{"id":41354,"date":"2008-07-08T22:37:36","date_gmt":"2008-07-08T14:37:36","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/ares-i-rollercoaster-ees-continues-to-evolve\/"},"modified":"2008-07-08T22:37:36","modified_gmt":"2008-07-08T14:37:36","slug":"ares-i-rollercoaster-ees-continues-to-evolve","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/ares-i-rollercoaster-ees-continues-to-evolve\/","title":{"rendered":"Ares I Rollercoaster EES continues to evolve"},"content":{"rendered":"<p>The design work on the Ares I Emergency Escape System (EES) Rollercoaster is starting to pick up the pace, as the huge project undergoes further refinements on the giant structure that will reside at Pad 39B.\n<\/p>\n<p>  Redesigned as a fixed structure that will rise several hundred feet into the Space Coast panorama, a Design Kick Off presentation has called for three vehicles that can carry nine passengers each, in the event of an emergency evacuation of the pad.\n<\/p>\n<p><em><img fetchpriority=\"high\" decoding=\"async\" height=\"129\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13910\" width=\"600\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/em><\/p>\n<p><em>**The most comprehensive collection&nbsp;of&nbsp;Shuttle, Ares, Orion&nbsp;and ISS&nbsp;related presentations and mission documentation, plus expansive daily processing documentation and updates&nbsp;are&nbsp;<\/em><font color=\"#0000ff\"><em>available to download&nbsp;on L2<\/em><\/font><font color=\"#0000ff\"><em>&nbsp;**<\/em><\/font><\/p>\n<p><em><font color=\"#ff0000\"><em><img loading=\"lazy\" decoding=\"async\" height=\"183\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/index.php?action=dlattach;topic=1484.0;attach=83529;image\" width=\"239\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/em><\/font>All of this article is based on documented L2 information. For an overview of how L2 works, <\/em><font color=\"#ff3300\"><em>**click here for sample video**<\/em><\/font><\/p>\n<p><em><font color=\"#0000ff\">**ARES I LIVE UPDATE PAGES**<\/font><\/em><\/p>\n<p><em>**ORION\/Exploration Vehicles LIVE UPDATE PAGES**<\/em><\/p>\n<p><em><font color=\"#0000ff\">**ARES V \/ Mars LIVE UPDATE PAGES**<\/font><\/em><\/p>\n<p><em><u>**EXPLORATION ALTERNATIVES&nbsp;(DIRECT, EELV) PAGES**<\/u><\/em><\/p>\n<p>Company News<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Rocket building kits<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Space Shuttle models<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p><font color=\"#0000ff\">**ALL NASASpaceflight.com CxP Articles**<\/font><\/p>\n<p><em><u>Rollercoaster EES Latest:<\/u><\/em><\/p>\n<p>Over a year since NASASpaceflight.com\u2019s 2006 exclusive on the EES plans that involved a trade study \u2013 resulting in the rollercoaster being chosen over alternative escape options, such as slide wire baskets and slide tubes \u2013 NASA finally released an image of the system in 2007.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" height=\"186\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/index.php?action=dlattach;topic=7018.0;attach=88102;image\" width=\"252\" align=\"left\" vspace=\"5\" border=\"0\/\">Ironically, that came shortly after that design was scrapped in favour of a fixed, self supporting structure, that will be a permanent fixture at Pad 39B, throwing out plans for a vertical drop for the escaping astronauts and\/or pad crew. <em>Click image for a sample of the L2 video riding the Ares I EES Rollercoaster.<\/em><\/p>\n<p>Such is the size of the project, refinements to the final design will continue through to the final proposal date of November, 2009. However, with the basic design of the structure now appearing to be more solid since the major change last year, focus is now being placed on the coaster\u2019s railcars.<\/p>\n<p>Those cars \u2013 three of them \u2013 are tasked with evacuating up to 18 people \u2013 despite capacity for 27 \u2013 from the pad in the event of an emergency. Currently open cars, their design may be refined to be enclosed, especially when considering an evacuation caused by a hypergolic leak.<\/p>\n<p>\u2018The EES shall be able to accommodate a maximum of 18 persons (two cars full \u2013 or three with room) including 6 flight crew, up to 6 closeout crew and\/or ground operations personnel, and 6 fire\/rescue personnel,\u2019 noted the expansive presentation, available on L2.<\/p>\n<p>\u2018The EES shall accommodate up to 12 incapacitated persons (laid on the floor of the cars) out of the maximum capacity of 18 persons.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" height=\"173\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/index.php?action=dlattach;topic=5433.0;attach=88100;image\" width=\"188\" align=\"left\" vspace=\"5\" border=\"0\/\">\u2018It shall be able to egress up to 12 persons to include 6 flight crew, and up to 6 closeout crew and\/or ground operations personnel in 1.5 minutes with no assistance from fire\/rescue personnel. <\/p>\n<p>\u2018The 1.5 minutes starts when the last person enters into the EES vehicle on the loading platform and ends when the last person enters the safety bunker. For reference purposes the total egress timeline starting outside the CEV hatch and ending at the existing bunker is 2 minutes.<\/p>\n<p>\u2018The EES rail vehicles shall accommodate flight crew (astronauts) in space suits, rescue workers in fire suits, and closeout crew and ground support personnel in SCAPE suits or ordinary clothing.\u2019<\/p>\n<p>\u2018The EES shall provide a clear route in the vehicle loading area into the egress vehicles without any steps or stairs, with accommodation for Firex Protection spray.\u2019<\/p>\n<p>The requirements noted in the presentation also point to coaster being fully tested before every launch, though it is not clear if the test run will involve lucky United Space Alliance workers, or astronauts \u2013 or if the passengers will be substituted by weights.<\/p>\n<p>\u2018The EES shall be designed to allow an operational demonstration (e.g., weighted and run down the tracks to its endpoint at the existing safety bunker) for every vehicle flow,\u2019 added the presentation. \u2018The EES shall provide a vehicle retrieval mechanism, such as a hoist, to return vehicle from the ground section back to the loading area.\u2019<\/p>\n<p>The system will be unpowered \u2013 required in the event of a power failure on the pad \u2013 and can be started without any interaction from those evacuating the pad. Once the cars begin to roll down the track, gravity will be the main driving force for the long \u2013 but speedy \u2013 trip to the protective bunker.<\/p>\n<p>\u2018The EES shall be a passive system requiring human action to start, but no human action to stop. The vehicle launching mechanism shall be unpowered, and gravity or mechanically driven with a minimal to zero degree ramp angle for personnel loading.<\/p>\n<p>\u2018The EES vehicles shall provide a fire and flash barrier for egressing personnel during trip, such as protective siding on vehicles, and shall provide fall and injury protection for pad personnel once egress vehicles leave the tower.<\/p>\n<p>\u2018The ground section of the EES shall provide areas of ground clearance for personnel and maintenance vehicles on the LC-39B surface.\u2019<\/p>\n<p>Design work will include requirements for the giant structure to withstand wind strengths and the thrust of Ares I\u2019s departure from the pad. Its vast steel work will be specially coated to help avoid corrosion.<\/p>\n<p>\u2018Meet wind load requirements outlined in documentation. It shall be capable of withstanding launch dynamic loading, and meet corrosion and protective coating requirements.\u2019<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" height=\"194\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/index.php?action=dlattach;topic=5433.0;attach=88101;image\" width=\"204\" align=\"left\" vspace=\"5\" border=\"0\/\">Maintenance of the cars will be carried out in the bunker \u2013 which is still in an early phase of design. Sources note the bunker will act as a protective structure that doubles up as a maintenance hanger for servicing the cars.<\/p>\n<p>Interestingly, images contained within the presentation show the pad to still have the Rotating Service Structure (RSS) and Fixed Service Structure (FSS) used for shuttle remaining in place.<\/p>\n<p>They have no purpose in the Ares program, but their removal is not assigned in the tight Constellation budget and thus are likely to remain in place for some time \u2013 and possibly during&nbsp;the first few launches of Ares I.<\/p>\n<p>With those structures remaining in place, added to the Rollercoaster EES being a permanent fixture at the complex and surrounded by the three 600 ft lightning protection towers, Pad 39B will dominate the skyline at KSC. Those towers have already started to rise out of the ground around 39B.<\/p>\n<p>Pad 39B will host its final shuttle during the STS-400 Launch On Need (LON) requirement this fall, when Endeavour sits on the pad during Atlantis\u2019 launch on STS-125 from 39A. Once the standdown has been given, Endeavour will then roll to Pad 39A for her primary mission \u2013 STS-126.<\/p>\n<p><em>To review the latest&nbsp;series of Ares\/Orion articles based on documentated engineering processes being carried out on the vehicles at this time. Click for: <\/em><em>**Part 1**<\/em><em>&nbsp;\u2013&nbsp;<\/em><em>**Part 2**<\/em><em>&nbsp;\u2013 <\/em><em>**Part 3**<\/em><em>&nbsp;\u2013 <\/em><em>**Part 4**<\/em><em>&nbsp;<\/em><em>**Part 5**<\/em>&nbsp;\u2013 <em>**Part 6**<\/em>&nbsp;\u2013 <em><u>**Part 7**<\/u><\/em><\/p>\n<p><em><img loading=\"lazy\" decoding=\"async\" height=\"137\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=42321\" width=\"197\" align=\"left\" vspace=\"5\" border=\"0\/\">Selection of L2 Resources For Ares I, V and Constellation:&nbsp;<\/em><\/p>\n<p>20mb of new Lunar Images of Chariot, Athlete and Lunar Crane. Ares I KSC Processing Master Book&nbsp;\u2013 184 pages.<em>&nbsp;Changes for Ares I-X (Images). PRCB Transition Presentation (Shuttle to Ares). Ares V (5.5\/6xRS-68) Presentation (and more). Orion Parachute Vehicle Images. Latest Risk Matrix for Ares. SI Unit Directive Document. CxP PMR08 Manifest. PDR and associated notes from CPCB meeting. Full (and very expansive) list of&nbsp;current Ares\/Orion mass and status report.&nbsp;Ares I \u2018Parasorber\u2019 TO migitation hardware presentation and animation. Orion Parachute Test Vehicle (PTV)&nbsp;Photographs. <\/em><\/p>\n<p><em>110mb worth of Ares I-X Weekly Test Presentations (Ares I-X, J2-X etc. up to end of April) The Orion LIDS (Low Impact Docking System) Section (Images, Videos, Engineering Notes). Hi Res Images of Ares I in the VAB. Ares I-X Integrated Milestone Charts. Ares I Thrust Oscillation Focus Team Status Presentations (over 50mb \u2013 includes DTO on Shuttle missions), Ares I-X Global Buckling Status Presentation,&nbsp;Ares I \u2013 Launch Pad Stabilization and Damping Presentation, Ares I: Purge\/Vent\/Drain and Vehicle Access Presentation. <\/em><\/p>\n<p>Ares Tilt Up Umbilical Arm (TUUA) Test \u2013 Video, Ares\/Orion Comm and Tracking Presentation, Ares I Nozzle Extension Update Presentation, Ares\/Orion Integrated Stack TIM Summary (Major Issues) Presentation, Orion Land vs Water Landing Update + Crew Survival (post 36 hrs) Presentations.<\/p>\n<p>Altair Overview Presentation. Ares I Risks and Status. Ares I-X Booster Recovery Images and Video. Ares I-X Pad Images. Ares I-Y Mission Overview Video (50mb \u2013 Superb).&nbsp;<!--StartFragment --> Orion Lunar Transit CGI Video. (Several more videos, including first video of Orion splashdown).&nbsp;<!--StartFragment --> <\/p>\n<p><em><img loading=\"lazy\" decoding=\"async\" height=\"164\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=42316\" width=\"192\" align=\"left\" vspace=\"5\" border=\"0\/\">Orion Rendezvous with the ISS CGI Video, plus AERCam Inspections. Ares I Thurst Oscillation Update Section.&nbsp;<!--StartFragment --> Images of completed PA-1 boilerplate Command Module at LaRC.&nbsp;<!--StartFragment --> CxP Planning for Architecture Closure \u2013 Feb 19. Ares V Overview Presentations. Other Major CxP Updates for Feb (List restricted to L2).<br \/><\/em><br \/><em>Orion 607 Overview Presentation (Jan 08), Constellation Program Status\/Budget and new Manifest to Orion 20&nbsp;Presentation (Jan, 08). Michoud Transition to Ares I\/V (Jan 17, 08). Several MLAS (Max Launch Abort System)&nbsp;Presentations. Over 60&nbsp;Hi Res Images of Orion Mock-up at JSC&nbsp;(Hatch, Seats, Flight Deck) \u2013 December. <\/em><\/p>\n<p><em>Lunar Habitat Assembly.&nbsp;PRCB Presentations&nbsp;on hardware and infrastruction transition (from Palmdale to MLP Park)&nbsp;\u2018Follow live\u2019 Lightning Towers Construction images.&nbsp;Latest Mobile Launcher details. Orion\/Ares I\/Delta IV Heavy<!--StartFragment -->&nbsp;NEO Feasibility Study (Video).&nbsp;Constellation EVA Study Presentation. Superb Gene Kranz address to&nbsp;CxP&nbsp;workforce&nbsp;(Apollo to Orion feature) video. MOD \u2018LEO to Mars\u2019 presentations.<\/em><\/p>\n<p>Superb Ares I Launch Ascent, Pad&nbsp;Abort Test CGI Videos (three). Integrated Stack (IS) Technical Interchange Meeting (TIM) notes&nbsp;\u2013 Nov 6 to Nov 15. The full \u20188th Floor News\u2019 \u2013 Constellation Update (performance issues) \u2013 Nov 5. Ares I Mobile Launcher PMR.<\/p>\n<p><em><img loading=\"lazy\" decoding=\"async\" height=\"267\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=19781\" width=\"150\" align=\"left\" vspace=\"5\" border=\"0\/\">\u2018Proposed\u2019 Ares I SRBSF (Mini VAB) and graphic. LSAM (LDAC-1) Video and Images. Several Constellation All Hands Videos and Presentations. Ares I Pad Rollercoaster (Old and New presentation and slides \u2013 the very cool \u2018CGI ride on the Ares pad coaster\u2019 video. Ares I VAB \u2018In-Line\u2019 Stacking presentation slides.<\/em><\/p>\n<p><em><i>Presentation of Ares\/Orion impacts relating to Shuttle manifest acceleration. Ares I Interstage diagrams. Ares V Super Crawler. Ares I Launch Pad images (ML etc.) Hi Res images of Ares I-X Upper Stage. Orion 606-7 Data Updates. Updates Constellation launch schedule through to Orion 15. Orion Seat test photos. New ML Graphic and info. New Ares V graphic and baseline data. Large collection of hi res Orion paracute drop tests. SIX Part Series of Ares I Upper Stage Graphical Overviews. DAC-1C DDD Vast Slides on Vehicle Design. ATK First Stage Presentation. 39B Lightning Towers Slides. DAC-1C Departure points to DAC-2 Upper Stage Graphcs (Many Changes). <\/i><\/em><\/p>\n<p>Orion\/CEV Display Layout Presentation (40 pages). ATK figures on the 5-Seg Booster weight for CLV. Weather Shield (Rain Shield) for Orion on the pad. New Super hi-res images of Ares I. ATK Cutaway graphics of Ares I \u2013 perspective and axonometric. Ares I\/Orion CxP 72031 Requirements Validation Matrix Information. CEV Paracute Assembly System (CPAS) Presentation. <\/p>\n<p>Orion Launch Abort System (LAS) overview presentation. Changes to Ares I Upper Stage \u2013 expansive details and data. Ares I\/Orion CxP 72031 Requirements Validation Matrix Information. CLV Umbilical Trade Matrix XLS. Vehicle interfaces for the DAC 1C version of Orion Ares. Ares I-X Test Flight Plan (full outline) Presentation. Ares I-X timeline and modification expanded info. Ares I Reference Trajectory. Boeing\u2019s STS to Ares \u2013 Lessons Learned Presentation. CLV DAC-1C (Changes to CLV Upper Stage). <\/p>\n<p><img loading=\"lazy\" decoding=\"async\" height=\"155\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=42319\" width=\"185\" align=\"left\" vspace=\"5\" border=\"0\/\">Ares I-X: Four Seg+Dummy \u2018Tuna Can\u2019 stage. Ascent Developmental Flight Test Presentation. CLV Pad 39B Handover Info and Latest. New images of CLV on top of new MLP and LUT. Lockheed Martin CEV\/Orion Updates. ATK figures on the 5-Seg Booster weight for CLV. <\/p>\n<p>90 Minute Video of Constellation all hands meeting. Escape System Trade Study Presentation. CEV-CLV Design Analysis Cycle Review (DAC-2) Presentation. Flight Design and Dynamics Division CEV update. CLV Mono-propellant RCS system. CEV pressurisation system review. CLV\/CEV Configuration Images. The 2\u00d73 Seg SRB Crew Launch Vehicle Option Presentation\u2026<\/p>\n<p>\u2026.plus much more (L2 Constellation over 180,000mb in size).<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The design work on the Ares I Emergency Escape System (EES) Rollercoaster is starting to pick up the pace, as the huge project undergoes further refinements on the giant structure that will reside at Pad 39B. Redesigned as a fixed structure that will rise several hundred feet into the Space Coast panorama, a Design Kick [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-41354","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41354"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=41354"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41354\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=41354"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=41354"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=41354"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}