{"id":41225,"date":"2008-12-28T18:29:16","date_gmt":"2008-12-28T10:29:16","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/maf-close-out-2008-with-the-phenomenal-performance-of-et-129\/"},"modified":"2008-12-28T18:29:16","modified_gmt":"2008-12-28T10:29:16","slug":"maf-close-out-2008-with-the-phenomenal-performance-of-et-129","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/maf-close-out-2008-with-the-phenomenal-performance-of-et-129\/","title":{"rendered":"MAF close out 2008 with the phenomenal performance of ET-129"},"content":{"rendered":"<p>Four missions, four clean tanks \u2013 that\u2019s what the 2008 report card notes for the Michoud Assembly Facility (MAF), with the last mission of the year \u2013 STS-126 with ET-129 \u2013 proving to be the best performing tank since Return To Flight (RTF).<\/p>\n<\/p>\n<p>Ever since the tragedy of STS-107, the main focus on shuttle safety has been concentrated on reducing foam and ice liberation from the External Tanks, primarily during first stage \u2013 and early second stage \u2013 ascent.<\/p>\n<p>2008 has marked a breakthrough year for MAF, with tank performance improving mission on mission, thanks to a variety of mitigation techniques that have been implemented at the New Orleans facility.<\/p>\n<p>Most of those engineering changes to the TPS (Thermal Protection System) foam has been centred around the removal of as much foam as possible from the tank in areas that could liberate and strike the vehicle \u2013 most notably from the Ice\/Frost Ramps that run down the side of the tanks.<\/p>\n<p>With the post ET separation photography confirming the least amount of lost TPS on post RTF record, only three minor areas of TPS loss \u2013 backed up by an extremely clean orbiter, with no notable TPS damage suffered by Endeavour \u2013 ET confidence has been added ahead of the Flight Readiness Review (FRR) season for STS-119.<\/p>\n<p>\u201cAscent: Nominal performance for all systems \u2013 no requirement violations. (3) foam debris events observed during review of imagery assets. (2) from LH2 tank acreage TPS and (1) from Intertank acreage TPS,\u201d added the post flight IFA (In Flight Anomaly) presentation on L2, with a fourth minor area of TPS cosmetic damage also noted.<\/p>\n<p>\u201cDebris size, mass, and time of release were consistent with expectations and within risk assessment mass limits. ET-129 post-flight assessment complete and shows performance consistent with expectations and within requirements.<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignleft size-medium wp-image-8357\" style=\"black 5px solid;\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2008\/12\/a221.jpg\" alt=\"\" width=\"284\" height=\"179\">\u201c(4) observations elevated as Post Flight Assessment Reports (PFARs) and assessed as IFA candidates. No new failure modes identified. No constraints or corrective actions required for STS-119\/ET-127. No IFAs recommended for STS-126\/ET-129.\u201d<\/p>\n<p>All areas of foam loss are understood, and relate to either cryopumping during ascent \u2013 a known condition, or small areas of manufacturing damage suffered due to \u201chigh traffic\u201d of engineers working in certain areas of the tank.<\/p>\n<p>Each area of interest gained expansive notes and data in the IFA presentation, before being closed as \u201cknown conditions\u201d.<\/p>\n<p>The tanks will always lose a certain amount of foam during ascent, and \u2013 as per former shuttle manager Wayne Hale\u2019s comments on one of his many ET presentations \u2013 foam loss will never be zero.<\/p>\n<p>However, with a few minor areas of additional modification due to be implemented on downstream tanks, the threat to orbiter safety has been \u2013 and will continue to be \u2013 greatly reduced, thanks to the fine efforts of the ET engineering community.<\/p>\n<p>\u201cThe tank looked phenomenal. ET-129 really performed great,\u201d wrote ET manager Mark Bryant. \u201cThree small foam losses: On Intertank acreage forward of the Liquid Oxygen feedline fairing; on Liquid Hydrogen (LH2) tank acreage just aft of the \u2018+Y\u2019 bipod; and adjacent to the Station 1528 Ice Frost Ramp on the LH2 tank \u2013 all consistent with previous flight.\u201d<\/p>\n<h4 class=\"widget-title penci-border-arrow\">See Also<\/h4>\n<ul>\n<li>Shuttle Fleet Updates<\/li>\n<li>L2 STS-126 Special (3,600mb)<\/li>\n<li>Click here to Join L2<\/li>\n<\/ul>\n<p>Bryant added that MMT (Mission Management Team) chair LeRoy Cain, said of ET-129 \u201cThis is just flat (out) amazing,\u201d when given the overview of the tank\u2019s performance.<\/p>\n<p>\u201cLeRoy asked me to give kudos to our workforce; he was that pleased with the tank\u2019s performance, (and) hence the condition of the Orbiter.\u201d<\/p>\n<p>Bryant also added that in a post-launch performance review one week after lift=off, observers noted that the ET electrical and propulsion systems performed as expected pre-launch and post-launch. The structural and Thermal Protection Systems also performed nominally post-launch.<\/p>\n<p>STS-126 was Bryant\u2019s debut launch as ET manager, which is one of the longest shifts on L-1, due to the early tanking of the ET and the obvious need to&nbsp;monitor the performance of the ECO (Engine Cut Off) sensors during that procedure.<\/p>\n<p>Despite this, Mr Bryant noted he wasn\u2019t nervous \u2013 thanks to assistance from Lockheed Martin\u2019s highly regarded ET head Wanda Sigur and Chief Engineer Jeff Pilet \u2013 as the countdown proceeded down to the T-9 minute poll.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-medium wp-image-8358\" style=\"black 5px solid;\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2008\/12\/a314.jpg\" alt=\"\" width=\"185\" height=\"165\">\u201cWanda checked in with me often, and actually I wasn\u2019t that nervous. You\u2019ve trained for this. You have great people around you doing their jobs,\u201d he added. \u201cChief Engineer Jeff Pilet was, as usual, on top of things and kept me apprised of the tank\u2019s condition and the Launch Support team. The Mission Support Room and Huntsville Operations Support Center were also on their game.<\/p>\n<p>\u201cWhen MMT Chairman LeRoy Cain conducted the roll call before coming out of the 9-minute hold, he called us first and I was able to confidently say, \u2018Lockheed Martin (ET) is GO for launch.&#8217;\u201d<\/p>\n<p>As per NASA tradition a tie cutting ceremony was performed for Bryant\u2019s first successful launch in his new position.<\/p>\n<p>Other MAF challenges during 2008 related to being able to ship the tanks to Florida in time to support the manifest. At one point, several tanks were over a month down on their required shipping dates, before MAF managers utilized the results of several Technical Interchange Meetings (TIMs), along with additional shifts for the workforce.<\/p>\n<p>Before the delay to STS-125, all the tanks were back on schedule. And while the 2008 manifest remains fluid, 2009 has been relieved of all schedule concerns thanks to the hard work of the past 12 months.<\/p>\n<p>Two tanks are currently in residence at the Kennedy Space Center (KSC) \u2013 ET-127, previously set to fly with STS-125, but now flying with Discovery on February\u2019s STS-119 mission, and ET-130 \u2013 which recently arrived to take the place as the Hubble Servicing Mission ET, should STS-125 remain on target for a May, 2009 launch.<\/p>\n<p>At MAF, five tanks are undergoing major production, which reaches into the 2010 shuttle schedule. All these tanks are either on or ahead of schedule, which is the first time a set of downstream tanks have had their shipping date pressure removed from the equation since RTF.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-medium wp-image-8360\" style=\"black 5px solid;\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2008\/12\/a42.jpg\" alt=\"\" width=\"234\" height=\"163\">\u201cET-131 (STS-127): The ET is in final assembly flow, with all operations proceeding nominally,\u201d noted the Lockheed Martin\/MAF status on ET production, on L2. \u201cWill probably work only a couple of days during holiday outage. Still checking the February 22 date for delivery of tank.<\/p>\n<p>\u201cET-132 (STS-128): The ET is in final assembly flow, with all operations proceeding nominally. Tank was laid down out of Cell A. Has been moved into Final Assembly 3; allows them to get into some dual tank flow.<\/p>\n<p>\u201cET-133 (STS-129): Will perform LOX intertank flange closeout spray (which has already begun), no work required over holiday period.<\/p>\n<p>\u201cET-135 (Currently STS-131) LOX tank was moved into Cell K. After cleaning, exterior of tank has been primed. Doing inspections on that priming now.<\/p>\n<p>\u201cET-136 (Currently STS-132): Hydrogen tank moved out for proof testing. This will take about five to seven days, and then it will move into post-proof inspections (now completed).\u201d<\/p>\n<p>In a few months time, MAF expect to know the outcome of the Shuttle Extension status, which currently&nbsp;calls for at least five additional External Tanks to be built.<\/p>\n<p>As part of the assessment, MAF managers have worked their funding requirements and floorspace plan, the latter relating to required handover of space to the Constellation program. Their results are understood to be favorable in support of an extension.<\/p>\n<p><em><em>L2 members<\/em><\/em><em><em>: All documentation \u2013 from which the above article has quoted snippets \u2013 is available in full in the related L2 sections, now over 4000 gbs in size.<\/em><\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Four missions, four clean tanks \u2013 that\u2019s what the 2008 report card notes for the Michoud Assembly Facility (MAF), with the last mission of the year \u2013 STS-126 with ET-129 \u2013 proving to be the best performing tank since Return To Flight (RTF). Ever since the tragedy of STS-107, the main focus on shuttle safety [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[9239,9157,7866,9219],"class_list":["post-41225","post","type-post","status-publish","format-standard","hentry","category-news","tag-et-129","tag-extension","tag-maf","tag-sts-126"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41225"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=41225"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41225\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=41225"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=41225"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=41225"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}