{"id":41334,"date":"2008-08-14T00:24:22","date_gmt":"2008-08-13T16:24:22","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/sts-125-atlantis-on-track-for-monday-rollover-to-vab\/"},"modified":"2008-08-14T00:24:22","modified_gmt":"2008-08-13T16:24:22","slug":"sts-125-atlantis-on-track-for-monday-rollover-to-vab","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/sts-125-atlantis-on-track-for-monday-rollover-to-vab\/","title":{"rendered":"STS-125: Atlantis on track for Monday rollover to VAB"},"content":{"rendered":"<p>Atlantis\u2019 extended stay inside OPF-1 (Orbiter Processing Facility) is coming to an end, as she prepares for the short trip to the VAB (Vehicle Assembly Building) early next week.\n<\/p>\n<p>  In parallel processing, Endeavour is also on track for her rollover in the middle of next month in support of STS-400, as the shuttle program works through the fascinating dual flow surrounding STS-125\u2019s mission to service the Hubble Space Telescope.\n<\/p>\n<p><em><img fetchpriority=\"high\" decoding=\"async\" height=\"129\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13910\" width=\"600\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/em><\/p>\n<p><em>**The most comprehensive collection&nbsp;of&nbsp;Shuttle, Ares, Orion&nbsp;and ISS&nbsp;related presentations and mission documentation, plus expansive daily processing documentation and updates&nbsp;are&nbsp;<\/em><font color=\"#0000ff\"><em>available to download&nbsp;on L2<\/em><\/font><font color=\"#0000ff\"><em>&nbsp;**<\/em><\/font><\/p>\n<p><font color=\"#ff0000\"><em><font color=\"#ff0000\"><em><img loading=\"lazy\" decoding=\"async\" height=\"182\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/index.php?action=dlattach;topic=2859.0;attach=83887;image\" width=\"240\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/em><\/font><\/em><\/font><font color=\"#0033ff\"><em>**Click&nbsp;here for sample of L2 menu and content**<\/em><\/font><font color=\"#ff0000\" size=\"3\"><\/font><font size=\"2\"><\/font><\/p>\n<p><em>**<\/em><font color=\"#ff0000\" size=\"3\"><\/font><font size=\"2\"><em>STS-125\/LON-400 L2 Sub Section Special already over 1750mb in size \u2013 special section Now Live, with over&nbsp;40 superb mission presentations. STS-125 Flight Plan (newly created) and Flight Data Files now uploaded. Mission Overview in CGI&nbsp;videos building up \u2013 starting with payload overviews.&nbsp;STS-400 Flight Plan. STS-400 EVA and mission overview Presentations (14). Daily extensive processing latest.<\/em><\/font><\/p>\n<p><font size=\"3\"><em><font size=\"2\">**L2 STS-126 in build-up \u2013 includes several mission baseline presentations. One Stop SARJ Shop (memo, presentations) etc.**<\/font><\/em><\/font><\/p>\n<p><font color=\"#0000ff\" size=\"2\"><em>**STS-124 Post Flight \u2013 STS-119 Processing Latest**<\/em><\/font><font color=\"#000000\">&nbsp;\u2014 <\/font><font size=\"2\"><em>**STS-124\/STS-119 News Articles**<\/em><\/font><\/p>\n<p><font color=\"#0000ff\" size=\"2\"><em>**LIVE updates: Endeavour&nbsp;Dual LON and STS-126 Processing**<\/em><\/font><\/p>\n<p>Space Shuttle<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Spaceflight news subscription<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Space Technology<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p><font color=\"#0000ff\" size=\"2\"><em>**LIVE updates on Atlantis&nbsp;STS-125 Processing Flow**<\/em><\/font><font color=\"#000000\">&nbsp;\u2014 <\/font><font size=\"2\"><em>**STS-125 News Articles**<\/em><\/font><\/p>\n<\/p>\n<p><u><em>Atlantis\/STS-125 Latest:<\/em><\/u><\/p>\n<p>Atlantis is being placed on the OTS (Orbiter Transporter System) during Wednesday processing, ready to be carried over to the VAB for mating operations with External Tank ET-127 and the twin Solid Rocket Boosters (SRBs).<\/p>\n<p>Work on the ET\/SRB stack has proceeded well, with a prompt resolution to the slightly out of spec washer on a bolt connecting the tank to the right booster, allowing the mating date of August 18 to remain on schedule.<\/p>\n<p>\u2018In the VAB \u2013 on the ET\/SRB closeouts, are in work with the closeout around the upper and diagonal struts,\u2019 noted Ground Operations. \u2018Also, are working the forward crossover closeout. Target for rolling orbiter over to the STS-125 stack is on August 18.\u2019<\/p>\n<p>Atlantis has been undergoing final closeout operations inside the OPF, ahead of being placed on the OTS. Processing has also included the final pressurization of her tires for flight.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" height=\"170\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/index.php?action=dlattach;topic=3993.0;attach=78737;image\" width=\"239\" align=\"left\" vspace=\"5\" border=\"0\/\"><em><font color=\"#0033ff\">**L2 Trailer Video, with examples of L2 content&nbsp;\u2013 <\/font><font color=\"#ff0000\">TRAILER NOW AVAILABLE \u2013 CLICK IMAGE**<\/font><\/em><\/p>\n<p>Alternatively <font color=\"#0000ff\">**CLICK HERE**<\/font> For the free trailer for the 1,900mb L2 video of an exclusive tour of the VAB, OPF and Pad.<\/p>\n<p>\u2018Final hatch closure was completed. The hatch had to be briefly reopened for a tile repair that was discovered when the hatch was initially closed,\u2019 noted processing information. Hatch soft cover removal and hard cover installation was completed.<\/p>\n<p>\u2018Final Tire Pressurization for Flight was completed. Orbiter Jackdown, Weight, and Center of Gravity pre-ops are complete. Orbiter OTS Transport operation pre-ops completed.\u2019<\/p>\n<p>STS-125\u2019s rollout from the VAB to Pad&nbsp;39A&nbsp;is set for August 26, scheduled for the usual time of just after midnight. The pad has been repaired, following the damage to the Flame Trench walls during STS-124\u2019s launch, although a few additional repairs will be carried out this week.<\/p>\n<p>\u2018At Pad A, completed wall repairs. Did some of the inspections; found a couple of areas at the base of the main flame deflectors that require some repair. The plan is to bring the contractor back on this week and affect those repairs. Shouldn\u2019t be any problem getting those completed this week.\u2019<\/p>\n<p><em>L2 Members: Refer to TAG keyword \u2018STS-125\u2019 for daily processing updates, baselines and presentations, etc. Plus \u2018Trench\u2019 for extensive damage and repair documentation.<\/em><\/p>\n<p><b><i><u>OMS Pod Blanket-to-Tile \u2018Step\u2019 Review:<br \/><\/u><\/i><\/b><br \/>The only outstanding issue ahead of rollover is a \u2018Loads Panel\u2019 review on a measurement spec relating to the area&nbsp;where the blankets meet the tiles on the OMS (<!--StartFragment -->Orbital Maneuvering System)&nbsp;pods \u2013 known as the \u2018step\u2019.<\/p>\n<p>\u2018The Loads Panel reviewed the OMS blanket-to-tile step measurement issue. Analysis will continue through Wednesday. Shuttle Program direction is to press forward with plans to rollover,\u2019 noted processing information.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" height=\"169\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=40245\" width=\"220\" align=\"left\" vspace=\"5\" border=\"0\/\">As seen a few times on recent missions, the blanket has a tendency to protrude away from the pod surface during&nbsp;ascent, usually with no detrimental fallout on being able to re-enter as-is.<\/p>\n<p>The one time an EVA was required was during STS-117, when Danny Olivas was transported to the aft of Atlantis to push down the blanket by hand, before securing it with staples and pins.<\/p>\n<p>A positive outcome is expected from the review data, which is likely to show there is a positive margin on the \u2018step\u2019 between the blanket and the tiles on Atlantis\u2019 OMS pods for this mission.<\/p>\n<p>\u2018Waiting for the results at Loads Panel for the environments for the OMS pod blanket. If the environments come back the same, then we are done; have already showed that we have positive margin on all the tiles,\u2019 noted JSC\u2019s Orbiter Project. <\/p>\n<p>\u2018If the environments only increase as much as they are expected to increase, it will also probably have positive margins, but we will go through the rigor and do that analysis, which should be complete by the end of the week. Hopeful that either way, it will come out positive.\u2019<\/p>\n<p>As a contingency, shuttle processing is working with NASA SE&amp;I (Systems Engineering and Integration) and the Orbiter Project on the blanket review&nbsp;to understand if there is any work to do prior to rollover.<\/p>\n<p><em>L2 Members: Refer to TAG keyword \u2018OMS\u2019 and \u2018TPS\u2019 for vast array of related OMS Pod presentations, etc.<\/em><\/p>\n<p><b><i><u>Endeavour STS-400\/126 Latest:<\/u><\/i><\/b><\/p>\n<p>Processing with Endeavour continues to keep within the timelines, which will add confidence ahead of Thursday\u2019s Program Requirements Control Board (PRCB) meeting to discuss the potential of approving a CR (Change Request) to both STS-125 and STS-126\u2019s launch dates \u2013 in order to aid Endeavour\u2019s restricted launch window in November.<\/p>\n<p>The flow inside OPF-2 has also been concentrating on the scheduled closeouts to the orbiter ahead of a mid-September rollover to the VAB for her mating with ET-129 and then-attached SRBs.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" height=\"170\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/index.php?action=dlattach;topic=4441.0;attach=92157;image\" width=\"218\" align=\"left\" vspace=\"5\" border=\"0\/\">A couple of engineering challenges are being worked through by United Space Alliance (USA)&nbsp;engineers, with weekend work to changeout GN2 poppets on an Auxiliary Power Unit now completed, along with troubleshooting on the Master Timing Unit (MTU) \u2013 which is now in a calibration test period.<\/p>\n<p>The replacement of the Inertial Measurement Unit (IMU 1) is also taking place, with the installation of a replacement unit set to take place on Wednesday \u2013 followed by calibration checks on Thursday.<\/p>\n<p>\u2018Over the weekend, completed the change out of the GN2 APU poppets. Continuing to work ET doors step and gap. Plan is to do ET door functional this Wednesday,\u2019 noted Ground Operations. \u2018In the midbody, are working bay closeouts. Will close PLBDs (Payload Bay Doors).<\/p>\n<p>\u2018IMU 1 Platform Fail, update: De-mate was completed Monday. Removal of the unit took place Tuesday. Installation of the new unit is scheduled for Wednesday. IMU Calibration is now scheduled for Thursday.\u2019<\/p>\n<p>\u2018On STS-126, will be doing the orbiter SSME gimbal clearance test mid-week,\u2019 added Pratt &amp; Whitney Rocketdyne\/KSC on the status of Endeavour\u2019s Space Shuttle Main Engines (SSMEs). \u2018When do that, will have the SSME controllers powered up to look at all the data and check harness integrity.\u2019<\/p>\n<p>Endeavour\u2019s tank (ET-129) is now in High Bay 2\u2019s Checkout Cell inside the VAB, undergoing final checks ahead of being lifted over for mating with the SRBs at the end of the month.<\/p>\n<p>An ET\/SRB&nbsp;mating review will take place on August 22, although one item of interest has already been noted by engineers working with the tank \u2013 which is now the subject of an engineering review.<\/p>\n<p>\u2018Looking ahead, are preliminarily targeting the STS-126 ET\/SRB Mate Review for August 22. Will put the letter out in the next day or two. Scheduling August 29 for the Orbiter Rollout Mate Review for STS-126.<\/p>\n<p>\u2018ET-129 arrived safely at the KSC dock and was transported to the VAB Transfer Aisle. Lift in to High Bay-2 East checkout cell was complete at 02:39 EDT.<\/p>\n<p>\u2018As the tank was lifted to vertical, technicians reported hearing a metallic sound coming from the inside of the tank. (Notes) were taken to document this issue. Engineering evaluation is in work.\u2019<\/p>\n<p><em>L2 Members: Refer to TAG keywords \u2018STS-400\u2019 and&nbsp;\u2018STS-126\u2019 for daily processing updates, baselines and presentations, etc.<\/em><\/p>\n<p><font color=\"#0000ff\"><em>L2 members<\/em><\/font><em>: All documentation&nbsp;\u2013 from which the above article has quoted snippets \u2013 is available in full in the related L2 sections, updated live.<\/em><\/p>\n<p><em>**BRAND NEW STS-124 MISSION OVERVIEW MUSIC VIDEO \u2013 AVAILABLE HERE** (Free Video Section \u2013 Only requires to be logged into the forum)<br \/><\/em><br \/><em>Click here for a range of superb&nbsp;STS mission specific music videos created by Max Q videos<\/em><em>&nbsp;<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Atlantis\u2019 extended stay inside OPF-1 (Orbiter Processing Facility) is coming to an end, as she prepares for the short trip to the VAB (Vehicle Assembly Building) early next week. In parallel processing, Endeavour is also on track for her rollover in the middle of next month in support of STS-400, as the shuttle program works [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-41334","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41334"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=41334"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41334\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=41334"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=41334"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=41334"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}