{"id":41201,"date":"2009-01-30T22:56:43","date_gmt":"2009-01-30T14:56:43","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/sts-119-fcvs-set-for-weekend-installation-surprise-visitor-for-endeavour\/"},"modified":"2009-01-30T22:56:43","modified_gmt":"2009-01-30T14:56:43","slug":"sts-119-fcvs-set-for-weekend-installation-surprise-visitor-for-endeavour","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/sts-119-fcvs-set-for-weekend-installation-surprise-visitor-for-endeavour\/","title":{"rendered":"STS-119: FCVs set for weekend installation \u2013 surprise visitor for Endeavour"},"content":{"rendered":"<p>Discovery is scheduled to receive the replacement Flow Control Valves (FCVs) over the weekend, ahead of a key flight rationale meeting at the Agency level Flight Readiness Review (FRR) next week. Meanwhile, a small bird managed to find its way into the Payload Bay of Endeavour.<\/p>\n<\/p>\n<p>STS-119 Pad Flow:<\/p>\n<p>Processing at the pad remains on schedule for the February 12 launch target, with closeouts for flight continuing on the vehicle.<\/p>\n<p>\u201cS1287 Orbiter Aft Closeout: Aft Avionics bay closeouts are complete,\u201d noted Friday processing information on L2. \u201cSSME (Space Shuttle Main Engines) walk-downs are in work today.\u201d<\/p>\n<p>Only one issue of note is being worked, relating to Orbiter Electrical engineering noting a failed HI-POT TEST at pin x of 54P111, MEC (Main Engine Controller) 1 Interface. This was classed as a constraint for call-to-stations for Final Ordnance Installation.<\/p>\n<h4 class=\"widget-title penci-border-arrow\">See Also<\/h4>\n<ul>\n<li>STS-119 LIVE UPDATES<\/li>\n<li>L2 STS-119 Section<\/li>\n<li>L2 STS-125 Section<\/li>\n<li>Click here to Join L2<\/li>\n<\/ul>\n<p>A \u201cHigh-Pot\u201d test generally involves applying a much higher than normal voltage (kilovolts) to signal wires, and measuring the resulting current that is drawn from the test equipment.<\/p>\n<p>Using a much higher voltage than normal on the signal line stresses the insulation of the wire with the intent to test its ability to prevent signal currents flowing where they should not flow.<\/p>\n<p>SpaceX launch tickets<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Rocket building kits<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>NASA educational resources<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p>The test discovered a hole in the shielding inside the connector back-shell. However, a resolution was being worked during Friday, after the connector was repaired, ahead of a retest.<\/p>\n<p>Flow Control Valves:<\/p>\n<p>With the shipment of the three replacement FCVs from fabricator Vacco to the Kennedy Space Center (KSC), engineers are waiting on the expected green light to proceed with the installation over the weekend.<\/p>\n<p>Weekend work on the shuttle out at Pad 39A is scheduled to be completely focused on the replacement of the valves, while flight rationale \u2013 based on \u201crisk acceptance\u201d \u2013 is built ahead of the Agency level FRR next week.<\/p>\n<p>\u201cHave been working very hard on FCV topic to determine failure parameters. Want to determine if flow is sensitive to orientation of sleeve or different sizes of poppets,\u201d noted the latest Shuttle Stand-up\/Integration report on L2.<\/p>\n<p>\u201cWork continues to define environment and sizes of particles that could be released from poppet, as well as size of an original crack that could result in failure due to high-cycle fatigue.<\/p>\n<p>\u201cConcerning FCV issue, rationale for flight will be based on risk acceptance. This will be presented at FRR next week.\u201d<\/p>\n<p>SRB Holddown Post Modifications:<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-medium wp-image-8645\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2009\/01\/a221-300x118.jpg\" alt=\"\" width=\"300\" height=\"118\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2009\/01\/a221-300x118.jpg 300w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2009\/01\/a221.jpg 438w\" sizes=\"(max-width: 300px) 100vw, 300px\">Modifications to the Debris Containment System (DCS) on the Solid Rocket Booster (SRB) holddown posts out at Pad 39A have been completed. The modification was called for ahead of STS-119, following a debris event during STS-126\u2019s launch.<\/p>\n<p>The STS-126 event relates to the presence of multiple pieces of debris shortly after the detonation of the NASA Standard Initiators (NSI) on the SRB hold down bolts, classed as \u201cDebris ejected from the area of the Debris Containment System (DCS) of HDPs (Holddown Posts) 1,2,5,6, and7 during NSI firing,\u201d<\/p>\n<p>The second HDP issue was classed as the most serious, relating to the DCS on HDP 3, which saw the plunger and spring extended through DCS bore hole during lift-off, resulting in the plunger and spring releasing from SRB aft skirt. The spring \u2013 a large piece of debris \u2013 was later found in the north flame trench.<\/p>\n<p>Following a large investigation, engineers deemed the debris incidents as a potential threat for impacting the vehicle during the opening couple of seconds of launch. As a result, a redesign was called for \u2013 which was successfully worked in just a matter of weeks.<\/p>\n<p>Engineers took just two days to carry out the modification as only the upper blast container assemblies that hold the plunger\/spring\/pawls\/stop-blocks was in need of replacement.<\/p>\n<p>Endeavour\u2019s Visitor:<\/p>\n<p>Over in OPF-2 (Orbiter Processing Facility), Endeavour \u2013 processing for her primary mission of STS-127 \u2013&nbsp;made a new friend in the form of a bird that managed to find its way into the Payload Bay of the orbiter.<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignleft size-medium wp-image-8646\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2009\/01\/a315.jpg\" alt=\"\" width=\"265\" height=\"195\">The visitor was spotted on closed circuit cameras, much the amusement of engineers when they first saw the report on the log entries.<\/p>\n<p>\u201cBird reported in midbody, reports it as a common bird and is described as smaller than a crow, bigger than a sparrow,\u201d noted the log, which was acquired by L2 processing information. \u201cTrying to locate a hawk to remove intruder bird. Bird possibly in the midbody and underneath the liner someplace.\u201d<\/p>\n<p>\u201cOn another front. Forward monitor has a one-time entry pass for the bird if needed,\u201d joked the following entry, before being retorted by the original reporter, \u201cI am not making this up. Bird sitting on blanket next to GSE (Ground Support Equipment) keel approx 6ft aft of ODS (Orbiter Docking System). (Can be seen on) Camera 95\u2026just staring at us \u201c<\/p>\n<p>The unbadged visitor\u2019s one time tour of Endeavour was soon put to an end, with the log ending: \u201cThe Bird has now been escorted out of the Bay.\u201d<\/p>\n<p><em><em>L2 members<\/em><\/em><em><em>: All documentation \u2013 from which the above article has quoted snippets \u2013 is available in full in the related L2 sections, now over 4000 gbs in size.<\/em><\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Discovery is scheduled to receive the replacement Flow Control Valves (FCVs) over the weekend, ahead of a key flight rationale meeting at the Agency level Flight Readiness Review (FRR) next week. Meanwhile, a small bird managed to find its way into the Payload Bay of Endeavour. STS-119 Pad Flow: Processing at the pad remains on [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[1445,9191,9123],"class_list":["post-41201","post","type-post","status-publish","format-standard","hentry","category-news","tag-endeavour","tag-fcv","tag-sts-119"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41201"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=41201"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41201\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=41201"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=41201"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=41201"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}