{"id":41152,"date":"2009-03-23T18:25:36","date_gmt":"2009-03-23T10:25:36","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/sts-119-nasa-troubleshoots-during-problematic-final-eva\/"},"modified":"2009-03-23T18:25:36","modified_gmt":"2009-03-23T10:25:36","slug":"sts-119-nasa-troubleshoots-during-problematic-final-eva","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/sts-119-nasa-troubleshoots-during-problematic-final-eva\/","title":{"rendered":"STS-119: NASA troubleshoots during problematic final EVA"},"content":{"rendered":"<p>Spacewalkers Richard Arnold and Joseph Acaba have completed the final EVA of STS-119, tasked with several replanned elements, including troubleshooting on the Unpressurized Cargo Carrier Attach System (UCCAS), which proved to be problematic. Meanwhile, no issues of note are being worked on Discovery, although engineers are monitoring the amount of propellant Discovery has been using during the docked phase of the mission.<\/p>\n<p>&nbsp;EVA-3:<\/p>\n<p>With STS-119 reduced from four to three EVAs, due to the need to undock prior to the Soyuz cut out, EVA-2 was also replanned.<\/p>\n<p>Conducted Swanson and Acaba, EVA-2 worked on P6 Battery replacement preps, deployment of the P3 and S3 Truss Payload Attachment Systems, P1\/P3 Fluid Jumper connections\/Radiator Beam Valve Module Thermal Cover removal, and P6 Power and Data Grapple Fixture retrieval.<\/p>\n<p>However, issues were noted when attempts were made to unstow a cargo carrier attachment system (P3 NADIR UCCAS), caused by an incorrect installation of a locking pin.<\/p>\n<p>\u201cA hardware issue during EVA 2 prevented the deployment of the P3 nadir UCCAS,\u201d noted on of the MMT department presentations on L2. \u201cReal time troubleshooting was unsuccessful and the associated timeline impact caused several tasks to be dropped from EVA 2.\u201d<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignleft size-full wp-image-9275\" title=\"a219\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2009\/03\/a219.jpg\" alt=\"a219\" width=\"349\" height=\"225\">Work on the locking pin was unsuccessful, leading to photography being taken for further evaluation on the ground, while the hardware was tied down until an EVA in the future can look into solving the issue at a later date.<\/p>\n<p>EVA-3 tasks also included the relocation of a CETA (Crew and Equipment Transfer Assembly) Cart. Currently both CETA carts are on the port side of the MT (Mobile Transporter), one will be moved to the starboard side for STS-127 activities.<\/p>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p>\u201cS3 Outboard\/Zenith PAS deploy: deferred from EVA-2 due to issues with the P3 UCCAS,\u201d are among other tasks, along with the get aheads of: \u201cLEE (Latching End Effector) B Lube: Lubricate the snares or SSRMS (Space Station Remote Manipulator System) LEE B side.\u201d<\/p>\n<p>Other get-aheads include: \u201cS1\/S3 Segment-Segment Attach System BBC Panel Reconfig and the installation of the CETA Coupler.<\/p>\n<p>\u201cS1\/S3 Fluid Jumper install: same for the starboard side. P1 FHRC P-Clamp release: needed if\/when it becomes necessary to replace the P1 FHRC. S1 FHRC P-Clamp release: same for the starboard side,\u201d noted some of the other get-aheads, although not all of the items could be completed due to time available in the EVA.<\/p>\n<p>Discovery Latest:<\/p>\n<p>The Mission Management Team (MMT) met on Monday with no new issues in work with Discovery, with only a couple of new additions on the Mission Evaluation Room (MER) list over the weekend.<\/p>\n<\/p>\n<h4 class=\"widget-title penci-border-arrow\">See Also<\/h4>\n<ul>\n<li>STS-119 LIVE UPDATES<\/li>\n<li>L2 STS-119 LIVE (MMT Level)<\/li>\n<li>Click here to Join L2<\/li>\n<\/ul>\n<p>One note references an increased use of propellant by Discovery for this stage of the mission based on predictions, although that could be expected, following the use of her thrusters during the S6 Solar Array deploy, where she took control of the shuttle\/station complex\u2019s attitude in tandem with the Russian thrusters on the Station.<\/p>\n<p>In addition, Flight Day 8 saw the precautionary DAM (Debris Avoidance Manoeuvre) being conducted by Discovery\u2019s Digital Autopilot (DAP), which raised the Station away from a potential conjunction threat.<\/p>\n<p>\u201cA potential conjunction with orbital debris (Object 26264- CZ-4 Debris) was identified and required that a Debris Avoidance Manoeuvre (DAM) be performed to clear the ISS\/Shuttle stack,\u201d noted one MMT presentation.<\/p>\n<p>\u201cA retrograde delta V of ~0.9 feet per second (out of a targeted 1.0 fps) was generated by holding attitude in the undock attitude (ISS 0, 0, 0 roll, pitch, yaw) for 3 hours. The stack was then maneuvered back to the nominal Torque Equilibrium Attitude (TEA) before crew sleep.\u201d<\/p>\n<p>The other issue raised over the weekend related to a pressure anomaly on a GN2 regulator located in the midbody (midfuselage).<\/p>\n<p>\u201cAfter GN2 Repress on FD 6 the pressure downstream of the system 2 GN2 200 psig regulator gradually climbed to 267 psig over 20 hours,\u201d noted an associated presentation to the MMT. \u201cRise in pressure attributed to an in specification leakage in a closed volume.<\/p>\n<p>\u201cThe crew opened the system 2 water tank regulator to increase system volume and upon a subsequent waste water dump the pressure returned to a nominal 204 psig. The pressure has been monitored since the opening of the water tank regulator and the pressure has remained at around 204 psig.\u201d<\/p>\n<p>As of Monday\u2019s MMT, no IFAs (In Flight Anomalies) or MER level \u201cfunnies\u201d were in need of discussion, highlighting Discovery\u2019s superb performance on this mission.<\/p>\n<p><em><em>L2 members<\/em><\/em><em><em>:&nbsp;Documentation \u2013 from which the above article has quoted snippets \u2013 is available in full in the related L2 sections, now over 4000 gbs in size. STS-119 L2 Section includes same collections of all MMT presentations, images and video, now over 3,000 mb in total.<\/em><\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Spacewalkers Richard Arnold and Joseph Acaba have completed the final EVA of STS-119, tasked with several replanned elements, including troubleshooting on the Unpressurized Cargo Carrier Attach System (UCCAS), which proved to be problematic. Meanwhile, no issues of note are being worked on Discovery, although engineers are monitoring the amount of propellant Discovery has been using [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[567,233,9123],"class_list":["post-41152","post","type-post","status-publish","format-standard","hentry","category-news","tag-eva","tag-iss","tag-sts-119"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41152"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=41152"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41152\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=41152"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=41152"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=41152"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}