{"id":41461,"date":"2008-03-11T17:53:52","date_gmt":"2008-03-11T09:53:52","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/sts-123-houston-checking-into-strange-ascent-debris-incident\/"},"modified":"2008-03-11T17:53:52","modified_gmt":"2008-03-11T09:53:52","slug":"sts-123-houston-checking-into-strange-ascent-debris-incident","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/sts-123-houston-checking-into-strange-ascent-debris-incident\/","title":{"rendered":"STS-123: Houston checking into strange ascent debris incident"},"content":{"rendered":"<p>Endeavour appears to have enjoyed a relatively clean ride uphill during the early hours of Tuesday, though evaluations are taking place on several debris events \u2013 most of which are classed as nominal.\n<\/p>\n<p>  However, as STS-123 concludes inspections on Flight Day 2, video and images of what appears to be a debris strike to Endeavour\u2019s nose \u2013 possibly a bird strike \u2013 are gaining the most attention. Evaluations are still taking place to confirm if there was an impact or not.\n<\/p>\n<p><em><img fetchpriority=\"high\" decoding=\"async\" height=\"129\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13910\" width=\"600\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/em><\/p>\n<p><em>**The most comprehensive collection&nbsp;of&nbsp;Shuttle, Ares, Orion&nbsp;and ISS&nbsp;related presentations and mission documentation, plus expansive daily processing documentation and updates&nbsp;are&nbsp;<\/em><font color=\"#0000ff\"><em>available to download&nbsp;on L2<\/em><\/font><font color=\"#0000ff\"><em>&nbsp;**<\/em><\/font><\/p>\n<p><font color=\"#ff0000\"><em><img loading=\"lazy\" decoding=\"async\" height=\"139\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=31173\" width=\"212\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/em><\/font><em><font color=\"#0033ff\">**Click&nbsp;here for sample of L2 menu and content**<\/font><\/em><\/p>\n<p><font color=\"#ff0000\" size=\"3\"><\/font><font size=\"2\"><em>**STS-123 Special:&nbsp;MOD Flight Readiness Review (FRR) Presentations, Baselines and Mission Overviews.&nbsp;<font color=\"#0000ff\"><\/font><\/em><\/font><\/p>\n<p><em>Over 35 Checklists and Handbooks, plus STS-123 Flight Plan and Detailed Mission Timeline&nbsp;Overviews.&nbsp;LIVE MMT Level Flight Day coverage (Memos, Info, Images, Videos and Presentations).<\/em><\/p>\n<p><font color=\"#ff0000\" size=\"3\"><\/font><font size=\"2\"><em>**STS-122 MMT Level now into post flight IFA Reviews. <br \/>**STS-123 L2 Special: Now includes 16 SSP Flight Readiness Review (FRR) Presentations (1500 pages).<br \/>**<\/em><\/font><font color=\"#ff0000\" size=\"3\"><\/font><font size=\"2\"><em>STS-124 Sub Section Build-Up.<br \/>**STS-125 Sub Section Special already over 1000mb in size.<br \/><\/em><\/font><br \/><font size=\"3\">&nbsp;<\/font><em><font color=\"#0000ff\" size=\"3\">**LIVE news updates on&nbsp;Endeavour&nbsp;STS-123 Flight Day Specific**<\/font><\/em><\/p>\n<\/p>\n<p>Rocket launch schedules<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>SpaceX<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>SpaceX launch tickets<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p><em><u><font color=\"#0000ff\"><\/font><\/u><\/em><br \/><em><u>STS-123 Latest:<\/u><\/em><\/p>\n<p>Given it is very early in the DAT (Debris Analysis Team) evaluations on the ascent imagery, the observed debris has not yet been identified. <\/p>\n<p><img loading=\"lazy\" decoding=\"async\" height=\"186\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=43025\" width=\"227\" align=\"left\" vspace=\"5\" border=\"0\/\">The event, early into the ascent of Endeavour (T+10 seconds), shows the debris classed as \u2018not from the vehicle\u2019 moving down the stack in slowed down video of the incident. <\/p>\n<p>It appears to impact the Forward Reaction Control System (RCS), from which it appears to knock loose one of the Tyvek covers. Neither can be confirmed at this stage.<\/p>\n<p>However, that could be coincidental, given the covers are designed to liberate during this early stage of the ride uphill. It is also highly unlikely that the impact at the velocity Endeavour would have been travelling could have caused any damage.<\/p>\n<p>\u2018Single piece of light colored debris (does not appear to originate from the vehicle) falls aft along ET and appears to contact Orbiter nose near F3F RCS thruster,\u2019 noted the DAT team in a memo associated with the debris. \u2018Have not observed debris or contact in other camera views. Will be reviewed further.\u2019<\/p>\n<p>Flight Director Mike Moses noted that evaluations were still ongoing by the end of Flight Day 2, and that they are still not sure what exactly the debris was.<\/p>\n<p>However, he did stress that at T+10 seconds the velocity would not be enough to result in a damaging impact.<\/p>\n<p>Also seen in the early imagery, acquired by L2 during Tuesday morning, are a handful of usual debris events, most of which are classed as \u2018nominal\u2019 at this stage of evaluation. <\/p>\n<p>\u2018Tile coating loss noted outboard of SSME (Space Shuttle Main Engine) number 3 dome mounted heat shield,\u2019 noted the data acquired so far, in order of T+ times, with the debris in question seen falling to the right of the vehicle during ignition. <\/p>\n<p>Also classed as ignition debris events, several pieces of material are seen as the vehicle is lifting off the pad. <\/p>\n<p><img loading=\"lazy\" decoding=\"async\" height=\"143\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=43028\" width=\"225\" align=\"left\" vspace=\"5\" border=\"0\/\">\u2018Ice (observed) falls along FSS (Fixed Service Structure) during GH2 Vent Arm Retract (T+2 seconds),\u2019 noted DAT, with unclassified debris also seen in the same image at T+1.8 seconds. \u2018Multiple pieces of debris seen at lift-off.\u2019 <\/p>\n<p>Interestingly, only one debris event has been observed during first stage, clocked at T+83 seconds. This relates to a \u2018nominal\u2019 debris event which misses the starboard wing. It has not yet been evaluated as to how large that piece of debris was, or where it originated. <\/p>\n<p>More findings are likely to follow, though the opening data points to a very clean ascent by Endeavour, to be confirmed by Flight Day 2\u2019s inspections \u2013 and Flight Day 3\u2019s RPM below the International Space Station.<\/p>\n<p>\u2018No major on orbit issues being tracked at this time,\u2019 noted information during second shift, Tuesday. <\/p>\n<p>The couple of issues with Endeavour\u2019s systems during ascent \u2013 notably with the Flash Evaporator System (FES) and three RCS (Reaction Control System) thrusters \u2013 all hold no mission impacts <\/p>\n<p>\u2018The flash evaporator cooling system switched to its backup side. This issue has been noted on previous launches and should be no impact to the mission. The cooling system worked, albeit with less redundancy,\u2019 noted information during Flight Day 1. <\/p>\n<p>\u2018Troubleshooting will be performed after payload bay doors are opened in hopes of restoring the primary system for later use.<\/p>\n<p>\u2018At T+3 sec, the L2L, L2U, and L2D fuel injector temps exponentially decayed in less than 20 sec from around 80 degF to (-1) degF. Suspect failure of DSC (digital signal conditioner) OL1 Card 1, caused the loss of instrumentation data. <\/p>\n<p>\u2018The thrusters have been deselected for the mission given the loss of insight by this DSC, but should be no impact to mission as other thrusters are available. <\/p>\n<p>\u2018APU (Auxiliary Power Unit) 1 gas generator chamber pressure transducer saw a shift from 28 psi to 128 psi and then became erratic at about 14 seconds prior to MECO. This issue is believed to be instrumentation only.\u2019 <\/p>\n<p>Planned Flight Day 2 activities include inspections of the Thermal Protection System (TPS) survey via the OBSS (Orbiter Boom Sensor System) \u2013 which is to enjoy an interesting couple of months, when it is stowed on the ISS until the arrival of Discovery on STS-124 in May.<\/p>\n<p>Extravehicular Mobility Unit checkout, Centerline camera installation, Orbiter Docking System ring extension, Orbital Maneuvering System pod survey and Rendezvous tools checkout will also be part of FD-2.<\/p>\n<p>These tasks have been completed, ahead of docking with the ISS on Flight Day 3.<\/p>\n<p>Play by play coverage on the live pages \u2013 linked at the top of the article.<\/p>\n<p><font color=\"#0000ff\"><em>L2 members<\/em><\/font><em>: All documentation&nbsp;\u2013 from which the above article has quoted snippets \u2013 is available in full in the related L2 sections, updated live.<\/em><\/p>\n<p><font color=\"#0000ff\"><\/font><font size=\"+0\"><\/font><font face=\"Times New Roman\" color=\"#0000ff\" size=\"2\"><em>Click here for MaxQ\u2019s Stunning Apollo I\/Challenger\/Columbia&nbsp;Tribute&nbsp;Video \u2018New Days Will Rise\u2019.<\/em><\/font><\/p>\n<p><em><font face=\"Times New Roman\" size=\"2\">**STARLIGHT: STS-117 MISSION&nbsp;REVIEW&nbsp;MUSIC&nbsp;VIDEO**<\/font><\/em><em><font face=\"Times New Roman\" size=\"2\">&nbsp;\u2013 STS-118, STS-120&nbsp;and STS-122 Mission review video also available.<\/font><\/em><font size=\"+0\"><\/font><font face=\"Times New Roman\"><\/font><font size=\"2\"><em>&nbsp;<\/em><\/font><\/p>\n<p><font color=\"#ff0000\">**ROCK YOU LIKE A HURRICANE: STS-117 MISSION&nbsp;REVIEW&nbsp;MUSIC&nbsp;VIDEO \u2013 AS SEEN BY THE STS-117 CREW!!**<\/font>&nbsp;-.<br \/><font size=\"1\">(<em>Video section is FREE, but you need to sign up as a member of the forum to enter the video section of the site. We only use your e-mail to send you your password. It will not be used for spam etc.)<\/em><\/font><em><\/em><em><font size=\"2\"><\/font><\/em><\/p>\n<p><!-- Full Story End --><!-- end center --><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Endeavour appears to have enjoyed a relatively clean ride uphill during the early hours of Tuesday, though evaluations are taking place on several debris events \u2013 most of which are classed as nominal. However, as STS-123 concludes inspections on Flight Day 2, video and images of what appears to be a debris strike to Endeavour\u2019s [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-41461","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41461"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=41461"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41461\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=41461"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=41461"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=41461"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}