{"id":41392,"date":"2008-06-05T00:06:17","date_gmt":"2008-06-04T16:06:17","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/kibo-hatch-opening-complete-unberthing-incident-evaluation\/"},"modified":"2008-06-05T00:06:17","modified_gmt":"2008-06-04T16:06:17","slug":"kibo-hatch-opening-complete-unberthing-incident-evaluation","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/kibo-hatch-opening-complete-unberthing-incident-evaluation\/","title":{"rendered":"Kibo hatch opening complete \u2013 unberthing incident evaluation"},"content":{"rendered":"<p>STS-124\u2019s Flight Day 5 saw several events taking place, including the changeout of a Carbon Dioxide Removal Assembly (CDRA) bed and a fix for the Russian toilet pump \u2013 both of which appear to have been successful.\n<\/p>\n<p>  The highlight of the day was the hatch opening to the newly attached Kibo Module \u2013 which is currently the center of evaluations on whether it recontacted Discovery\u2019s payload bay during unberthing on Tuesday.\n<\/p>\n<p><em><img fetchpriority=\"high\" decoding=\"async\" height=\"129\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13910\" width=\"600\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/em><\/p>\n<p><em>**The most comprehensive collection&nbsp;of&nbsp;Shuttle, Ares, Orion&nbsp;and ISS&nbsp;related presentations and mission documentation, plus expansive daily processing documentation and updates&nbsp;are&nbsp;<\/em><font color=\"#0000ff\"><em>available to download&nbsp;on L2<\/em><\/font><font color=\"#0000ff\"><em>&nbsp;**<\/em><\/font><\/p>\n<p><font color=\"#ff0000\"><em><img loading=\"lazy\" decoding=\"async\" height=\"139\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=31173\" width=\"212\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/em><\/font><em><font color=\"#0033ff\">**Click&nbsp;here for sample of L2 menu and content**<\/font><\/em><font color=\"#ff0000\" size=\"3\"><\/font><font size=\"2\"><em><\/em><\/font><\/p>\n<p>**<font color=\"#ff0000\" size=\"3\"><\/font><font size=\"2\"><em>STS-124 Sub Section (over 2000mb already) \u2013 Includes Flight Plans, S0007 Documents. Mission Overview&nbsp;CGI Videos.&nbsp;Plus&nbsp;25 Flight Readiness Review (FRR) Presentations,&nbsp;a multitude&nbsp;of mission presentations&nbsp;and extensive, live,&nbsp;processing flashes, updates. MMT level&nbsp;Live Flight Day Coverage has begun.<\/em><\/font><\/p>\n<p>RPM, ET Umbilical Well, 40 Pad Damage Images (Exclusives) and 120mb Engineering Replays of Launch \u2013 now available.<\/p>\n<p>**STS-125\/LON-400 Sub Section Special already over 1600mb in size \u2013 special section Now Live, with over&nbsp;40 superb mission presentations.<font size=\"3\"><\/font><\/p>\n<p><font color=\"#0000ff\" size=\"2\"><em>**STS-124 LIVE FLIGHT DAY SPECIFIC UPDATE PAGES (The most extensive live coverage on the net)**<\/em><\/font><\/p>\n<p>Space Shuttle models<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Spaceflight<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Space Technology<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p><font size=\"2\"><em>**STS-124 News Articles**<\/em><\/font><br \/><em><u><\/u><\/em><\/p>\n<p>STS-124 FD-5 Latest:<\/p>\n<\/p>\n<p>Discovery continues to perform extremely well, with no issues in work, and no TPS (Thermal Protection System) damage concerns that hold any constraint for a safe re-entry \u2013 leading to yesterday\u2019s MMT (Mission Management Team) being informed there would not be a requirement for a focused inspection. <\/p>\n<p><img loading=\"lazy\" decoding=\"async\" height=\"152\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/index.php?action=dlattach;topic=1273.0;attach=74900;image\" width=\"186\" align=\"left\" vspace=\"5\" border=\"0\/\">\u2018Three items were identified which either exceeded pre-defined screening criteria or for which no criteria exists. Nine items were evaluated using standard procedures\/tools, and the following four required additional analysis:<\/p>\n<p>\u2018Tile is damaged adjacent to NLGD (Nose Landing Gear Door) thermal barrier,\u2019 noted imagery evaluations. <\/p>\n<p>\u2018Aft fuselage just forward on the body flap. Engine 2 dome heat shield carrier panel tile damage. Unknown protrusion next to RH ET (Right Hand External Tank) door.<\/p>\n<p>\u2018No focused inspection is required at this time based on the data available from RPM (Rbar Pitch Maneuver) images and FD 2 inspections with the Robotic Arm. Additional work is required to officially closeout the above 13 items.\u2019<\/p>\n<p><em><u>OBSS Checkouts:<\/u><\/em><\/p>\n<p>Flight Day 5\u2019s tasks include the checkout of the Orbiter Boom Sensor System (OBSS), following its handoff to Discovery after several months stowed on the International Space Station (ISS).<\/p>\n<p>The OBSS instrumentation package \u2013 which rides on the end of the 50 foot boom \u2013 consists of visual imaging equipment, the Laser Dynamic Range Imager (LDRI), and the Laser Camera System (LCS). The post-Columbia modification has sensors that can resolve at a resolution of few millimeters, and can scan at a rate of about 2.5 inches per second.<\/p>\n<p>The tests include checkouts of the sensor suite on the end of the boom, which contains thermal-sensitive equipment. No unexpected errors have been noted during checkouts, mainly thanks to the system only being unpowered \u2013 thus lacking use of its heaters \u2013 for around 30 minutes during handoff. <\/p>\n<p><em><u>Kibo Outfitting and Hatch Opening:<br \/><\/u><\/em><br \/>Flight Day 5 tasks include the Installation of a Node 1 airlock check valve, the removal, replacement and return carbon dioxide removal assembly (CDRA) bed number 2, and the outfitting of the Kibo (or Japanese Pressurized Module) laboratory.<\/p>\n<p>\u2018Perform JPM vestibule outfitting. Activate JPM avionics and power channel B. Enter JPM and take air samples. Transfer JEM robotic arm central control panel rack,\u2019 noted a summary of activities involved with Kibo today. <\/p>\n<p>\u2018The JEM crew members will terminate the JPM Fine Leak Check this morning before getting into the Vestibule 1 and 2 Outfitting Activities. Vestibule Outfit 1 activities include: Opening the N2 Port Hatch. <\/p>\n<p>\u2018Removal of 4 CPA\u2019s (Controller Panel Assembly \u2013 boxes that drive the CBM, which blocks access to the jumpers). Power and data jumper cable hook-ups. N2 to JPM Pressure Equalization. JPM Channel B Activation will be completed following Vestibule Outfit 1. <\/p>\n<p>\u2018Vestibule Outfit 2 activities include: Audio and Video Hookup. LTCS (Liquid Thermal Control System) QD Connections. IMV Duct Installation. Environmental System Configurations (Condensate Waste Water, Air Revitalization System, Low Pressure Nitrogen). Ethernet and Wireless Audio Hookup.\u2019<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" height=\"211\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/index.php?action=dlattach;topic=1273.0;attach=74899;image\" width=\"277\" align=\"left\" vspace=\"5\" border=\"0\/\">Once Vestibule Outfit 2 is complete, crew members will open the JPM hatch, activate the Aft IMV (Intra-Module Ventilation) fan, and then ingress the JPM. <\/p>\n<p>\u2018JPM Activation and Setup procedures include Emergency Equipment Prep, Grab Sample Container (GSC), Negative Pressure Relief Valve (NPRV) Checkout, FSE Accumulator Disconnect, Thermal Control Assembly Medium (TCA M) Accumulator Valve Open.<\/p>\n<p>\u2018Portable Fire Extinguisher (PFE) Inspect, Emergency Lighting Power System (ELPS) Enable, Post Pressure Relief Valve (PPRV) Cap Install, JPM Setup Part 1, and System Laptop Terminal (SLT) and Portable Computer System (PCS) Install.\u2019<\/p>\n<p>The JEM RMS rack will be transferred as the last JEM activity, with the JLP IMV fan an item that must be activated while the crew is in the JLP. <\/p>\n<p>\u2018Since there is no smoke detection while the module is on the Node 2, the crew performs this task with their Number 1, Sniffing Equipment (nose). The fan must be deactivated when the nose is no longer present in the module.\u2019<\/p>\n<p><em><u>Kibo Incident Evaluation:<\/u><\/em>&nbsp;<\/p>\n<p>Interestingly, evaluations are being carried out on a possible \u2018unplanned recontact\u2019 between the Kibo module and Discovery\u2019s payload bay during Flight Day 4.<\/p>\n<p>\u2018The MER (Mission Evaluation Room) Manager requested the location of the video that was seen of the Japanese Module unberthing,\u2019 noted L2 Flight Day information. \u2018It appeared as though the V-guides may have had some unplanned recontact during the unberth. <\/p>\n<p><img loading=\"lazy\" decoding=\"async\" height=\"179\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/index.php?action=dlattach;topic=1415.0;attach=68183;image\" width=\"244\" align=\"left\" vspace=\"5\" border=\"0\/\"><em><font color=\"#0033ff\">**New L2 Trailer Video, with examples of L2 content&nbsp;\u2013 <\/font><font color=\"#ff0000\">TRAILER NOW AVAILABLE \u2013 CLICK IMAGE**<\/font>.<\/em><\/p>\n<p>The memo went on to note that the crew had a recording of the point of unberthing that is of interest, which was downlinked to engineers on the ground for closer evaluations.<\/p>\n<p>Activities for later in the day including the ISS airlock campout for Mike Fossum and Ron Garan, ahead of Flight Day 6\u2019s EVA-2. <\/p>\n<p>During that spacewalk, Garan and Fossum will install covers and external television equipment on the JPM and remove covers on the Japanese RMS (Remote Manipulator System), which will be deployed on Flight Day 8. The spacewalkers also will prepare for the flight day 7 move of the JLM (Japanese Logistics Module to Kibo).\u2019 <\/p>\n<p><em><u>STS-124: Middeck Experiments:<\/u><\/em><\/p>\n<p>While the main area of attention with some elements of the mass media is monotonously focused on the Russian toilet repair, other elements of the STS-124 mission usually fail to gain a mention.<\/p>\n<p>These include the middeck experiments, which are utilized on every mission, helping carry out science in the midst of a major ISS assembly flight. <\/p>\n<p><b>  <\/b><\/p>\n<p>&nbsp;<\/p>\n<p>\u2018Cell Wall and Resist Wall (CWRW):<\/p>\n<p> A pair of plant experiments utilizing the European Modular Cultivation System (EMCS) facility. <\/p>\n<p>\u2018Cell Wall will examine the genes responsible for the construction of the cell wall (rigid outermost layer) in <i>Arabidopsis thaliana <\/i>(a small plant of the mustard family) in 1g and microgravity conditions; the cell wall of plants plays a crucial role in forming supporting tissues. <\/p>\n<p>\u2018Resist Wall will examine the role of microtubule-plasma membranecell wall continuum (a collaboration between plant elements to maintain structure) pertaining to gravity resistance in <i>A. thaliana <\/i>plants; and clarify the mechanism of gravity resistance, which is an essential response for plant development against a gravitational force.<b>  <\/b><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" height=\"125\" alt=\"\" hspace=\"5\" src=\"http:\/\/content.nasaspaceflight.com\/library\/1016\/AdBanners\/ssms2007.gif\" width=\"125\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/p>\n<p>\u2018Double Coldbag:<\/p>\n<p> A passive low temperature science storage resource for transportation to\/from orbit; provides cold conditioning for samples when paired with ISS Cold Enclosure Phase Change Material Augmenting Capsules (ICEPACs).<b>  <\/b><\/p>\n<p>\u2018National Lab Pathfinder (NLP):<\/p>\n<p> Commercial payload in support of the National Lab Pathfinder effort. NLP-Vaccine-1B: pathogenetic organisms using spaceflight to develop potential vaccines for the prevention of infections on Earth.<b>  <\/b><\/p>\n<p>\u2018Short Duration Bioastronautics Investigation (SDBI): <\/p>\n<p>Integrated Immune: Validate a flight-compatible immune monitoring strategy. Sleep: Study of sleep quality\/patterns and activity and light exposure during space flight.\u2019<\/p>\n<p><font color=\"#0000ff\"><em>L2 members<\/em><\/font><em>: All documentation&nbsp;\u2013 from which the above article has quoted snippets \u2013 is available in full in the related L2 sections, updated live.<\/em><\/p>\n<p>Click here for a range of superb&nbsp;STS mission specific music videos created by Max Q videos&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>STS-124\u2019s Flight Day 5 saw several events taking place, including the changeout of a Carbon Dioxide Removal Assembly (CDRA) bed and a fix for the Russian toilet pump \u2013 both of which appear to have been successful. The highlight of the day was the hatch opening to the newly attached Kibo Module \u2013 which is [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-41392","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41392"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=41392"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41392\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=41392"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=41392"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=41392"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}