{"id":41156,"date":"2009-03-19T00:08:19","date_gmt":"2009-03-18T16:08:19","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/complex-robotics-complete-s6-removal-tps-cleared-from-focused-inspection\/"},"modified":"2009-03-19T00:08:19","modified_gmt":"2009-03-18T16:08:19","slug":"complex-robotics-complete-s6-removal-tps-cleared-from-focused-inspection","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/complex-robotics-complete-s6-removal-tps-cleared-from-focused-inspection\/","title":{"rendered":"Complex robotics complete S6 removal \u2013 TPS cleared from Focused Inspection"},"content":{"rendered":"<p>A complex ballet of robotics between the Shuttle and Station arms&nbsp;took place on Wednesday, as the S6 is transitioned out of Discovery\u2019s payload bay ahead of installation on Thursday. Engineers on the ground have also cleared Discovery\u2019s Thermal Protection System (TPS) from requiring a Focused Inspection.<\/p>\n<\/p>\n<p>The performance of Discovery continues to impress, with only two new issues \u2013 both very minor and with no mission impact \u2013 noted as of Wednesday morning.<\/p>\n<p>Known as \u201cFunnies\u201d \u2013 the Mission Evaluation Room (MER) list now has a total of 11 items of interest, which is extremely low, with only a slight communications issue being added to the list, along with transient dropouts on the Laser Dynamic Range Imager (LDRI) on the Orbiter Boom Sensor System (OBSS).<\/p>\n<p>On the ground, the DAT (Debris Assessment Team) worked through the hundreds of images gained from Flight Day 3\u2019s RPM (10s of mbs of photos available on L2), in order to clear Discovery from a Focused Inspection.<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignleft size-full wp-image-9205\" title=\"a61\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2009\/03\/a61.jpg\" alt=\"a61\" width=\"256\" height=\"210\">So far 138 Regions Of Interest (ROI) have been found via the inspections that have taken place on Discovery\u2019s TPS, which is slightly above average. During this stage of STS-126\u2019s mission, Endeavour had 85 ROIs listed by DAT engineers.<\/p>\n<p>No concerns were raised with any element of the heatshield, which has resulted in clearance for re-entry \u2013 via a call to remove the need for a Focused Inspection \u2013 being given during Flight Day 4.<\/p>\n<p>The MMT did take a closer look at one tile at the aft of Discovery (port elevon) which has suffered some damage, but it is not a cause for concern.<\/p>\n<p>SpaceX launch tickets<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>NASA mission updates<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Spaceflight<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p>Already cleared earlier in the day by the DAT engineers were all areas of Discovery\u2019s RCC (Reinforced Carbon Carbon) panels on both wings of the orbiter.<\/p>\n<p>\u201c138 ROI\u2019s required PRT disposition. All ascent threats cleared,\u201d noted DAT. \u201cOne region of missing coverage has been addressed. As a result of this review the LESS is GO for entry. FD2 results will serve as the baseline for late inspection.\u201d<\/p>\n<p>The performance of Discovery\u2019s External Tank during ascent will once again be highlighted as a major contributor to the healthy TPS, as the mitigation of foam liberation threats show a continuing trend of improvement.<\/p>\n<p>However, it may never be known just how clean ET-127 was after the eight and a half minute ride to orbit, due to a problem with Discovery\u2019s umbilical well camera flash, which was needed due to the dark conditions during ET sep.<\/p>\n<\/p>\n<h4 class=\"widget-title penci-border-arrow\">See Also<\/h4>\n<ul>\n<li>STS-119 LIVE UPDATES<\/li>\n<li>L2 STS-119 LIVE (MMT Level)<\/li>\n<li>Click here to Join L2<\/li>\n<\/ul>\n<p>The flash was programmed to trigger 22 times during separation. However, it is understood that it only flashed once.<\/p>\n<p>\u201cThe Camera\/Flash System did not appear to function within expected norms,\u201d noted one outline to the Mission Management Team (MMT). \u201cThe Tank Centerline Camera appears to show some flash actuations, but the Main Bus B telemetry does not indicate flash operation.<\/p>\n<p>\u201cAdditionally, the crew has been unable to establish contact between the Camera and the PGSC (Payload and General Support Computer) laptop. Subsequently, the images have not been downloaded.\u201d<\/p>\n<p>Alternative options for acquiring images of the tank post-sep are also unavailable due to the dark conditions for this particular launch.<\/p>\n<p>\u201cThe only other possible source of images of the ET is the movie camera in the umbilical well and the photographs taken by the crew from inside the crew cabin. Given that this was a night launch it is doubtful that either the movie camera or the crew photographs will yield any useful images.\u201d<\/p>\n<p>S6 Transition:<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-9198\" title=\"a46\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2009\/03\/a46.jpg\" alt=\"a46\" width=\"282\" height=\"192\">During Wednesday\u2019s robotic work, the Canadarm2 or Space Station Remote Manipulator System (SSRMS) grappled and unberthed the S6 Truss from Discovery\u2019s Payload Bay (PLB). Canadarm2 then completed a handoff of S6 Truss to the Shuttle Robotic Arm (SRMS).<\/p>\n<p>Whilst Discovery\u2019s robotic arm held S6, Canadarm2 translationed to the S6 installation worksite along the Mobile Transporter (MT), before the SRMS passed the S6 Truss back to Canadarm2.<\/p>\n<p>Due to lack of SRMS clearance with JEM Module and length of the ISS truss, robotics ops for S6 maneuvering are&nbsp;complex, as seen via the robotic movements as laid out in the Flight Readiness Review (FRR) documentation.<\/p>\n<p>\u201cSRMS uncradles and maneuvers out of the way to an S6 unberth viewing position. With SSRMS on MBS PDGF-1 (MT WS 6), SSRMS unberths S6 from Orbiter PLB. SSRMS maneuvers S6 to the handoff position,<\/p>\n<p>\u201cSRMS grapples S6. MT Translates to WS 1. SRMS maneuvers S6 to the hand-back position. SSRMS grapples S6 at the hand-back position and maneuvers to the overnight park position.\u201d<\/p>\n<p>The process of installing S6 will be focused on EVA-1 tasks on Flight Day 5, prior to the deployment of the arrays \u2013 which may take place on Flight Day 6, should managers decide against the need for a Focused Inspection on Discovery.<\/p>\n<p>The importance of smooth robotics throughout the task ahead of installation are paramount, as outlined in the FRR documentation.<\/p>\n<p>\u201cRobotic failures during maneuvers to S6 install could lead to Inability for ISS to sustain Docking Loads,\u201d noted the FRR. \u201cZero-failure tolerant during SRMS maneuver to S6-to-SSRMS handback<\/p>\n<p>\u201cSRMS is 0FT to achieving S6 handback position. SSRMS has capability to grapple S6 given any SRMS joint failure and allow the shuttle to depart. ISS unable to sustain subsequent Docking Loads unless S6 structurally mounted.<\/p>\n<p>\u201cSeveral of the cases result in inability to Press to Install due to robotic clearance issues. Minimal verification that resolution options are viable. Feasibility assessment associated with ability to either Press to Install or Safe S6 for subsequent loads (or Jettison) if RMS joint fails has gaps suggests that S6 can either Press to Install or Return to PLB.\u201d<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-9199\" title=\"a47\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2009\/03\/a47.jpg\" alt=\"a47\" width=\"189\" height=\"195\">Also a late item of interest for the robotic operations \u2013 specially with the SRMS \u2013 was noted via an early release of the Shoulder Brace that holds the Shuttle Robotic Arm in a stable configuration during launch.<\/p>\n<p>The arm is healthy and working within is required parameters. However, engineers have been working on models to ensure this remains the case, especially during high load operations, such as the S6 transition out of the Payload Bay.<\/p>\n<p>\u201cAnalytical effort undertaken to verify structural health for launch with shoulder brace out. Confirmed Installation Issue,\u201d noted a Flight Day 4 MMT presentation \u2013 which has been updated since Flight Day 2.<\/p>\n<p>\u201cSuccessful RMS Checkout, Direct Drive Test. Loads Comparison between TPS inspection and S6 Grapple\/Hand-off. 1993 structural analysis with 6.0 loads showed positive margin.\u201d<\/p>\n<p>\u201cAll hardware remained within load indicator limits. As expected the shoulder inner sleeve load indicator showed the greatest increase in load due to the brace-out condition \u2013 84 percent of its indicator load limit.\u201d<\/p>\n<p>As protection, it is understood that managers requested a slight decrease in the transition rates for the S6 operation with the SRMS. However, engineers are mainly utilizing time on issues \u2013 such as above \u2013 to refine their lessons learned to aid their understanding in the event of a more serious issue on a future flight.<\/p>\n<p><em><em>L2 members<\/em><\/em><em><em>:&nbsp;Documentation \u2013 from which the above article has quoted snippets \u2013 is available in full in the related L2 sections, now over 4000 gbs in size. STS-119 L2 Section includes same collections of all MMT presentations, images and video, now over 3,000 mb in total.<\/em><\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>A complex ballet of robotics between the Shuttle and Station arms&nbsp;took place on Wednesday, as the S6 is transitioned out of Discovery\u2019s payload bay ahead of installation on Thursday. Engineers on the ground have also cleared Discovery\u2019s Thermal Protection System (TPS) from requiring a Focused Inspection. The performance of Discovery continues to impress, with only [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[9171,9228,9229,8957,9123,7935],"class_list":["post-41156","post","type-post","status-publish","format-standard","hentry","category-news","tag-dat","tag-s6","tag-srms","tag-ssrms","tag-sts-119","tag-tps"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41156"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=41156"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41156\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=41156"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=41156"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=41156"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}