{"id":41250,"date":"2008-11-29T01:59:06","date_gmt":"2008-11-28T17:59:06","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/endeavour-undocks-from-a-healthier-iss-heads-to-late-inspections\/"},"modified":"2008-11-29T01:59:06","modified_gmt":"2008-11-28T17:59:06","slug":"endeavour-undocks-from-a-healthier-iss-heads-to-late-inspections","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/endeavour-undocks-from-a-healthier-iss-heads-to-late-inspections\/","title":{"rendered":"Endeavour undocks from a healthier ISS \u2013 heads to Late Inspections"},"content":{"rendered":"<p>Shuttle orbiter Endeavour has undocked from the International Space Station (ISS) on Flight Day 15 of STS-126. Endeavour and her crew depart the Station in a much healthier state than when they arrived, notably via the maintenance on the Solar Alpha Rotary Joints (SARJs), with early results showing the downstream multi-mission plan \u2013 which ends with SARJ XL \u2013 may not be required.<\/p>\n<\/p>\n<p>The docked phase of the mission involved four spacewalks, all of which focused on the cleaning and lubrication of the starboard SARJ \u2013 with EVA-4 carrying out the same process on the port SARJ. With the starboard SARJ being the problem, it also saw its Trundle Bearing Assemblies (TBAs) replaced.<\/p>\n<p>A two orbit Autotrack test was carried out on the starboard SARJ, following EVA-4, with initial data proving to be positive on the improvements to the rotating joint\u2019s health \u2013 via less vibration and lower currents required to drive the motors.<\/p>\n<p>\u201cPort SARJ returned to autotrack operation post-EVA. Drive current levels slightly less after lubing,\u201d noted Mission Management Team (MMT) documentation on L2.<\/p>\n<p>\u201cStarboard SARJ autotrack test performed; required significantly less current to drive: currents were 0.7 \u2013 0.9A prior to lube, currents were 0.17A average and 0.35A peak after lube.\u201d<\/p>\n<p>While the data will take up to two months to fully analysis, managers are already hopeful of the possibility that the starboard SARJ won\u2019t require renewed cleaning and lubrication on a regular basis. More so, a long term plan for the SARJ \u2013 which was mapped out during the summer \u2013 may not be required.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-medium wp-image-8081\" style=\"black 5px solid;\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2008\/11\/b23.jpg\" alt=\"\" width=\"229\" height=\"203\">That plan involved several downstream missions including SARJ \u2018clean and lube\u2019 requirements, before the long-term solution of replacing the Race Ring \u2013 a plan known as SARJ XL \u2013 was initiated.<\/p>\n<p>NASA educational resources<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Aerospace industry analysis<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Spaceflight history books<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p>SARJ XL is classed as \u201can innovative scheme to potentially take the single spare race ring and insert it between the existing spalled inboard race ring, and the other spare \u2018outboard\u2019 race ring.\u201d<\/p>\n<p>At present, engineers are pressing ahead to launch SARJ XL on one of the CLF (Contingency Logistics Flight) missions in 2010, with that mission\u2019s EVAs dedicated towards its installation.<\/p>\n<p>\u201cTrade Study: (ISS Manager) Mr. (Mike) Suffredini had asked about accelerating SARJ XL to ULF4 from ULF5 (ULF5 is the last mission in the \u201ccurrent\u201d manifest). Due to various reasons, many due to hardware availability, the SSPCB directed the SARJ XL to stay on ULF5,\u201d noted the latest news via a MOD memo, on L2, prior to the mission.<\/p>\n<p>\u201cHowever, (Mr Suffredini) did indicate that he wanted hardware delivery to stay in the same May 09 time period. If for some reason the assembly sequence slips, he wants the have other mission options (ie: hardware delivery should not slip with launch date). One option discussed is whether ULF4 (Russian MRM) may end up slipping with ULF5 taking its place in the sequence.<\/p>\n<p>\u201cSpare Race Ring Viability Inspection: Boeing looked at the ring that will be used for SARJ XL. Although there were several microscopic corrosion \u201cfeatures\u201d, the ring was described as being pristine.\u201d<\/p>\n<p>Due to the complexity of the downstream manifest scheduling \u2013 which is already being pushed to into a full 2010 of shuttle flights, even before the now-likely shuttle extension kicks in \u2013 removing the need for SARJ XL has numerous benefits, ranging from cost savings to allowing other tasks to take priority on the CLF missions.<\/p>\n<p>The best case scenario envisioned involves a requirement to \u201cclean and lube\u201d the starboard SARJ \u2013 and possibly its port counterpart as aging starts to take effect \u2013 once every year or so. Such tasks could be included during space station increments, as opposed to becoming shuttle mission EVA tasks.<\/p>\n<p>Once the data from STS-126\u2019s get-well tasks is fully analyzed, engineers will have a better understanding on both their ability to use autotrack on the starboard arrays, and the maintenance timeline. The potential deletion of SARJ XL can then be decided on.<\/p>\n<h4 class=\"widget-title penci-border-arrow\">See Also<\/h4>\n<ul>\n<li>STS-126 LIVE UPDATES<\/li>\n<li>L2 STS-126 MMT Level Coverage<\/li>\n<li>Click here to Join L2<\/li>\n<\/ul>\n<p>Meanwhile, back on Flight Day 15 of STS-126, another key event is the required Late Inspections of Endeavour\u2019s TPS (Thermal Protection System). The orbiter\u2019s heatshield has already been deemed as completely clear of any notable damage via Flight Day 2 inspections, and Flight Day 3\u2019s RPM imagery.<\/p>\n<p>While the orbiter is protected by the Station during the docked phase \u2013 thus the likelihood of any damage is very small \u2013 one final inspection is important after docking, due to the contingency of returning to the ISS, should imagery find serious damage on the orbiter.<\/p>\n<p>In such a scenario. the orbiter would be re-docked with the ISS, and her crew taking up residence on the ISS until Discovery could be launched on a rescue mission. Endeavour would undock ahead of Discovery\u2019s arrival, where she would either be commanded through either a destructive \u2013 tail first \u2013 disposal re-entry, or RCO\u2019ed through to landing.<\/p>\n<p>Such LON (Launch On Need) scenarios are very unlikely, but NASA don\u2019t take chances when it comes to the safe ability of an orbiter to re-enter since Return To Flight \u2013 since when the TPS inspections were included into shuttle missions, inclusions that involve the use of the OBSS (Orbiter Boom Sensor System).<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-medium wp-image-8082\" style=\"black 5px solid;\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2008\/11\/b31.jpg\" alt=\"\" width=\"246\" height=\"160\">The OBSS instrumentation package \u2013 which rides on the end of the 50 foot boom \u2013 consists of visual imaging equipment, the Laser Dynamic Range Imager (LDRI), and the Laser Camera System (LCS). The post-Columbia modification has sensors that can resolve at a resolution of few millimetres, and can scan at a rate of about 2.5 inches per second.<\/p>\n<p>One small issue with the \u201ctilt\u201d direction of the camera suite on the OBSS was noted early in the mission, though this will not affect the ability to gain the required scans during Flight Day 15.<\/p>\n<p>Classed as \u201cOBSS ITVC Tilt Angle Offset\u201d, the issue relates to the PTU (Pan Tilt Unit), which was noted to be offset by nine degrees in tilt and 1.5 degrees in pan. A similar issue was noted on STS-123.<\/p>\n<p>\u201cBad PTU reset \u2013 incorrect reset could be caused either by operator error, or by a cable jam\/snag,\u201d noted one of several MMT presentations (L2) on the probable causes.<\/p>\n<p>\u201c2) Cable snag on cable tie \u2013 this is the first flight for the cable tie. The tie was incorporated in order to prevent a cable to sensor blanket snag that was observed in ground testing. Remote possibility with position of cable tie<\/p>\n<p>\u201c3) Hardware malfunction -Most unlikely cause since there isn\u2019t any other reports of off-nominal PTU function.\u201d<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-medium wp-image-8083\" style=\"black 5px solid;\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2008\/11\/b4.jpg\" alt=\"\" width=\"257\" height=\"191\">The bad reset was ruled out, following a failed solution via the reset that was carried out later in the mission as part of the troubleshooting.<\/p>\n<p>\u201cPerformed Test 2 from 12:55 am to 2:13 am on Flight Day 12. Offset at -260 degrees tilt agrees with offset of ~9 degrees seen on FD2. Expect OBSS PTU behavior for Late Inspection to be similar to what was observed on Flight Day 2.\u201d<\/p>\n<p>However, with the issue known, Late Inspections can be carried out as planned, without any problems.<\/p>\n<p>\u201cRegardless of Troubleshooting: Additional Pan\/Tilt resets will not pose additional risk to the hardware,\u201d added one presentation. \u201cResets are performed numerous times on ground. Not a life cycle issue. Post Flight ground activities include an inspection and basic functional test.\u201d<\/p>\n<p><em><em>L2 members<\/em><\/em><em><em>: All documentation \u2013 from which the above article has quoted snippets \u2013 is available in full in the related L2 sections, now over 4000 gbs in size.<\/em><\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Shuttle orbiter Endeavour has undocked from the International Space Station (ISS) on Flight Day 15 of STS-126. Endeavour and her crew depart the Station in a much healthier state than when they arrived, notably via the maintenance on the Solar Alpha Rotary Joints (SARJs), with early results showing the downstream multi-mission plan \u2013 which ends [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[233,8715,9193,9219],"class_list":["post-41250","post","type-post","status-publish","format-standard","hentry","category-news","tag-iss","tag-obss","tag-sarj","tag-sts-126"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41250"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=41250"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41250\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=41250"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=41250"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=41250"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}