{"id":41205,"date":"2009-01-27T21:03:20","date_gmt":"2009-01-27T13:03:20","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/nasa-approve-funding-to-leave-obss-permanently-on-the-iss\/"},"modified":"2009-01-27T21:03:20","modified_gmt":"2009-01-27T13:03:20","slug":"nasa-approve-funding-to-leave-obss-permanently-on-the-iss","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/nasa-approve-funding-to-leave-obss-permanently-on-the-iss\/","title":{"rendered":"NASA approve funding to leave OBSS permanently on the ISS"},"content":{"rendered":"<p>NASA managers have approved funding elements to allow for a plan to leave the Orbiter Boom Sensor System (OBSS) as a permanent fixture on the International Space Station (ISS). The 50 foot robotic arm would be used as a EVA crew platform for maintenance activities by ISS crewmembers.<\/p>\n<p>\nThe plan, which would result in the final shuttle mission returning home without the OBSS, was previously suggested for STS-133 (Contingency Logistic Flight) \u2013 the final shuttle mission manifested for the shuttle program.<\/p>\n<p>However, the shuttle program is \u2018very close\u2019 to being extended by several missions, with STS-134\/AMS already added&nbsp;to the latest \u201cplanning\u201d document by the Flight Assignment Working Group (FAWG) \u2013 article to follow this week.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-medium wp-image-8614\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2009\/01\/a313.jpg\" alt=\"\" width=\"250\" height=\"199\">Regardless of when the OBSS would be left behind by a shuttle mission, its requirements for Late Inspections on that particular mission would follow the plan utilized during STS-123.<\/p>\n<p>Due to clearance issues in the Payload Bay with STS-124\u2019s Kibo Laboratory, STS-123 carried out a docked Late Inspection \u2013 which proved to be a successful technique \u2013 before berthing the OBSS on the outside of the orbital outpost (S1 Truss).<\/p>\n<p>That again would be the plan with adding the OBSS to the Station on a permanent basis, allowing its use by ISS crewmembers, which would be especially useful during Expedition EVAs.<\/p>\n<p>\u201cBoard approved the costing to enable leaving the OBSS on the S0 truss on a permanent basis,\u201d noted this week\u2019s MOD 8th Floor News memo on L2. \u201cIt provides funding to provide an EVA change out of the forward Shuttle grapple fixture with a SSRMS (Space Station Remote Manipulator System) compatible PDGF (Power Data Grapple Fixture.<\/p>\n<p>\u201cThis allows the SSRMS to grapple the OBSS at either the mid or fwd location. Also, this implementation does not preclude adding camera equipment in the future if desired.<\/p>\n<p>Rocket building kits<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>SpaceX launch tickets<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Space Shuttle models<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p>\u201cThe OBSS will be available for the ISS to use as a EVA crew platform for viewing or maintenance activities.\u201d<\/p>\n<p>A good example of the OBSS\u2019 ability to aid EVA work on the ISS was seen during Scott Parazynski\u2019s epic EVA on STS-120, when he rode a combination of the OBSS and the SSRMS to carry out repair work on the P6 4B Solar Array. Parazynski would not have been able to reach the array, had it not been for the reach provided to him by both arms.<\/p>\n<h4 class=\"widget-title penci-border-arrow\">See Also<\/h4>\n<ul>\n<li>STS-119 LIVE UPDATES<\/li>\n<li>L2 STS-119 Section<\/li>\n<li>L2&nbsp;ISS Section (100Gbs)<\/li>\n<li>Click here to Join L2<\/li>\n<\/ul>\n<p>The OBSS was added to the Shuttle Program as a Return To Flight addition of enabling a full inspection of the orbiter\u2019s TPS (Thermal Protection System) after ascent (Flight Day 2) and post undocking (Late Inspections).<\/p>\n<p>The OBSS includes an instrumentation package that consists of visual imaging equipment, this includes the Laser Dynamic Range Imager (LDRI), and Neptec\u2019s Laser Camera System (LCS). Since RTF, the OBSS has more than proved its worth, providing additional confidence in the health of the orbiters prior to re-entry.<\/p>\n<p>This was best seen during STS-118, when the OBSS was tasked with taking a closer look at a gouge on the underbelly of Endeavour.<\/p>\n<p>Thanks to unique imagery and data via the LCS \u2013 which included a 3D movie of the damage \u2013 engineers on the ground were able to clear the TPS for re-entry, a decision that proved to be fully justified by the lack of damage observed in post landing inspections.<\/p>\n<p>The cost of allowing the OBSS to be left on Station is understood to be around a $1m, which \u2013 compared to shipping it off to an exhibition \u2013 would more than pay for itself should ISS crewmembers require its use during maintenance work on the ISS.<\/p>\n<p>In other ISS robotic related news, the Dextre Special Purpose Dexterous Manipulator (SPDM) continues to be checked out ahead of its first major role on the ISS.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-medium wp-image-8613\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2009\/01\/a215.jpg\" alt=\"\" width=\"250\" height=\"143\">Dextre was grounded during troubleshooting recently, when engineers identified a potential failure mode in the SPDM Power Switching Init (PSU). However, tests have shown the robot will be able to press forward with tasks scheduled for the Autumn.<\/p>\n<p>\u201cThe SPDM continues to be checked out by the mission control team in preparation for a R&amp;R of a RPCM (Remote Power Control Module) in the fall,\u201d added the expansive 8th Floor ISS update. \u201cThe team operated the Space Station Remote Manipulator System (SSRMS) and SPDM.<\/p>\n<p>\u201cOperations included motion of the dexterous arm 2 shoulder roll joint, which had a hardware problem during STS-123 in March 2008. Engineers were able to correct this with a software update in the MSS 5.2 load which was uplinked in December.<\/p>\n<p>\u201cArm 2 motion, including the shoulder roll joint, was perfectly nominal. Operations also included SPDM dexterous arm motion in Frame of Resolution (FOR) Auto-Sequence mode, SSRMS FOR Auto-Sequence (and motion) using an SPDM FOR (at a dexterous arm tip), and SPDM dexterous arms \u201climped\u201d.\u201d<\/p>\n<p><em><em>L2 members<\/em><\/em><em><em>: All documentation \u2013 from which the above article has quoted snippets \u2013 is available in full in the related L2 sections, now over 4000 gbs in size.<\/em><\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>NASA managers have approved funding elements to allow for a plan to leave the Orbiter Boom Sensor System (OBSS) as a permanent fixture on the International Space Station (ISS). The 50 foot robotic arm would be used as a EVA crew platform for maintenance activities by ISS crewmembers. The plan, which would result in the [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[233,8715],"class_list":["post-41205","post","type-post","status-publish","format-standard","hentry","category-news","tag-iss","tag-obss"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41205"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=41205"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41205\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=41205"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=41205"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=41205"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}