{"id":41338,"date":"2008-08-06T19:17:54","date_gmt":"2008-08-06T11:17:54","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/maf-complete-et-129-ahead-of-schedule-sarj-xls-10-eva-plan\/"},"modified":"2008-08-06T19:17:54","modified_gmt":"2008-08-06T11:17:54","slug":"maf-complete-et-129-ahead-of-schedule-sarj-xls-10-eva-plan","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/maf-complete-et-129-ahead-of-schedule-sarj-xls-10-eva-plan\/","title":{"rendered":"MAF complete ET-129 ahead of schedule \u2013 SARJ XL\u2019s 10 EVA plan"},"content":{"rendered":"<p>Less than a month after ET-127 left the Michoud Assembly Facility (MAF) for STS-125, an around-the-clock effort has managed to accelerate the completion of ET-129 \u2013 which will ship today for Endeavour\u2019s STS-400 and STS-126.\n<\/p>\n<p>  Meanwhile, the huge effort into finding a solution for the troublesome starboard SARJ (Solar Alpha Rotary Joint) on the International Space Station (ISS) now centers around a potential 10 EVA plan called SARJ XL.\n<\/p>\n<p><em><img fetchpriority=\"high\" decoding=\"async\" height=\"129\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13910\" width=\"600\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/em><\/p>\n<p><em>**The most comprehensive collection&nbsp;of&nbsp;Shuttle, Ares, Orion&nbsp;and ISS&nbsp;related presentations and mission documentation, plus expansive daily processing documentation and updates&nbsp;are&nbsp;<\/em><font color=\"#0000ff\"><em>available to download&nbsp;on L2<\/em><\/font><font color=\"#0000ff\"><em>&nbsp;**<\/em><\/font><\/p>\n<p><font color=\"#ff0000\"><em><font color=\"#ff0000\"><em><img loading=\"lazy\" decoding=\"async\" height=\"182\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/index.php?action=dlattach;topic=2859.0;attach=83887;image\" width=\"240\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/em><\/font><\/em><\/font><font color=\"#0033ff\"><em>**Click&nbsp;here for sample of L2 menu and content**<\/em><\/font><font color=\"#ff0000\" size=\"3\"><\/font><font size=\"2\"><\/font><\/p>\n<p><em>**<\/em><font color=\"#ff0000\" size=\"3\"><\/font><font size=\"2\"><em>STS-125\/LON-400 L2 Sub Section Special already over 1750mb in size \u2013 special section Now Live, with over&nbsp;40 superb mission presentations. STS-125 Flight Plan (newly created) and Flight Data Files now uploaded. Mission Overview in CGI&nbsp;videos building up \u2013 starting with payload overviews.&nbsp;STS-400 Flight Plan. STS-400 EVA and mission overview Presentations (14). Daily extensive processing latest. <br \/>(Large documentation surge this week \u2013 articles will follow).<\/em><\/font><\/p>\n<p><font size=\"3\"><em><font size=\"2\">**L2 STS-126 in build-up \u2013 includes three mission baseline presentations. One Stop SARJ Shop (memo, presentations) etc.**<\/font><\/em><\/font><\/p>\n<p><font color=\"#0000ff\" size=\"2\"><em>**STS-124 Post Flight \u2013 STS-119 Processing Latest**<\/em><\/font><font color=\"#000000\">&nbsp;\u2014 <\/font><font size=\"2\"><em>**STS-124 News Articles**<\/em><\/font><\/p>\n<p><font color=\"#0000ff\" size=\"2\"><em>**LIVE updates: Endeavour&nbsp;Dual LON and STS-126 Processing**<\/em><\/font><\/p>\n<p>Space tourism guides<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Spaceflight news subscription<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Spaceflight<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p><font color=\"#0000ff\" size=\"2\"><em>**LIVE updates on Atlantis&nbsp;STS-125 Processing Flow**<\/em><\/font><font color=\"#000000\">&nbsp;\u2014 <\/font><font size=\"2\"><em>**STS-125 News Articles**<\/em><\/font><\/p>\n<\/p>\n<p><em><u><br \/>ET-129&nbsp;\u2013 Latest:<\/u><\/em><\/p>\n<p>The early shipping of ET-129 will hand shuttle managers additional ammunition for their wish to accelerate the launch date for STS-125 (to October 5) in order to aid the opportunity for STS-126 to move up a few days in its November launch window. <\/p>\n<p>Only a matter of a week ago, MAF processing reports pointed to ET-129\u2019s shipping date as around&nbsp;August 12, which was brought down to August 8 at the end of last week. However, another huge three-shift weekend effort has successfully advanced the completion date to August 5 \u2013 for shipping on Wednesday.<\/p>\n<p>\u2018Pegasus Barge is moored up at MAF awaiting the tank. MAF work on ET-129 is expected to be completed today and loaded on the barge tomorrow,\u2019 noted MAF\/Lockheed Martin processing information. \u2018Estimated arrival at the KSC VAB Turn basin is 8\/12.\u2019 <\/p>\n<p>Previously, shuttle managers had noted that the tank had to be completed by August 2 in order to allow the August 14 Program Requirements Control Board (PRCB) meeting to approve&nbsp;the original&nbsp;CR (Change Request) that would advance the launch date for STS-125 to October 2. <\/p>\n<p>This CR was then modified to an October 5 NET (No Earlier Than) for STS-125, which would place ET-129\u2019s now confirmed completion date right on the required timeline. Other factors are also in play, such as the STS-125 hardware delivery to the pad, and \u2018crew loading\u2019 timelines.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" height=\"170\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/index.php?action=dlattach;topic=3993.0;attach=78737;image\" width=\"239\" align=\"left\" vspace=\"5\" border=\"0\/\"><em><font color=\"#0033ff\">**New L2 Trailer Video, with examples of L2 content&nbsp;\u2013 <\/font><font color=\"#ff0000\">TRAILER NOW AVAILABLE \u2013 CLICK IMAGE**<\/font><\/em><\/p>\n<p>Alternatively <font color=\"#0000ff\">**CLICK HERE**<\/font> For the free trailer for the 1,900mb L2 video of an exclusive tour of the VAB, OPF and Pad. <\/p>\n<p>Should all go to plan, STS-126 would move up to November 7, which would gain three days in a window that is restricted by a beta angle cut-out that kicks in on November 25. <\/p>\n<p>\u2018Reason for change: Increase launch opportunities for STS-126 before the Launch Beta angle cut-out in November\/December,\u2019 noted the associated presentations on L2. \u2018The 10\/05 date allows adequate time for HST payload processing prior to installation.\u2019<\/p>\n<p><em>L2 Members: Refer to TAG keywords \u2018STS-125\u2019, \u2018STS-126\u2019, \u2018STS-400\u2019 and \u2018ET-129\u2019 for related sections.<br \/><\/em><\/p>\n<p><b><i><u>YERO:<\/u><\/i><\/b><\/p>\n<p>With November 25 being the last opportunity for a launch until early 2009, the work-around solution to the problem noted as YERO (Year End Rollover) \u2013 which requires a modification to flight software on the orbiters and new ground procedures \u2013 has also been stood down. <\/p>\n<p>The YERO problem relates to the shuttle orbiter\u2019s computers needing to reset through a change of year, which could cause a glitch on orbit. The problem that was first highlighted when Discovery\u2019s STS-116 launch window was restricted to launching before the mission could overlap the change of year.<\/p>\n<p>While a contingency was already in place \u2013 involving the orbiter remaining docked to the International Space Station (ISS) during a YERO event \u2013 a final solution was requested by then-shuttle manager Wayne Hale, and subsequently solved by MOD (Mission Operations Directorate) engineers and controllers.<\/p>\n<p>\u2018The YERO team received good news last week. The Shuttle Program does not require the capability to fly STS-126 over the end of the year so MOD can stand down on the additional work planned,\u2019 noted an August 4 memo. <\/p>\n<p>\u2018The only YERO scenario that would be under consideration would be for a rescue mission but we can defer that work until call up if it occurs. Thanks to (the team) for their continued excellent leadership of this topic and to the YERO team for all their hard work.<\/p>\n<p>\u2018The YERO team will determine what work should be closed out and what should be put on the shelf for next year if required.\u2019<\/p>\n<p><em>L2 Members: Refer to TAG&nbsp;keyword \u2018YERO\u2019 for the related presentations and memos.<\/em><\/p>\n<p><b><i><u>SARJ XL:<\/u><\/i><\/b><\/p>\n<p>Also noted this week has been the advancement in plans to solve the SARJ issue on the Station \u2013 centering around an ambitious plan to replace the race ring on the starboard hardware that rotates outboard solar arrays to track the sun.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" height=\"203\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/index.php?action=dlattach;topic=4426.0;attach=93047;image\" width=\"229\" align=\"left\" vspace=\"5\" border=\"0\/\">The effort, which may involve around 10 EVAs in total \u2013 several before, during, and after a shuttle mission \u2013 calls for the installation of structural supports between the two segments of the SARJ\/Truss&nbsp;\u2013 allowing for the hardware to be jacked apart to make room for the new race ring that would then be clamped into place. This plan is called SARJ XL.<\/p>\n<p>\u2018As you know, we have a very serious problem with the rolling surface of the stbd Solar Array Rotary Joint (SARJ) inboard race ring,\u2019 noted information on an August 4 memo on L2.<\/p>\n<p>\u2018As the teams continue to evaluate possible root cause for the spalled surface, an integrated team of engineers, MOD folks, and other have come up with an innovative scheme to potentially take the single spare race ring and insert it between the existing spalled inboard race ring, and the other spare \u2018outboard\u2019 race ring.<\/p>\n<p>\u2018This would allow all of the electronics (data and power) that feed the sensors and drive\/lock mechanisms to continue to be provided inboard of the rotating plane which preserves critical redundant features of the design. Additionally, this re-established the full race ring redundancy on the stbd side. <\/p>\n<p>\u2018The engineers who came up with the idea called it XL for \u2018extra large\u2019 \u2013 one possible method for inserting this ring in the truss area after jacking out the truss segment holding the solar arrays. This is only a possible option and may not be the one selected.\u2019<\/p>\n<p>Challenges remain with this plan, notably with extending the umbilical connections \u2013 with additional&nbsp;work required on the plan before the program approves the option. <\/p>\n<p>\u2018This effort is a high priority for the ISS Program and you will likely be hearing quite a bit about it in the near future. The Program approved creating an official CR for this effort moving it from the conceptual to the implementation phase.\u2019<\/p>\n<p><em>L2 Members: Refer to TAG keyword \u2018SARJ\u2019 for SARJ plans, diagrams and presentations.<\/em><\/p>\n<p><b><i><u>SPDM Dextre Latest:<\/u><\/i><\/b><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" height=\"172\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=43854\" width=\"271\" align=\"left\" vspace=\"5\" border=\"0\/\">Also on the ISS, the Canadian Special Purpose Dexterous Manipulator (SPDM \u2013 otherwise known as Dextre) is undergoing final testing before being operational for its tasks on the orbital outpost.<\/p>\n<p>Dextre is capable of robotic execution of ISS external maintenance tasks, such as the removal and replacement of dexterous compatible Orbit Replaceable Units (ORUs), and the servicing of scientific payloads. <\/p>\n<p>Loosely designed the human form \u2013 with a torso, a head area with cameras and several arm appendages \u2013 it rides on the end of the SSRMS (Space Station Remote Manipulator System) as a special dexterous tool.<\/p>\n<p>Supporting EVA-based maintenance is also part of its role, with the preposition of ORUs or Integrated Assemblies, the provision of lighting and camera support, and is it is also capable of actuating external mechanisms, performing inspection tasks, and extending reach of SSRMS.<\/p>\n<p>\u2018SPDM: The flight team is working hard to check it out and ensure that its systems are working properly,\u2019 noted information this week. <\/p>\n<p>\u2018Once the tests are complete, and appropriate software updates are provided later this year, the teams are working towards the first official use of the SPDM to change out a RPCM (Remote Power Control Module) power switch module. <\/p>\n<p>\u2018The checkouts over the last week have been going well, so we are well on our way to using this wonderful new capability.\u2019<\/p>\n<p><em>L2 Members: Refer to TAG keyword \u2018Dextre\u2019 for updates, diagrams and presentations.<br \/><\/em><br \/><font color=\"#0000ff\"><em>L2 members<\/em><\/font><em>: All documentation&nbsp;\u2013 from which the above article has quoted snippets \u2013 is available in full in the related L2 sections, updated live.<\/em><\/p>\n<p><em>**BRAND NEW STS-124 MISSION OVERVIEW MUSIC VIDEO \u2013 AVAILABLE HERE** (Free Video Section \u2013 Only requires to be logged into the forum)<br \/><\/em><br \/><em>Click here for a range of superb&nbsp;STS mission specific music videos created by Max Q videos<\/em><em>&nbsp;<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Less than a month after ET-127 left the Michoud Assembly Facility (MAF) for STS-125, an around-the-clock effort has managed to accelerate the completion of ET-129 \u2013 which will ship today for Endeavour\u2019s STS-400 and STS-126. Meanwhile, the huge effort into finding a solution for the troublesome starboard SARJ (Solar Alpha Rotary Joint) on the International [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-41338","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41338"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=41338"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41338\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=41338"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=41338"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=41338"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}