{"id":41459,"date":"2008-03-13T19:46:58","date_gmt":"2008-03-13T11:46:58","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/eva-1-and-jlp-installation-completed-endeavours-tps-cleared\/"},"modified":"2008-03-13T19:46:58","modified_gmt":"2008-03-13T11:46:58","slug":"eva-1-and-jlp-installation-completed-endeavours-tps-cleared","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/eva-1-and-jlp-installation-completed-endeavours-tps-cleared\/","title":{"rendered":"EVA-1 and JLP installation completed \u2013 Endeavour\u2019s TPS cleared"},"content":{"rendered":"<p>STS-123\u2019s EVA-1 \u2013 the opening spacewalk of the mission \u2013 has been completed, while the Shuttle Robotic Manipulator System (SRMS) arm has relocated the newly arrived JLP to Node 2, as it officially becomes part of the Station.\n<\/p>\n<p>  Engineers on the ground \u2013 who evaluated the many hundreds of Rbar Pitch Maneuver (RPM) images \u2013 have also cleared the vehicle from requiring a Focused Inspection (FI).\n<\/p>\n<p><em><img fetchpriority=\"high\" decoding=\"async\" height=\"129\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13910\" width=\"600\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/em><\/p>\n<p><em>**The most comprehensive collection&nbsp;of&nbsp;Shuttle, Ares, Orion&nbsp;and ISS&nbsp;related presentations and mission documentation, plus expansive daily processing documentation and updates&nbsp;are&nbsp;<\/em><font color=\"#0000ff\"><em>available to download&nbsp;on L2<\/em><\/font><font color=\"#0000ff\"><em>&nbsp;**<\/em><\/font><\/p>\n<p><font color=\"#ff0000\"><em><img loading=\"lazy\" decoding=\"async\" height=\"139\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=31173\" width=\"212\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/em><\/font><em><font color=\"#0033ff\">**Click&nbsp;here for sample of L2 menu and content**<\/font><\/em><\/p>\n<p><font color=\"#ff0000\" size=\"3\"><\/font><font size=\"2\"><em>**STS-123 Special:&nbsp;MOD Flight Readiness Review (FRR) Presentations, Baselines and Mission Overviews.&nbsp;<font color=\"#0000ff\"><\/font><\/em><\/font><\/p>\n<p><em>Over 35 Checklists and Handbooks, plus STS-123 Flight Plan and Detailed Mission Timeline&nbsp;Overviews.&nbsp;LIVE MMT Level Flight Day coverage (Memos, Info, Images, Videos and Presentations).<br \/><\/em><font color=\"#ff0000\" size=\"3\"><\/font><font size=\"2\"><em><br \/>**STS-123 L2 Special: Includes 16 SSP Flight Readiness Review (FRR) Presentations (1500 pages). Live FD Notes and Presentations (MMT).<br \/>**<\/em><\/font><font color=\"#ff0000\" size=\"3\"><\/font><font size=\"2\"><em>STS-124 Sub Section Build-Up.<br \/>**STS-125 Sub Section Special already over 1000mb in size.<br \/><\/em><\/font><br \/><font size=\"3\">&nbsp;<\/font><em><font color=\"#0000ff\" size=\"3\">**LIVE news updates on&nbsp;Endeavour&nbsp;STS-123 Flight Day Specific**<\/font><\/em><\/p>\n<\/p>\n<p>Aerospace &amp; Defense<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>SpaceX<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Space tourism guides<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p><font color=\"#0000ff\"><\/font><em><u>Update:<\/u><\/em><\/p>\n<p>Troubleshooting and forward plan created for the SPDM \u2018Dextre\u2019 following software patch get well failure. Presentations on L2. New article will follow in a few hours.<\/p>\n<p><em><u>TPS Evaluations:<\/u><\/em><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" height=\"169\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=43403\" width=\"215\" align=\"left\" vspace=\"5\" border=\"0\/\">RPM images, downlinked from the ISS during Flight Day 3, have been evaluated, though the Mission Management Team (MMT) were already looking at one specific area \u2013 the OMS Pods. <\/p>\n<p>\u2018Tile is damaged on Right OMS Pod x3, Tile is damaged on Left OMS Pod x1 \u2013 yellow risk, under review,\u2019 noted the MMT Flight Day 3 Debris\/TPS Tracking Matrix. \u2018Protruding Gap Filler x2, Tile Coating Loss Outboard SSME (Space Shuttle Main Engine 3.\u2019 <\/p>\n<p>However, by Flight Day 4\u2019s MMT, the TPS was all but cleared for re-entry, in one of the fastest turnarounds of an orbiter heatshield since Return To Flight modifications to the process was brought on line.<\/p>\n<p>\u2018No Focused Inspection is required! Reported the Tile looks great (as expected),\u2019 noted a MMT memo sent out on FD4. <\/p>\n<p>\u2018As far as RCC, due to a small damage area seen on the Arrowhead from the RPM photos (previous repair location) the TPS has been classified as \u2018Degraded\u2019 per the rules but the RCC folks expect to officially clear it by tomorrows (FD5) MMT.\u2019 <\/p>\n<p><img loading=\"lazy\" decoding=\"async\" height=\"186\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=43025\" width=\"227\" align=\"left\" vspace=\"5\" border=\"0\/\">Though not a concern for damage, due to the timing of the event, the T+10 second event \u2013 first revealed by this site \u2013 has been cleared from being an impact on the orbiter. Though it is still not know what the object is, video of the incident has been evaluated to show it passed behind the shuttle during early ascent. <\/p>\n<p>\u2018Single piece of light colored debris observed forward of launch vehicle, travelling aft. The debris does not appear to originate from the vehicle. Originally this debris was thought to possibly impact the Orbiter nose near jet F3F at the same time as Tyvek cover F2F releases,\u2019 noted MMT information. <\/p>\n<p>\u2018Upon further analysis, believes the object passes behind the Port SRB and does not come near the Orbiter. MSFC (Marshall Space Flight Center) also believes the object does not impact the Orbiter. Assessments from other ground cameras (including film) are in work.\u2019<\/p>\n<p><b><i><u>STS-123 Latest:<\/u><\/i><\/b> <\/p>\n<p>The mission is proceeding smoothly, with only two new issues being evaluated by shuttle engineers \u2013 one of which being an expected condition with no further work required. <\/p>\n<p>\u2018APU 3 (Auxiliary Power United) Seal Cavity Decay: IFA (In Flight Anomaly) from STS-118. Small leak in APU 3 drain line is an expected condition for this flight,\u2019 noted orbiter information on Thursday, before noting the Trajectory Control System (TCS) had an issue during docking, and may require monitoring during undocking.<\/p>\n<p>\u2018TCS Laser Dropped Lock: During the manual phase of the rendezvous, the Trajectory Control Sensor (TCS) Continuous Wave (CW) laser dropped lock on the target. This caused loss of TCS data for the RPM and TORVA initiation. <\/p>\n<p>\u2018The manual acquisition procedure was used to reacquire lock. At this time it is not known if this is expected to occur during undock and fly around.\u2019<\/p>\n<p>The SSPTS (Station-to-Shuttle Power Transfer System) has been activated, which will allow for refined consumables status. Currently, those figures are showing positive margins, with \u20181 day 10 hrs (non-SSPTS power levels) \u2013 L\/O margins 1 day 8 hrs. 2 days 14 hrs (SSPTS power levels) \u2013 L\/O margins 2 days 7 hrs \u2013 O2 Limited,\u2019 above the 16+1+2 limitations.<\/p>\n<p>EVA-1 has been completed \u2013 lasting seven hours and a one minute.<em><\/em><\/p>\n<p>The major objectives completed included preparing for JLP unberthing in cargo bay; installing OTCM2 with the Node-2 PDGF-based SSRMS, removing and installing OTCM1 (with SSRMS); prepararing for SPDM assembly, leaving thermal covers intact; (5) cleanup and ingress.<\/p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>STS-123\u2019s EVA-1 \u2013 the opening spacewalk of the mission \u2013 has been completed, while the Shuttle Robotic Manipulator System (SRMS) arm has relocated the newly arrived JLP to Node 2, as it officially becomes part of the Station. Engineers on the ground \u2013 who evaluated the many hundreds of Rbar Pitch Maneuver (RPM) images \u2013 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-41459","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41459"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=41459"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41459\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=41459"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=41459"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=41459"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}