{"id":41360,"date":"2008-06-28T01:18:43","date_gmt":"2008-06-27T17:18:43","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/sts-125-planning-continues-with-scheduled-eva-6-option\/"},"modified":"2008-06-28T01:18:43","modified_gmt":"2008-06-27T17:18:43","slug":"sts-125-planning-continues-with-scheduled-eva-6-option","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/sts-125-planning-continues-with-scheduled-eva-6-option\/","title":{"rendered":"STS-125: Planning continues with scheduled EVA-6 option"},"content":{"rendered":"<p>With unique Thermal Protection System (TPS) inspection techniques already installed into Atlantis\u2019 flagship STS-125 mission this October, focus has now moved on to refining the Extra-Vehicular Activities (EVAs) that are scheduled to be performed as part of the complex ballet to increase the HST\u2019s longevity well into the next decade.\n<\/p>\n<p>  Planning documentation shows the possibility of record sixth back-to-back \u201cscheduled\u201d EVA.\n  <\/p>\n<p><em><img fetchpriority=\"high\" decoding=\"async\" height=\"129\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13910\" width=\"600\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/em><\/p>\n<p><em>**The most comprehensive collection&nbsp;of&nbsp;Shuttle, Ares, Orion&nbsp;and ISS&nbsp;related presentations and mission documentation, plus expansive daily processing documentation and updates&nbsp;are&nbsp;<\/em><font color=\"#0000ff\"><em>available to download&nbsp;on L2<\/em><\/font><font color=\"#0000ff\"><em>&nbsp;**<\/em><\/font><\/p>\n<p><font color=\"#ff0000\"><em><img loading=\"lazy\" decoding=\"async\" height=\"182\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/index.php?action=dlattach;topic=2859.0;attach=83887;image\" width=\"240\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/em><\/font><font color=\"#0033ff\"><em>**Click&nbsp;here for sample of L2 menu and content**<\/em><\/font><font color=\"#ff0000\" size=\"3\"><\/font><font size=\"2\"><\/font><\/p>\n<p><em>**<\/em><font color=\"#ff0000\" size=\"3\"><\/font><font size=\"2\"><em>STS-124 L2&nbsp;Sub Section (over 3400mb) \u2013 Continuing through post flight and post mission IFA\/Mission reviews.<\/em><\/font><\/p>\n<p>**STS-125\/LON-400 L2 Sub Section Special already over 1650mb in size \u2013 special section Now Live, with over&nbsp;40 superb mission presentations. STS-125 Flight Plan (newly created) and Flight Data Files now uploaded. Mission Overview in CGI&nbsp;videos building up \u2013 starting with payload overviews.&nbsp;STS-400 Flight Plan. Daily extensive processing latest.<font size=\"3\"><\/font><\/p>\n<p><font color=\"#0000ff\" size=\"2\"><em>**STS-124 Post Flight \u2013 STS-119 Processing Latest**<\/em><\/font><font color=\"#000000\">&nbsp;\u2014 <\/font><font size=\"2\"><em>**STS-124 News Articles**<\/em><\/font><\/p>\n<p><font color=\"#0000ff\" size=\"2\"><em>**LIVE updates: Endeavour&nbsp;Dual LON and STS-126 Processing**<\/em><\/font><\/p>\n<p>Spaceflight<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>NASA mission patches<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Aerospace &amp; Defense<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p><font color=\"#0000ff\" size=\"2\"><em>**LIVE updates on Atlantis&nbsp;STS-125 Processing Flow**<\/em><\/font><font color=\"#000000\">&nbsp;\u2014 <\/font><font size=\"2\"><em>**STS-125 News Articles**<\/em><\/font><\/p>\n<p><\/p>\n<p><em><u>STS-125 Launch Date Latest:<\/u><\/em><\/p>\n<\/p>\n<\/p>\n<p>With the mission limited to a duration of 11+2 flight days \u2013&nbsp;due to cryo tank margins \u2013&nbsp;mission planners have already&nbsp;baselined five scheduled EVAs and one unscheduled EVA&nbsp;\u2013 all of which come in under seven hours in duration. <\/p>\n<p>However, planning documentation shows the mission now has an option of six EVAs, plus one unscheduled EVA, which would be \u2018breaking new ground\u2019.<\/p>\n<p>As per original baseline, once Atlantis\u2019 crew has captured the HST on Flight Day 3 (FD-3), the crew will perform five back-to-back EVAs. <\/p>\n<p><img loading=\"lazy\" decoding=\"async\" height=\"194\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/index.php?action=dlattach;topic=4634.0;attach=85022;image\" width=\"258\" align=\"left\" vspace=\"5\" border=\"0\/\">\u2018Five scheduled EVAs: EVA-1 (RSU, Battery\/Bay 3) 6hrs 45mins; EVA-2 (Cosmic Origins Spectrograph, Battery\/Bay 2) 6hrs 50mins; EVA-3 (Wide Field Camera III, NOBL 5, 7, and&nbsp;8) 6hrs 10mins,\u2019 notes the mission planning Mission Operations Directorate (MOD) presentation available for download on L2.<\/p>\n<p>\u2018EVA-4 (Space Telescope Imaging Spectrograph, STIKER) 6hrs 25mins;&nbsp; EVA-5 (FGS 3 (possibly #2), OVP, OCE-EK (not required if FGS 2) 6hrs 30mins.\u2019<\/p>\n<p>Nevertheless, while the completion of these EVAs&nbsp;are necessary for HST life extension, they are not critical to a successful landing of Atlantis at the end of her mission. <\/p>\n<p>Therefore, all EVA activities are considered secondary to TPS concerns relating to the inspections of the vehicle\u2019s heat shield performed by the crew on FD-2. <\/p>\n<p>If a Focused Inspection (FI) is deemed necessary based on FD-2 images, the FI&nbsp;would be performed at the beginning of FD-4.<br \/>&nbsp;<br \/>\u2018EVA-1 execution and\/or content \u2018TBD\u2019 and is based on the time required to complete FI which is dependent on the number of Areas of Interest that require inspection, their location, and number of views. Possibility that downstream EVAs and planning will be affected,\u2019 notes the MOD presentation.<\/p>\n<p>Meanwhile, to ensure there are no complications for Atlantis from the HST during deorbit, entry, and landing, a sixth, unscheduled EVA is being protected for in the mission timeline.<\/p>\n<p>This sixth EVA would be performed only if complications arise during the deployment of the HST at the end of the mission.<\/p>\n<p>\u2018Plan is to prepare for a \u2018Rapid Response\u2019 EVA in parallel with HST release activities on FD-9 since only one \u2018unscheduled\u2019 EVA available,\u2019 added the flight planning document.<\/p>\n<p>For this possibility, mission planners have identified a few issues that may lead to an unscheduled EVA to aid the HST\u2019s deployment from Atlantis. <\/p>\n<p>These issues include the failed deployment of the HST\u2019s Hi Gain antenna, incomplete detachment of umbilicals from HST and the FSS in Atlantis\u2019 Payload Bay, and the failure of HST\u2019s aperture door. <\/p>\n<p>To accomplish all five back-to-back EVAs with minimal stress on the crew, mission planners have identified the need for four Extra-vehicular Mobility Units (EMUs), one for each spacewalker. In the past, HST repair missions have only carried three EMUs for their spacewalkers.<\/p>\n<p><em><u>Possible Sixth \u2018Scheduled\u2019 EVA:<br \/><\/u><\/em><br \/>During the initial planning phase of the mission, the MOD conducted a trade-off study to determine if a sixth scheduled EVA could be added to the STS-125 timeline.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" height=\"186\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/index.php?action=dlattach;topic=4634.0;attach=85023;image\" width=\"266\" align=\"left\" vspace=\"5\" border=\"0\/\">\u2018Replace \u2018Unscheduled\u2019 EVA with \u2018Scheduled\u2019 EVA-6. Results in six \u2018Back to Back\u2019 EVAs. Breaking new ground. Will have crew fatigue concerns,\u2019 notes the MOD presentation. <\/p>\n<p>Crew fatigue concerns would become an issue because all of the Late Inspections would have to occur on FD-10. This would mean the elimination of the crew\u2019s off-duty time that would normally be scheduled for FD-10, following the completion of Late Inspections, that would normally be spread over FD-9 and FD-10 of a five EVA mission. <\/p>\n<p>The elimination of the crew\u2019s off-duty time creates a violation of Shuttle Crew Scheduling Constraints (SCSC). <\/p>\n<p>If the Space Shuttle Program (SSP) were to proceed with a six planned EVA mission, the request would have to come from the HST program and a review of the Mission Safety Critical Requirements would have to be conducted by the SSP.<\/p>\n<p>\u2018SCSC developed to \u2018ensure safety and well being of crewmembers who perform a wide variety of tasks associated with the vast challenges of a Shuttle mission ensuring a safe mission first and successful mission second,\u201d added the MOD presentation. <\/p>\n<p>\u2018Understand HST Program\u2019s desire to optimize HST capability with SM4 being the last servicing mission but do not want to compromise safety or incur any additional risks.\u2019<\/p>\n<p>Nevertheless, exchanging the unscheduled EVA with a scheduled EVA limits the possibility of a contingency EVA should some component of the HST fail during the first deployment opportunity.<\/p>\n<p>To accomplish a potential sixth planned EVA while still protecting for an unscheduled EVA for HST deployment, the MOD is investigating three additional options aside from simply replacing the unscheduled EVA with a scheduled EVA.&nbsp; <\/p>\n<p>These remaining three options include rendezvousing with HST on FD-2 instead of FD-3 (thereby deferring all TPS inspections to FD-9 and FD-10), eliminating one of the two End of Mission (EOM) contingency days, and eliminating\/modifying the Late Inspection requirement.<\/p>\n<p>The first option would see Atlantis rendezvousing with the HST on FD-2 instead of FD-3.<\/p>\n<p>\u2018For specific Launch Phase angles the capability exists to support a FD-2 rendezvous. Thought is that rendezvous on FD-2 will buy back additional time for EVA activities,\u2019 notes the mission planning document.<\/p>\n<p>There are, however, many impediments to this option, the first of which being the elimination of TPS inspections until after HST deployment at the end of the mission.<\/p>\n<p>\u2018FD-2 TPS inspections provide expedited assessment of TPS after ascent. Expedited assessment provides early response and kickoff of any activities required to verify\/provide integrity to TPS for Entry support,\u2019 the MOD presentation adds. <\/p>\n<p><img loading=\"lazy\" decoding=\"async\" height=\"186\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/index.php?action=dlattach;topic=4634.0;attach=85024;image\" width=\"266\" align=\"left\" vspace=\"5\" border=\"0\/\">\u2018Provides maximum \u2018on-orbit\u2019 time to evaluate and plan repair activities as required (such as) Focused Inspections\/EVA repair. Delay in acquiring this data delays working\/executing \u2018corrective\u2019 actions.\u2019<\/p>\n<p>Other concerns for a FD-2 rendezvous include the time necessary to configure the orbiter for HST capture and berthing.&nbsp; These concerns include Remote Manipulator System checkout, photo TV setup, FSS preparations for HST berthing, EMU checkout, and EVA-1 preparations to name a few.<\/p>\n<p>The second option would see the elimination of the EOM+2 flight day. This would allow for the normal FD-2 TPS inspections and FD-3 rendezvous with HST while adding an additional FD to accommodate six scheduled EVAs and one unscheduled EVA.<\/p>\n<p>The two EOM contingency days are a required part of every Space Shuttle mission to ensure protection against weather and systems wave-offs. However, there is a flight history to support the elimination of EOM+2 in support of mission objectives. <\/p>\n<p>\u2018For STS-116, EOM+2 was traded to support EVA-4 (ISS critical safety item) and retain Late Inspection. Both items defined as Safety of Flight\/Mission Critical. Loss of EOM+2 required landing the vehicle on nominal EOM at any of the available CONUS sites.\u2019<\/p>\n<p>If this strategy were employed on STS-125, it would protect for all mission safety and HST success operations while translating to a mandatory landing on FD-13 at any of the three United States landing sites, unless weather or systems failure occurs.<\/p>\n<p>The third option would see the elimination of the Late Inspection requirement. While this option will most likely be decided against in the best interest of crew and vehicle safety, it is note worthy simply because it is the first time since the employment of Late Inspection on STS-121 that its possible elimination has been mentioned in mission planning documents. <\/p>\n<p>\u2018Loss of TPS Wing Leading Edge (WLE) integrity checks could result in a catastrophic failure. Late Inspection buys down odds of this risk from 1\/180 to 1\/240. Risks are managed within capabilities,\u2019 the MOD presentation notes.<\/p>\n<p>Another Late Inspection discussion in the MOD flight planning document is the possibility of partial Late Inspections. This option would see the flight crew inspect a portion of the vehicle\u2019s WLE; however, \u2018the integrity of the (WLE) that (is) not surveyed will not be established.\u2019<\/p>\n<p>If a sixth scheduled EVA were to be added to the STS-125 mission timeline, it would more than likely include the repair of the Advanced Camera for Surveys which recently failed on the orbiting telescope.<\/p>\n<p><font color=\"#0000ff\"><em>L2 members<\/em><\/font><em>: All documentation&nbsp;\u2013 from which the above article has quoted snippets \u2013 is available in full in the related L2 sections, updated live. STS-125 Movie Screenshots taken video video available *here*<\/em><\/p>\n<p><em>**BRAND NEW STS-124 MISSION OVERVIEW MUSIC VIDEO \u2013 AVAILABLE HERE** (Free Video Section \u2013 Only requires to be logged into the forum)<br \/><\/em><br \/><em>Click here for a range of superb&nbsp;STS mission specific music videos created by Max Q videos<\/em><em>&nbsp;<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>With unique Thermal Protection System (TPS) inspection techniques already installed into Atlantis\u2019 flagship STS-125 mission this October, focus has now moved on to refining the Extra-Vehicular Activities (EVAs) that are scheduled to be performed as part of the complex ballet to increase the HST\u2019s longevity well into the next decade. Planning documentation shows the possibility [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-41360","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41360"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=41360"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41360\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=41360"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=41360"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=41360"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}