{"id":41283,"date":"2008-10-23T17:16:40","date_gmt":"2008-10-23T09:16:40","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/endeavour-arrives-at-pad-39a-sts-125-damage-assessment\/"},"modified":"2008-10-23T17:16:40","modified_gmt":"2008-10-23T09:16:40","slug":"endeavour-arrives-at-pad-39a-sts-125-damage-assessment","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/endeavour-arrives-at-pad-39a-sts-125-damage-assessment\/","title":{"rendered":"Endeavour arrives at Pad 39A \u2013 STS-125 damage assessment"},"content":{"rendered":"<p>Space shuttle Endeavour has been escorted on a mini tour of the Kennedy Space Center (KSC) pads this morning, after she was transported off Pad 39B for a seven hour journey to Pad 39A.<\/p>\n<\/p>\n<p>The move was set to take place on Saturday. However, poor weather is expected in the local area this weekend \u2013&nbsp;which threatened to delay Endeavour taking up residency at 39A \u2013 led to the decision to move the stack ahead of schedule.<\/p>\n<p>The STS-126 payload (MPLM) was transferred to Pad A early on Wednesday morning, with the payload canister\u2019s lowering from the Payload Checkout Room (PCR) \u2013 in order to make way for Endeavour \u2013 carried out ahead of the required schedule.<\/p>\n<p>\u201cMoisture associated with an area of disturbed weather over the Caribbean near Central America is still likely to move over FL with the threat of rain and possible severe weather late Thursday thru Saturday morning,\u201d noted processing information on L2.<\/p>\n<p>\u201cDue to pending weather, preparations are in work to move Pad B to Pad A rollaround into Thursday. Payload canister lowering is a constraint to this move (now complete).\u201d<\/p>\n<p>Endeavour departed Pad 39B at around 08:30 local time, before heading to the fork in the crawlerway that branches off between the two shuttle pads, followed by the to move forward on to Pad 39A, for arrival at around 15:00. Due to overheating bearings, her arrival took an additional hour.<\/p>\n<p>The Rotating Service Structure (RSS) will then close to the mate position between 18:00-19:00, as STS-126 prepares for the next launch preparation milestone \u2013 the Terminal Countdown Demonstration Test (TDCT), which is scheduled to take place at from October 27 to 29.<\/p>\n<p>Space Shuttle<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Space tourism guides<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>NASA mission updates<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p>Engineers will also&nbsp;check Endeavour\u2019s left OMS Pod, following a contact issue between the RSS and the orbiter during retract operations. No visible damage has been observed after the incident \u2013 which was mitigated by the immediate halting of the RSS operation when the contact was spotted.<\/p>\n<p>\u201cElephant hide (protective padded sheet) covering the side seal motor contacted the left OMS pod during RSS retract. The RSS retract was immediately halted and the RSS was taken back to the mate position to provide access,\u201d noted Thursday morning processing information.<\/p>\n<p>\u201cThe elephant hide was removed and RSS retract was then completed successfully. There was no visible damage to the left OMS pod. An engineering evaluation will be underway.\u201d<\/p>\n<p>Meanwhile, Atlantis is now safely back inside the Vehicle Assembly Building (VAB), where she will remain \u2013 pending confirmation she won\u2019t require de-stacking \u2013 for the next couple of months.<\/p>\n<p>Due to the liberation of a stainless steel support rod from Atlantis\u2019 FRCS (Forward Reaction Control System) ahead of her rollback from Pad 39A, evaluations are continuing to take place on the STS-125 stack.<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignleft size-full wp-image-7733\" style=\"black 5px solid;\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2008\/10\/a213.jpg\" alt=\"\" width=\"270\" height=\"198\">Three areas of damage have been found on External Tank (ET-127), along with a ding on an aft booster separation motor.<\/p>\n<p>\u201cPerformed a walkdown from B-roof to MLP (Mobile Launch Platform) 0 Level in VAB HB-3 with Lockheed Martin, NASA ET Mechanical, and Boeing,\u201d noted information on L2.<\/p>\n<p>\u201cTwo impacts were observed at (station) XT-1623, these locations are accessible from D Roof but would require some access since they are located about six feet out of arms reach.<\/p>\n<p>\u201cThe first one was approximately five inches in length and the second one four inches in length both with an unknown depth. One impact was observed at XT-1800, this would be a challenging area to access since it is about six feet above the thrust strut knuckle and would most likely require access being built. This impact is approximately four inches in length but appears to have a shallow depth.<\/p>\n<p>\u201cAll three areas will probably require a hands on assessment including red dye because of the nature of the damage and would be addressed per. Depending on the depth of the defects after assessment we would potentially have two options.<\/p>\n<p>\u201cIf the defect is fairly shallow it could be as simple as a sand and blend, however if it extends to deep we would most likely be in a PDL foam repair situation.<\/p>\n<p>\u201cDamage was noted at LH (Left Hand) single BSM (Booster Separation Motor) TPS (Thermal Protection System), approx 1\/4 inch ding.\u201d<\/p>\n<p><em><em>L2 members<\/em><\/em><em><em>: All documentation \u2013 from which the above article has quoted snippets \u2013 is available in full in the related L2 sections, now over 4000 gbs in size.<\/em><\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Space shuttle Endeavour has been escorted on a mini tour of the Kennedy Space Center (KSC) pads this morning, after she was transported off Pad 39B for a seven hour journey to Pad 39A. The move was set to take place on Saturday. However, poor weather is expected in the local area this weekend \u2013&nbsp;which [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[3660,1445,9236,8290,9219],"class_list":["post-41283","post","type-post","status-publish","format-standard","hentry","category-news","tag-atlantis","tag-endeavour","tag-et-127","tag-sts-125","tag-sts-126"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41283"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=41283"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41283\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=41283"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=41283"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=41283"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}