{"id":41353,"date":"2008-07-10T20:50:58","date_gmt":"2008-07-10T12:50:58","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/et-127-completed-for-sts-125-2009-flights-may-slip-further\/"},"modified":"2008-07-10T20:50:58","modified_gmt":"2008-07-10T12:50:58","slug":"et-127-completed-for-sts-125-2009-flights-may-slip-further","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/et-127-completed-for-sts-125-2009-flights-may-slip-further\/","title":{"rendered":"ET-127 completed for STS-125 \u2013 2009 flights may slip further"},"content":{"rendered":"<p>The External Tank that will fly with Atlantis during her STS-125 launch \u2013 ET-127 \u2013 has finally been completed at the Michoud Assembly Facility (MAF) and began its journey to Florida late on Thursday.\n<\/p>\n<p>  However, the ET production battle in New Orleans is by no means over, with ET-129 \u2013 required for the STS-400 Launch On Need (LON) requirements \u2013 remaining on a tight schedule, and the following two tanks \u2013 ET-130 and ET-131 \u2013 both over a month behind schedule.\n<\/p>\n<p><em><img fetchpriority=\"high\" decoding=\"async\" height=\"129\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13910\" width=\"600\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/em><\/p>\n<p><em>**The most comprehensive collection&nbsp;of&nbsp;Shuttle, Ares, Orion&nbsp;and ISS&nbsp;related presentations and mission documentation, plus expansive daily processing documentation and updates&nbsp;are&nbsp;<\/em><font color=\"#0000ff\"><em>available to download&nbsp;on L2<\/em><\/font><font color=\"#0000ff\"><em>&nbsp;**<\/em><\/font><\/p>\n<p><font color=\"#ff0000\"><em><img loading=\"lazy\" decoding=\"async\" height=\"182\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/index.php?action=dlattach;topic=2859.0;attach=83887;image\" width=\"240\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/em><\/font><font color=\"#0033ff\"><em>**Click&nbsp;here for sample of L2 menu and content**<\/em><\/font><font color=\"#ff0000\" size=\"3\"><\/font><font size=\"2\"><\/font><\/p>\n<p><em>**<\/em><font color=\"#ff0000\" size=\"3\"><\/font><font size=\"2\"><em>STS-124 L2&nbsp;Sub Section (over 3400mb) \u2013 Continuing through post flight and post mission IFA\/Mission reviews. 13 Post Flight IFA Review Presentations now available.<\/em><\/font><\/p>\n<p>**STS-125\/LON-400 L2 Sub Section Special already over 1650mb in size \u2013 special section Now Live, with over&nbsp;40 superb mission presentations. STS-125 Flight Plan (newly created) and Flight Data Files now uploaded. Mission Overview in CGI&nbsp;videos building up \u2013 starting with payload overviews.&nbsp;STS-400 Flight Plan. STS-400 EVA and mission overview Presentations (14). Daily extensive processing latest.<font size=\"3\"><\/font><\/p>\n<p><font color=\"#0000ff\" size=\"2\"><em>**STS-124 Post Flight \u2013 STS-119 Processing Latest**<\/em><\/font><font color=\"#000000\">&nbsp;\u2014 <\/font><font size=\"2\"><em>**STS-124 News Articles**<\/em><\/font><\/p>\n<p><font color=\"#0000ff\" size=\"2\"><em>**LIVE updates: Endeavour&nbsp;Dual LON and STS-126 Processing**<\/em><\/font><\/p>\n<p>Rocket launch schedules<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>NASA educational resources<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Spaceflight news subscription<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p><font color=\"#0000ff\" size=\"2\"><em>**LIVE updates on Atlantis&nbsp;STS-125 Processing Flow**<\/em><\/font><font color=\"#000000\">&nbsp;\u2014 <\/font><font size=\"2\"><em>**STS-125 News Articles**<\/em><\/font><\/p>\n<p><\/p>\n<p><em><u>ET-127 Shipping:<\/u><\/em><\/p>\n<\/p>\n<\/p>\n<p>Despite manufacturing delays to ET-127 (and ET-129) ultimately causing the delay to STS-125 from August to October, a massive effort in New Orleans has helped avoid the Hubble mission&nbsp;slipping \u2013 in the worst case scenario \u2013 to the end of the year. <\/p>\n<p>Lockheed Martin managers at MAF \u2013 and their supporting NASA center MSFC (Marshall Space Flight Center) \u2013 ably found \u2018get-wells\u2019 in the production schedules of the two tanks, via a TIM (Technical Interchange Meeting), which&nbsp;resulted in an opening plan to improve the construction schedule. <\/p>\n<p>Despite the effort, ET-127 (STS-125) and ET-129 (STS-400, STS-126) remained behind schedule, as the required shipping dates started to close in for the two tanks. <\/p>\n<p>\u2018ET project has been closely coordinating with the SSP (Space Shuttle Program) Manifest and Scheduling office,\u2019 noted a presentation that pre-empted a meeting to discuss a previously desired \u2013 but no longer possible \u2013 acceleration to STS-125\u2019s launch date by a few days \u2013 designed to relieve strain on STS-126\u2019s launch date the following month.<\/p>\n<p>\u2018ET-127 and ET-129 are currently under-supporting the current need-to-ship dates by 5 days and 13 days respectively.\u2019<\/p>\n<p>However, a \u2018seven days a week, three shift\u2019 production plan, along with concentrated efforts on key safety modifications to the tanks, brought ET-127 inside the required shipping date \u2013 at one point by several days, before slipping back to around deadline once again. <\/p>\n<p>Thursday\u2019s shipping will see ET-127 arrive with a handful of contingency days in the Kennedy Space Center (KSC) flow for an October 8 launch date \u2013 based on the latest&nbsp;deadline of a July 15 shipping commitment. <\/p>\n<p><img loading=\"lazy\" decoding=\"async\" height=\"170\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/index.php?action=dlattach;topic=3993.0;attach=78738;image\" width=\"239\" align=\"left\" vspace=\"5\" border=\"0\/\"><em><font color=\"#0033ff\">**New L2 Trailer Video, with examples of L2 content&nbsp;\u2013 <\/font><font color=\"#ff0000\">TRAILER NOW AVAILABLE \u2013 CLICK IMAGE**<\/font>. <font color=\"#0000ff\"><em>**Includes FIVE&nbsp;Stunning high quality&nbsp;2hr, 355-400mb Camcorder and HUD videos, with&nbsp;crew&nbsp;audio&nbsp;\u2013 from payload bay closure \u2013 through re-entry with an&nbsp;astronaut held camcorder video \u2013&nbsp;to post landing \u2013 several more videos showing landing from 90,000 ft also available and HUD videos from STA landings.<\/em><\/font><\/em><\/p>\n<p>However, a pre-empted plan \u2013 designed in the event of a late arriving tank \u2013 may find a few additional days in the&nbsp;flow&nbsp;up to mating with STS-125\u2019s Solid Rocket Boosters (SRBs). <\/p>\n<p>Even then, the battle to be in a position to&nbsp;aim for an opening launch&nbsp;attempt of STS-125 by&nbsp;October 8 isn\u2019t won, with the unique STS-400 requirement ensuring ET-129 also has to arrive in early August to be within the timeline that will allow Endeavour to roll out to Pad 39B as the rescue shuttle. <\/p>\n<p>With this tank being almost two weeks down on its required shipping deadline just last month, the completion of ET-127 has allowed the workforce concentration to switch tanks. <\/p>\n<p>The benefits of this has already been seen via processing reports which show the shipping date down to August 5 at one point, which is just within schedule.<\/p>\n<p>The MAF effort should not be underestimated, with this being the first time in many years that&nbsp;two new tanks have been required to depart MAF within a month of each other \u2013 added to the fact these tanks are heavily modified with new safety features that have added weeks to the production flow of a new ET.<\/p>\n<p>MAF are close to achieving this depsite a reduced workforce that is still recovering from Hurricane Katrina in their personal lives, and tight constraints on overtime payments.<\/p>\n<p><b><i><u>ET-128 performance (STS-124 IFA Review Part 2):<br \/><\/u><\/i><\/b><br \/><img loading=\"lazy\" decoding=\"async\" height=\"198\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=45907\" width=\"264\" align=\"left\" vspace=\"5\" border=\"0\/\">ET-127 and ET-129 are the second and third \u2018newly built\u2019 External Tanks \u2013 meaning they have been constructed from scratch with the safety changes that have been brought in since the loss of Columbia \u2013 as opposed to complete\/part complete tanks that have been modified.<\/p>\n<p>Debuting the full array of changes was ET-128, which flew with Discovery on STS-124. This proved to be a hugely successful flight of a tank that was also debuting the final \u2018major\u2019 mitigation refinements to prevent foam liberation during ascent. <\/p>\n<p>\u2018Five TPS (Thermal Protection System) debris events assessed as candidate IFA\u2019s based on observed mass loss, and assessment of observed failure mode,\u2019 noted Lockheed Martin\u2019s ET-128 In Flight Anomaly (IFA) review presentation.<\/p>\n<p>\u2018ET-128 Performance Consistent with Previous External Tanks (with only two impacts to the orbiter).\u2019<\/p>\n<p>ET-128 was sporting the modified LH2 IFRs (Ice Frost Ramps), welcomed after 32 divots and three related LH2 acreage foam losses had been registered since Return To Flight.<\/p>\n<p>The change to the ramps was aimed at reducing cracks and delaminations which could lead to cryopumping foam loss, and also a reduction in voids which could lead to void\/delta P foam loss. This, in respect to the ramps, proved to be a near 100 percent success.<\/p>\n<p>ET-128 also debuted the LO2 Feedline Titanium Yoke and TPS (Thermal Protection System) Redesign, following a flight history of 23 occurrences of yoke losses.<\/p>\n<p>The main foam&nbsp;event for STS-124\u2019s ascent came via the LO2 Feedline Support Outboard Base Fitting Closeout, which lost foam at two points of Discovery\u2019s ascent \u2013 one at T+144 seconds, and another at T+216 seconds.<\/p>\n<p>These events were caused by aforementioned \u2018cryo-pumping driven void delta-pressure and delamination\u2019 \u2013 though engineers had already planned ahead for this, with a future refinement to the tanks that&nbsp;will see voids in this area of the tank removed from ET-131 onwards.<\/p>\n<p>\u2018A redesign of the lower outboard and inboard LO2 Feedline Bracket closeouts is currently in work and scheduled to be implemented on ET-131,\u2019 added the presentation. <\/p>\n<p>\u2018Redesign will eliminate the internal voids observed during dissections of ET-94 and ET-120 and is expected to mitigate debris loss in the Inboard and Outboard LO2 Feedline Bracket Closeouts.\u2019<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" height=\"176\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/index.php?action=dlattach;topic=1931.0;attach=88710;image\" width=\"296\" align=\"left\" vspace=\"5\" border=\"0\/\">The LO2 Feedline Support Outboard Base Fitting Closeout liberation events also closely matched those observed on STS-120. However, both their mass and time of release never threatened to cause Discovery any damage of note via an impact to the orbiter.<\/p>\n<p>Of the other areas of foam loss, including the \u2018LH2 Acreage Aft of -Y Bipod Multiple piece release\u2019 \u2013 which resulted in a minimal impact to Discovery\u2019s belly \u2013 shearography tests will be carried out on ET-127 and ET-129 upon their arrival in the checkout cell inside the Vehicle Assembly Building (VAB).<\/p>\n<p>This will enable confidence that voids are not present in those areas of the tank, following their five day barge trip from New Orleans.<\/p>\n<p>All 13 STS-124 IFA presentations are already available to download on L2.<\/p>\n<p><b><i><u>Future ET shipping \u2013 relation to 2009 manifest:<\/u><\/i><\/b><\/p>\n<p>With the newly refined manifest for the remaining missions \u2013 exclusively published by this site, and made official a week or so later by NASA \u2013 aligning flights in the wake of STS-119\u2019s move to February, 2009, the ET shipping dates for ET-130 and ET-131 remain under evaluation.<\/p>\n<p>At present, they are behind schedule and may cause another slip of STS-119 \u2013 which may also involve another full manifest realignment.<\/p>\n<p>The ET shipping date pressure relates to both the primary missions of STS-119 and STS-127, plus their respective abilities to be within schedule to support the preceding mission as the LON requirement.<\/p>\n<p>\u2018MSFC-ET comment: ET-130 currently projects 37 days late to the need ship to support STS-119 launch on 2\/12\/09, this would also have an impact on the LON processing and support to STS-126 required for 2\/8\/09,\u2019 noted a presentation associated with the official release of the refined manifest.<\/p>\n<p>\u2018ET-131 currently projects 32 days late to the need ship to support STS-127 launch on 5\/21\/09. This would also have an impact on the LON processing and support to STS-119 required for 5\/13\/09. Activities are underway to improve the under support posture indicated for the effectivities below.\u2019<\/p>\n<p>An evaluation of the shipping dates will take place shortly after Atlantis launches on STS-125, with managers remaining hopeful that the delays to shipping the two tanks will shrink in the interim period.<\/p>\n<p>\u2018External Tank delivery schedule recovery plans will continue thru the summer and the schedule will be reviewed after the STS-125\/HST launch,\u2019 added the presentation. \u2018Initial assessments indicate schedule recovery is realistic.\u2019<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" height=\"164\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=42316\" width=\"192\" align=\"left\" vspace=\"5\" border=\"0\/\">Another factor that has to be taken into account is the test launch for the Constellation program, namely Ares 1-X \u2013 which currently has a fluid launch date of sometime between April 15 and June 1. This relates to High Bay use in the VAB.<\/p>\n<p>\u2018STS-119 can slip approximately&nbsp;one month before impacting STS-127 Based on Ares I-X use of High Bay 3 (slips out at the pad don\u2019t count). IF Ares I-X slips past August 2009, then shuttle manifest remains \u2018single VAB High Bay\u2019 driven and slips to STS-127 are day for day impact to STS-128.\u2019<\/p>\n<p>The bottom line came via the United Space Alliance\u2019s ground ops team, which stated the dates the two tanks need to be on dock at the Kennedy Space Center (KSC). Any later, and the missions will slip, activating another manifest re-alignment that is likely to include impacts to Ares 1-X.<\/p>\n<p>\u2018Ground operations will require ET-130 on dock 22 November 2008,\u2019 USA noted, \u2018and ET-131 on dock 9 March 2009 (in order) to support proposed STS-119 and STS-127 launch dates.\u2019<\/p>\n<p><font color=\"#0000ff\"><em>L2 members<\/em><\/font><em>: All documentation&nbsp;\u2013 from which the above article has quoted snippets \u2013 is available in full in the related L2 sections, updated live.<\/em><\/p>\n<p><em>**BRAND NEW STS-124 MISSION OVERVIEW MUSIC VIDEO \u2013 AVAILABLE HERE** (Free Video Section \u2013 Only requires to be logged into the forum)<br \/><\/em><br \/><em>Click here for a range of superb&nbsp;STS mission specific music videos created by Max Q videos<\/em><em>&nbsp;<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The External Tank that will fly with Atlantis during her STS-125 launch \u2013 ET-127 \u2013 has finally been completed at the Michoud Assembly Facility (MAF) and began its journey to Florida late on Thursday. However, the ET production battle in New Orleans is by no means over, with ET-129 \u2013 required for the STS-400 Launch [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-41353","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41353"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=41353"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41353\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=41353"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=41353"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=41353"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}