{"id":41349,"date":"2008-07-17T01:18:43","date_gmt":"2008-07-16T17:18:43","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/nasa-managers-request-change-to-sts-125-sts-126-launch-dates\/"},"modified":"2008-07-17T01:18:43","modified_gmt":"2008-07-16T17:18:43","slug":"nasa-managers-request-change-to-sts-125-sts-126-launch-dates","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/nasa-managers-request-change-to-sts-125-sts-126-launch-dates\/","title":{"rendered":"NASA managers request change to STS-125, STS-126 launch dates"},"content":{"rendered":"<p>A CR (Change Request) has been issued to attempt to push forward the launch dates of STS-125 and STS-126. If approved, Atlantis\u2019 trip to Hubble will take place NET (No Earlier Than) October 2, allowing Endeavour\u2019s mission to the ISS to move up to November 4.\n<\/p>\n<p>  Meanwhile, Atlantis\u2019 External Tank (ET-127) is now being processed in the checkout cell inside the Vehicle Assembly Building (VAB), following its barge journey from New Orleans.\n<\/p>\n<p><em><img fetchpriority=\"high\" decoding=\"async\" height=\"129\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13910\" width=\"600\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/em><\/p>\n<p><em>**The most comprehensive collection&nbsp;of&nbsp;Shuttle, Ares, Orion&nbsp;and ISS&nbsp;related presentations and mission documentation, plus expansive daily processing documentation and updates&nbsp;are&nbsp;<\/em><font color=\"#0000ff\"><em>available to download&nbsp;on L2<\/em><\/font><font color=\"#0000ff\"><em>&nbsp;**<\/em><\/font><\/p>\n<p><font color=\"#ff0000\"><em><img loading=\"lazy\" decoding=\"async\" height=\"179\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/index.php?action=dlattach;topic=1415.0;attach=68183;image\" width=\"244\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/em><\/font><font color=\"#0033ff\"><em>**Click&nbsp;here for sample of L2 menu and content**<\/em><\/font><font color=\"#ff0000\" size=\"3\"><\/font><font size=\"2\"><\/font><\/p>\n<p><em>**<\/em><font color=\"#ff0000\" size=\"3\"><\/font><font size=\"2\"><em>STS-124 L2&nbsp;Sub Section (over 3400mb) \u2013 Continuing through post flight and post mission IFA\/Mission reviews. 13 Post Flight IFA Review Presentations now available.<\/em><\/font><\/p>\n<p>**STS-125\/LON-400 L2 Sub Section Special already over 1750mb in size \u2013 special section Now Live, with over&nbsp;40 superb mission presentations. STS-125 Flight Plan (newly created) and Flight Data Files now uploaded. Mission Overview in CGI&nbsp;videos building up \u2013 starting with payload overviews.&nbsp;STS-400 Flight Plan. STS-400 EVA and mission overview Presentations (14). Daily extensive processing latest.<font size=\"3\"><\/font><\/p>\n<p><font color=\"#0000ff\" size=\"2\"><em>**STS-124 Post Flight \u2013 STS-119 Processing Latest**<\/em><\/font><font color=\"#000000\">&nbsp;\u2014 <\/font><font size=\"2\"><em>**STS-124 News Articles**<\/em><\/font><\/p>\n<p><font color=\"#0000ff\" size=\"2\"><em>**LIVE updates: Endeavour&nbsp;Dual LON and STS-126 Processing**<\/em><\/font><\/p>\n<p>Space Technology<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>SpaceX<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Space Shuttle models<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p><font color=\"#0000ff\" size=\"2\"><em>**LIVE updates on Atlantis&nbsp;STS-125 Processing Flow**<\/em><\/font><font color=\"#000000\">&nbsp;\u2014 <\/font><font size=\"2\"><em>**STS-125 News Articles**<\/em><\/font><\/p>\n<\/p>\n<p><em><u><br \/>Launch Date Change Request: (SEE LATEST ARTICLE ON NEW MODIFICATION TO CR)<\/u><\/em><\/p>\n<\/p>\n<\/p>\n<p>The launch date advancement, as previously reported by this site, looked to be off the cards just a week ago, when the ET delivery dates failed to add margin in the required timelines set out in a memo that initially broached the idea of moving the dates up. <\/p>\n<p><img loading=\"lazy\" decoding=\"async\" height=\"333\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/index.php?action=dlattach;topic=1508.0;attach=84134;image\" width=\"146\" align=\"left\" vspace=\"5\" border=\"0\/\">The move, which is specific to handing margin to Endeavour\u2019s STS-126 launch window \u2013 due to a Beta Angle&nbsp;Cutout that kicks in after November 25 \u2013 was initially set to be discussed at a Program Requirements Control Board (PRCB) meeting last week. <\/p>\n<p>While the main PRCB meeting last Thursday was cancelled (due to lack of issues being worked with the fleet), it is not known if the decision was subsequently deferred, or approved in principle, with the CR document calling for a new decision date in August. <\/p>\n<p>Titled \u2018Update Launch Dates for STS-125 and STS-126\u2019, Change Request documents are just that, requests for a change \u2013 to be discussed, approved, denied or modified as per feedback from all elements involved with the shuttle. <\/p>\n<p>\u2018Increase launch opportunities for STS-126 before the Launch Beta angle cutout in November\/December,\u2019 was given as the specific reason for the CR.<\/p>\n<p>The request calls for a change to the launch dates of STS-125 \u2013 advancing to October 2, STS-400 (Launch On Need) \u2013 advancing in sync to October 9 (if required), and STS-126 \u2013 advancing to November 4. UPDATE: Modification to STS-125 aims for October 5.&nbsp;<\/p>\n<p>However, to approve the changes, several factors will come into play via the&nbsp;current timelines, notably the next two tanks (ET-129 and ET-130), and Atlantis\u2019 payload, which is currently only just on the timeline to make the original \u2013 and current \u2013 launch date of October 8. <\/p>\n<p>To allow for the launch date to advance from a payload standpoint, the Hubble servicing equipment needs to arrive at the Kennedy Space Center (KSC), from the Goddard Space Center, in time for September 11 \u2013 which is believed to reference the deadline for getting the payload to the pad.<\/p>\n<p>Also required is ET-129 \u2013 which will be mated with Endeavour\u2019s stack for the primary mission of STS-126, but in relation to Atlantis\u2019 mission, it\u2019ll be part of STS-400 \u2013 which will rollout to Pad 39B as the rescue shuttle. ET-129 currently&nbsp;has to be shipped no later than August 2. <\/p>\n<p><img loading=\"lazy\" decoding=\"async\" height=\"170\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/index.php?action=dlattach;topic=3993.0;attach=78737;image\" width=\"239\" align=\"left\" vspace=\"5\" border=\"0\/\"><em><font color=\"#0033ff\">**New L2 Trailer Video, with examples of L2 content&nbsp;\u2013 <\/font><font color=\"#ff0000\">TRAILER NOW AVAILABLE \u2013 CLICK IMAGE**<\/font><\/em><\/p>\n<p>Alternatively <font color=\"#0000ff\">**CLICK HERE**<\/font> For the free trailer for the 1,900mb L2 video of an exclusive tour of the VAB, OPF and Pad.<\/p>\n<p>Another Michoud Assembly Facility (MAF) related element is the requirement for Endeavour\u2019s STS-126 mission to have LON support. This relates to ET-130 \u2013 currently over a month behind schedule for Discovery\u2019s primary mission of STS-119 in February. <\/p>\n<p>\u2018STS-119 Remark: IS Rescue flight for STS-126 will be ready to launch on 2\/2\/09 with cargo element,\u2019 added the CR presentation \u2013 available on L2 \u2013&nbsp;as a requirement for the changes to be approved. This is an advancement of six days versus the current manifest.<\/p>\n<p>All related&nbsp;elements will be reviewed at a PRCB meeting on August 14, allowing for a month of processing to refine the flow&nbsp;milestones \u2013 known as \u2018critical paths\u2019. <\/p>\n<p>\u2018Long review time has been set to allow some near critical path deliveries to occur: 1) ET-129 delivery. 2) USA (United Space Alliance) ET-127 Stand alone processing. HST hardware on dock at KSC. Better fidelity on HST schedule processing at KSC.\u2019<\/p>\n<p>When the review takes place, several scenarios are available. Firstly, no changes to the current launch dates may be decided, if one or more critical paths is unable to support. All the changes could be approved, or managers could decide on STS-125 launching a few days earlier \u2013 rather than six days \u2013 allowing for STS-126 to gain a few additional opportunities in tandem.<\/p>\n<p><b><i><u>External Tank Status:<br \/><\/u><\/i><\/b><br \/><img loading=\"lazy\" decoding=\"async\" height=\"180\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/index.php?action=dlattach;topic=4345.0;attach=90976;image\" width=\"226\" align=\"left\" vspace=\"5\" border=\"0\/\">With ET-127 now inside the VAB (<em>Click image to view a timelapse movie of ET-127 VAB Ops<\/em>), processing of STS-125 is closing in on another major milestone \u2013 ET\/SRB (Solid Rocket Booster) mating. <\/p>\n<p>The pre-mating review is set to take place on July 25, with the flow timelines showing mating is set to take place at the end of the month.<\/p>\n<p>The tank arrived on the Pegasus barge Tuesday morning, but due to poor weather around KSC, it remained on the barge until later that night.<\/p>\n<p>\u2018External Tank: ET-127 (VAB Checkout Cell): ET-127, onboard the Pegasus Barge, arrived at the VAB Turn Basin yesterday afternoon,\u2019 noted Wednesday processing information.<\/p>\n<p>\u2018The ET was transferred to the VAB (1st motion at 2145 hrs EDT) and lifted to vertical early this morning. It was placed in the checkout cell later this morning with initial inspections to follow.\u2019 <\/p>\n<p>Focus is now being placed on ET-129, with every day gained in the flow aiding&nbsp;the timeline to ship the tank in time to allow managers the option of advancing the launch targets. <\/p>\n<p>This can be seen in a new production process which will debut with Endeavour\u2019s tank. It\u2019ll only save a day\u2019s work on one element of tank production \u2013 but that could prove to be priceless in the bigger picture. <\/p>\n<p>\u2018Relative to ET-127\/ET-129 processing, Orbiter (Project Office) has a task utilizing a Boeing team to do work on the flapper valve on the ET disconnect,\u2019 noted the latest Shuttle Stand-up\/Integration report. \u2018It\u2019s Crit 1 function hardware added after Challenger to ensure the flapper valve doesn\u2019t go closed. <\/p>\n<p>\u2018Today, it takes at least 48 hours to do this work. (However,) they have pulled the community to try and find extra engineers and additional personnel to support this task in 24 hours. Can\u2019t do this for ET-127, (but) for ET-129, they found a JSC engineer that works for Boeing who was once certified to do this task. <\/p>\n<p>\u2018He will re-qualify for this and work with the Boeing team. For Steve Stich (newly promoted as new head of OPO), it\u2019s a good example of the need for innovation in supporting tasks.\u2019<\/p>\n<p>ET-129 itself is currently being processed seven days a week at MAF, as they attempt to get the tank out of the door as close to the start of August as possible. <\/p>\n<p>\u2018ET-129: Moved tank to Building 420, test and checkout cell. Activities are proceeding and are going well. Critical path runs through electrical\/mechanical work,\u2019 added Lockheed Martin\u2019s status on tanks undergoing major production at MAF.<\/p>\n<p>\u2018Cable tray gap closures, final routing and testing, vent valve splice and bonding are also in progress. LO2 feedline TPS (Thermal Protection System) closeouts proceeding this week as well as closeouts at bracket and other TPS closeouts on aft end. Crew came in this weekend and was able to make good progress.\u2019<\/p>\n<p>\u2018ET-130 (STS-119): Tank is in final assembly. Completed leveling. In process of installing platforms so can get to ice\/frost ramp. Expect to start putting simulator in place at end of this week so can begin optics on aft interface hardware installation activities.<\/p>\n<p>\u2018ET-131 (STS-127): Working through flange trims which are 95 percent complete. Completed all of LOX tank ice\/frost ramp applications, and are now working on intertank ice\/frost ramp applications. Have a few more applications to do before can move tank into Cell A.\u2019<\/p>\n<p>All three orbiters are enjoying a smooth flow in their respective OPFs (Orbiter Processing Facilities), with a full processing outline (daily on L2) to be published at the end of the week.<\/p>\n<p><font color=\"#0000ff\"><em>L2 members<\/em><\/font><em>: All documentation&nbsp;\u2013 from which the above article has quoted snippets \u2013 is available in full in the related L2 sections, updated live.<\/em><\/p>\n<p><em>**BRAND NEW STS-124 MISSION OVERVIEW MUSIC VIDEO \u2013 AVAILABLE HERE** (Free Video Section \u2013 Only requires to be logged into the forum)<br \/><\/em><br \/><em>Click here for a range of superb&nbsp;STS mission specific music videos created by Max Q videos<\/em><em>&nbsp;<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>A CR (Change Request) has been issued to attempt to push forward the launch dates of STS-125 and STS-126. If approved, Atlantis\u2019 trip to Hubble will take place NET (No Earlier Than) October 2, allowing Endeavour\u2019s mission to the ISS to move up to November 4. Meanwhile, Atlantis\u2019 External Tank (ET-127) is now being processed [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-41349","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41349"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=41349"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41349\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=41349"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=41349"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=41349"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}