p>\n<p>After Endeavour successfully grapples Atlantis, Endeavour\u2019s crew will nullify any rotational rates between the two orbiters.<\/p>\n<p>Furthermore, the MOD presentation notes that \u201cWhile in free drift, SRMS maneuvers Atlantis to nose-to-nose relative position needed for vernier attitude control. Rescue Orbiter resumes control in ALT to maneuver stack to long-term mated gravity gradient\/Torque Equilibrium Attitude (TEA).\u201d<\/p>\n<p>Then, once Atlantis\u2019 crew is safely aboard the rescue orbiter, Endeavour\u2019s crew will maneuver the two vehicles to the proper separation orientation. This orientation will see Atlantis flying belly first along the Vbar with Endeavour right \u2018behind\u2019 her.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-9414\" title=\"a6\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2009\/04\/a6.jpg\" alt=\"a6\" width=\"287\" height=\"215\">Both Orbiters will have their payload bays facing each other as Endeavour\u2019s SRMS will still be grappled to Atlantis\u2019 OBSS.<\/p>\n<p>\u201cAtlantis must release in AUTO to allow subsequent commanding by the ground to deorbit into Pacific Ocean,\u201d notes the MOD presentation. \u201cForty degree attitude and five degree per second rate deadbands in ALT to simulate free drift. Tail-only to avoid pluming Rescue Orbiter with Atlantis nose jets.\u201d<\/p>\n<p>For separation, the MOD has approved an ungrapple time of sunrise +2minutes to ensure that the ungrapple and first part of separation occur in daylight.<\/p>\n<p>Unlike the impingement concerns of Atlantis\u2019 RCS jets on Endeavour, there are no impingement concerns with Endeavour\u2019s RCS jets as Atlantis will be destructively reentered over the Pacific Ocean.<\/p>\n<p>General Ascent\/Entry Topics:<\/p>\n<p>The first issues discussed in the general Ascent\/Entry topics section of the MOD FRR relate to the Space Shuttle Main Engines (SSME). The first item discussed by the MOD relates to the capability to downlink Advanced Health Monitoring System (AHMS) data.<\/p>\n<p>\u201cSTS-125 (has) new SSME controller software [capable of downlinking] AHMS main engine controller data while on-orbit,\u201d notes the MOD presentation.<\/p>\n<p>This procedure will be performed between MECO and Mission Elapsed Time (MET) 25minutes. In addition, new flight procedures have been developed to support this operation, which involves delaying the power down of the main engine controller.<\/p>\n<h4 class=\"widget-title penci-border-arrow\">See Also<\/h4>\n<ul>\n<li>LIVE STS-125 UPDATES<\/li>\n<li>L2 STS-125\/400 Special Section<\/li>\n<li>Click here to Join L2<\/li>\n<\/ul>\n<p>In addition, the MOD also discussed two aspects of the STS-125\/400 entry profiles, the first issue being the public risk assessment for entry and landing operations.<\/p>\n<p>Here, the MOD notes that the same philosophy will be employed for Atlantis\u2019 28.5 degree inclination mission as is applied to International Space Station missions which fly at 51.6 degrees.<\/p>\n<p>Given that the STS-120 mission performed a reentry over the heartland of the United States (and that NASA was willing to have STS-119 perform a descending node reentry in the event of a late February 2009 launch), Atlantis\u2019 possible reentry over the southern United States is not expected to be an issue as long as her Thermal Protection System is given a clean bill of health.<\/p>\n<p>The EVAs:<\/p>\n<p>With five back-to-back EVAs planned for Atlantis\u2019 Flight Crew, and limited cryogenic consumables, NASA has developed a set of procedures to deal with the possibility that one of the mission\u2019s spacewalkers (EV crewmembers) may be unable to support a planned EVA.<\/p>\n<p>\u201cWith 5 \u2018back-to-back\u2019 EVAs it was important that we had an agreed upon plan\/philosophy\/guideline so we could quickly react to this scenario,\u201d notes the MOD FRR presentation.<\/p>\n<p>The MOD goes on to note that all EVAs will be performed in the order they are currently planned.<\/p>\n<p>\u201cRe-sequencing of EVAs results in a significant amount of inefficiencies. EVAs currently optimized and include planned tasks to minimize EVA duration for subsequent EVAs.\u201d<\/p>\n<p>Should an EV crewmember be unable to support a planned EVA, one of the other EV crewmembers will be substituted in his place. \u201cEV crew members cross-trained and can be substituted to support tasks,\u201d notes the MOD presentation.<\/p>\n<p>However, this plan assumes that the affected EV crewmember is able to recover in time to support subsequent EVAs. Nevertheless, should the EV crewmember not recover, the current plan is to execute the EVAs per the pre-launch timeline with some consideration given to EVA elimination or EVA task replanning based on EV crew cross-training and crew fatigue requirements.<\/p>\n<p>LiOH Canisters:<\/p>\n<p>Based on carbon dioxide levels observed on the last Hubble Servicing Mission, and recent ISS shuttle missions, a new LiOH canister change out procedure has been developed for STS-125.<\/p>\n<p>\u201cSTS-125\/HST LiOH Plan is to perform dual can change outs except Pre-sleep on FD1, FD3, FD4, FD5, FD6, FD7 and FD8 (which are single can),\u201d notes the MOD presentation. \u201cPredicted Levels assume seven hours of crew exercise a day.\u201d<\/p>\n<p>This procedure, whose need will be evaluated real-time by Mission Control, has been reviewed and approved by STS-125 Mission Commander Scott Altman who was also the commander of the last Hubble Servicing Mission: STS-109 in March 2002.<\/p>\n<p>STS-125 CSCS Support:<\/p>\n<p>In the unlikely event that Atlantis becomes disabled, NASA has developed a series of procedures to accommodate two shuttles being on orbit at the same time.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-9415\" title=\"a7\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2009\/04\/a7.jpg\" alt=\"a7\" width=\"327\" height=\"206\">Should the rescue mission be launched, the Ascent\/Entry Flight Control Team from STS-125 will move over to support the rescue mission while the STS-125 Orbit 1 and 2 Teams will undertake 13hour days through the disposal reentry.<\/p>\n<p>If this scenario is needed, the Flight Control Team would remotely command Atlantis\u2019 OMS engines for a deorbit burn that would place the vehicle on a destructive reentry profile.<\/p>\n<p>For this operation, Atlantis\u2019 destruction would be targeted for the waters to the north of the Hawaiian Islands.<\/p>\n<p>Furthermore, the MOD presentation notes the various amounts of time Atlantis\u2019 crew could wait for rescue if unfavorable damage is detected.<\/p>\n<p>If un-repairable damage is detected during the FD-2 TPS inspections, and the decision is made to conduct an immediate Group C+ power-down, Atlantis could act as a life raft for her Flight Crew for just over 24 days if needed.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-9412\" title=\"a5\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2009\/04\/a5.jpg\" alt=\"a5\" width=\"289\" height=\"212\">Similarly, should un-repairable damage be detected on FD-10 during the late inspections, and the decision is made to move immediately into Group C+ power-down, Atlantis could act as a life raft for an additional 16.5 days, with the STS-400 rescue mission arriving No Earlier Than 15 days 16 hours after the damage was detected.<\/p>\n<p>Additionally, given the lengthy delay of STS-125 from October 2008 to May 2009, the STS-400 rescue Flight Crew has been revised.<\/p>\n<p>Instead of the STS-400 mission being crewed by the Flight Deck crew of STS-123, it will now be manned by a four person subset of STS-126: Commander Chris Ferguson, Pilot Eric Boe, and Mission Specialists Steve Bowen and Shane Kimbrough.<\/p>\n<p><em><em>L2 members<\/em><\/em><em><em>:&nbsp;Documentation \u2013 from which the above article has quoted snippets \u2013 is available in full in the related L2 sections, now over 4000 gbs in size.<\/em><\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>With Space Shuttle Atlantis undergoing her second round of pad processing for the much anticipated flagship mission to the Hubble Space Telescope in May, NASA managers continue to refine the complex ballet of procedures for STS-125 and its associated Launch On Need (LON) mission, STS-400 \u2013 with Endeavour on track for rollover to the VAB [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[3610,8290,8291],"class_list":["post-41142","post","type-post","status-publish","format-standard","hentry","category-news","tag-frr","tag-sts-125","tag-sts-400"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41142"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=41142"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41142\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=41142"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=41142"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=41142"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}