{"id":41464,"date":"2008-03-08T20:23:10","date_gmt":"2008-03-08T12:23:10","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/sts-123-countdown-begins-quick-shoe-mount-concern-debated\/"},"modified":"2008-03-08T20:23:10","modified_gmt":"2008-03-08T12:23:10","slug":"sts-123-countdown-begins-quick-shoe-mount-concern-debated","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/sts-123-countdown-begins-quick-shoe-mount-concern-debated\/","title":{"rendered":"STS-123 countdown begins \u2013 quick-shoe mount concern debated"},"content":{"rendered":"<p>STS-123\u2019s countdown for Tuesday morning\u2019s opening launch attempt has begun, with no major issues being worked on the shuttle \u2013 though a concern relating to a quick-shoe mount has been discussed.\n<\/p>\n<p>  With the UHF radio problem cleared to fly as-is, and the weather forecasted as favorable, Endeavour now heads into the complex ballet of pre-launch operations, which will hopefully conclude with her launch at 2:28 am on Tuesday.\n<\/p>\n<p><em><img fetchpriority=\"high\" decoding=\"async\" height=\"129\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13910\" width=\"600\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/em><\/p>\n<p><em>**The most comprehensive collection&nbsp;of&nbsp;Shuttle, Ares, Orion&nbsp;and ISS&nbsp;related presentations and mission documentation, plus expansive daily processing documentation and updates&nbsp;are&nbsp;<\/em><font color=\"#0000ff\"><em>available to download&nbsp;on L2<\/em><\/font><font color=\"#0000ff\"><em>&nbsp;**<\/em><\/font><\/p>\n<p><font color=\"#ff0000\"><em><img loading=\"lazy\" decoding=\"async\" height=\"139\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=31173\" width=\"212\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/em><\/font><em><font color=\"#0033ff\">**Click&nbsp;here for sample of L2 menu and content**<\/font><\/em><\/p>\n<p><font color=\"#ff0000\" size=\"3\"><\/font><font size=\"2\"><em>**STS-123 Special:&nbsp;MOD Flight Readiness Review (FRR) Presentations, Baselines and Mission Overviews.&nbsp;<font color=\"#0000ff\"><\/font><\/em><\/font><\/p>\n<p><em>Over 35 Checklists and Handbooks, plus STS-123 Flight Plan and Detailed Mission Timeline&nbsp;Overviews.&nbsp;<\/em><\/p>\n<p><font color=\"#ff0000\" size=\"3\"><\/font><font size=\"2\"><em>**STS-122 MMT Level now into post flight IFA Reviews. <br \/>**STS-123 L2 Special: Now includes 16 SSP Flight Readiness Review (FRR) Presentations (1500 pages).<br \/>**<\/em><\/font><font color=\"#ff0000\" size=\"3\"><\/font><font size=\"2\"><em>STS-124 Sub Section Build-Up.<br \/>**STS-125 Sub Section Special already over 1000mb in size.<br \/><\/em><\/font><br \/><font size=\"3\">&nbsp;<\/font><em><font color=\"#0000ff\" size=\"3\">**LIVE news updates on&nbsp;Endeavour&nbsp;STS-123 PAD FLOW**<\/font><\/em><\/p>\n<p><font color=\"#0000ff\"><em>**LIVE updates on Atlantis&nbsp;STS-125 Processing Flow and STS-122 Post Flight**<\/em><\/font><\/p>\n<p>Spaceflight news subscription<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Spaceflight<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Spaceflight history books<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p><font color=\"#0000ff\"><em>**LIVE updates on Discovery STS-124 Processing**<\/em><\/font><\/p>\n<\/p>\n<p><em><u><br \/>STS-123: UHF Radio:<\/u><\/em><\/p>\n<p>At the noon board meeting on Friday, shuttle managers requested a better understanding of the UHF radio issue \u2013 specifically ensuring they had capability for scenarios such as communication with launch abort sites \u2013 prior to approving the system to fly as-is. <\/p>\n<p>While not an LCC (Launch Commit Criteria) breach in its current state, a full understanding of its ability during powered flight and the latter part of re-entry was required. <\/p>\n<p>As previously noted, the radio has a level of functionality, in low power mode. The fault occurs when operated in high power mode, despite the replacement of certain elements of the radio system via donations from Atlantis. <\/p>\n<p>\u2018MOD is GO for launch with UHF in Low Power. Nominally UHF is available through powered flight and is picked up during Entry at about Mach 9 (around 15 minutes prior to touchdown). UHF is required for TAL and ECAL Aborts,\u2019 noted one of two expansive presentations on the issue.<\/p>\n<p>\u2018During an abort, crew uses UHF to speak directly with airport tower personnel for runway and weather information. UHF is also required for dissimilar redundancy to S-Band system.<\/p>\n<p>\u2018If the UHF system fails pre-launch, MOD would be NO-GO for launch per the LCC (CT-05).\u2019<\/p>\n<p>The presentations also outlined how the problem was found, which led to issue being elevated from the Engineering Review Board (ERB) to the Leroy Cain led Noon Board.<\/p>\n<p>\u2018The UHF ATC transceiver was being tested on single bus power. COM checks on main C followed by main A were successful with the power amp (PA) off and measured transmit power was (-)83 dBm.\u2019<\/p>\n<p>\u2018The next test was on main A with the power amp on. The radio experienced a complete shutdown and IPR (Interim Problem Report) was initiated. Troubleshooting then removed all power and repeated the single bus power amp off com checks. The main C and main A checks were good on both simplex frequencies.<\/p>\n<p>\u2018With main A on and main C off, the power amp switch was turned on and a one-way uplink voice check from the C&amp;T station was good. The orbiter transmitter was keyed and again the radio shutdown.\u2019<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" height=\"184\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=42497\" width=\"248\" align=\"left\" vspace=\"5\" border=\"0\/\">Clearing the system to fly in its current state was delayed until Friday, due to additional data being required on the system\u2019s ability during launch aborts. <\/p>\n<p>This saw data being presented to managers, where communications were initiated in all relevant scenarios via flight history \u2013 simulated with the radio in low power mode \u2013 on the Dynamic Environment Communications Analysis Testbed (DECAT). <\/p>\n<p>DECAT, is an in-house developed simulation tool, used to analyze dynamic communications coverage and link performance based on vehicle trajectory and attitude and the relative geometries, which proved that there was still enough power&nbsp;for communications to be made via the orbiter and required ground stations and abort sites. <\/p>\n<p>Had the results been negative for flying as-is, a back-up plan was in place, which would have&nbsp;involved Discovery\u2019s UHF radio being donated for Endeavour. While the re-test would have only taken four hours, access to Discovery\u2019s radio would have taken a fair amount longer.<\/p>\n<p>\u2018Cannibalization of the OV-103 (Discovery)&nbsp;UHF radio. AV-Bay 3A access is required and there could be an impact to the flight crew equipment stowage. Retest requires 4 hours. A test was performed today on OV-103 which verified full operation of its radio.\u2019<\/p>\n<p>However, now the radio has been cleared for flight, this plan is no longer required.<\/p>\n<p><b><i><u>  <\/u><\/i><\/b><\/p>\n<p>PRCB Evaluations of Quick-Shoe Mount:<\/p>\n<\/p>\n<p>The next major meeting of shuttle managers will take place at the L-2 MMT (Mission Management Team) meeting, with one additional item of interest likely to be further evaluated.<\/p>\n<p>That relates to a discussion started by the all-powerful Program Requirements Control Board (PRCB) on Thursday, which saw a large presentation being made on a potential problem with a \u2018quick-shoe mount\u2019 in the crew module that has a \u2018remote\u2019 risk of causing a breach in the canopy\u2019s skin.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" height=\"189\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=42496\" width=\"280\" align=\"left\" vspace=\"5\" border=\"0\/\">The mount \u2013 and attached Bogen Bracket and Arm \u2013 will hold a Payload and General Support Computer (PGSC) in place on the flight deck, and it has been recommended that the mount, which \u2018shows negative margins due to crew induced moment loads imparted by the Bogen Bracket attached to the Quick-shoe,\u2019 should be relocated.<\/p>\n<p>\u2018The stress community does not know the failure mode or hole size generated should the skin fail,\u2019 noted the PRCB presentation, citing the worst case scenario being \u2018External Leakage Of The Crew Module\/ODS Resulting In Loss Of Habitable Environment: Catastrophic Severity.\u2019 <\/p>\n<p>Given the findings are technically an increase in risk to the vehicle and crew for STS-123 \u2013 ranging up to the worst case scenario of LOVC (Loss Of Vehicle and Crew) \u2013 a waiver may be required for this mission.<\/p>\n<p>More importantly, now that the potential issue has been spotted, options and mitigation efforts have been presented ahead of launch.<\/p>\n<p>\u2018(1) Accept Risk and Fly-As-Is: Recommend STS-123 Crew use minimum torque to tighten Bogen Arm to lessen the likelihood of imparting moment load on the Quick-shoe. Approve flight waiver,\u2019 listed the options. <\/p>\n<p><img loading=\"lazy\" decoding=\"async\" height=\"182\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=42498\" width=\"284\" align=\"left\" vspace=\"5\" border=\"0\/\">\u2018(2) Clamp the PGSC Desk to the R13 panel per backup plan. <\/p>\n<p>\u2018(3) Use Loc-Line Bracket in place of Bogen Bracket: Preliminary information suggests that the force required to impart a moment is 10 times less (13 in-lbs assumes 18 inch moment arm) than the Bogen Bracket.\u2019 <\/p>\n<p>The recommendation to relocate the Quick-shoe bracket was supported by the majority of departments involved in the discussion. <\/p>\n<p>\u2018Crew Systems, Safety, CM Structures, and OPO (Orbiter Project Office) recommend Option 2 and to remove Quick-shoe from mounting plate. Relocate Quick-shoe to non primary structure for future flights.<\/p>\n<p>\u2018Crew Office recommends Option 1: Level 2 Loads Panel does not support a waiver: Waiver rationale and current margins should be provided for further discussion.\u2019 The Crew Office cited the relocation as \u2018different from crew\u00e2\u20ac\u2122s trained baseline, adding Panel R13 must be accessible.<\/p>\n<p>This article will be updated when further information on the quick-shoe evaluations are available.<\/p>\n<p><font color=\"#0000ff\"><em>L2 members<\/em><\/font><em>: All documentation&nbsp;\u2013 from which the above article has quoted snippets \u2013 is available in full in the related L2 sections, updated live.<\/em><\/p>\n<\/p>\n<p><font color=\"#0000ff\"><\/font><font face=\"Arial\"><\/font><font color=\"#0000ff\" size=\"2\"><em>Click here for MaxQ\u2019s Stunning Apollo I\/Challenger\/Columbia&nbsp;Tribute&nbsp;Video \u2018New Days Will Rise\u2019.<\/em><\/font><\/p>\n<p><em><font face=\"Arial\" size=\"2\">**STARLIGHT: STS-117 MISSION&nbsp;REVIEW&nbsp;MUSIC&nbsp;VIDEO**<\/font><\/em><em><font face=\"Arial\" size=\"2\">&nbsp;\u2013 STS-118, STS-120&nbsp;and STS-122 Mission review video also available.<\/font><\/em><font face=\"Arial\"><\/font><font size=\"2\"><em>&nbsp;<\/em><\/font><\/p>\n<p><font color=\"#ff0000\">**ROCK YOU LIKE A HURRICANE: STS-117 MISSION&nbsp;REVIEW&nbsp;MUSIC&nbsp;VIDEO \u2013 AS SEEN BY THE STS-117 CREW!!**<\/font>&nbsp;-.<br \/><font size=\"1\">(<em>Video section is FREE, but you need to sign up as a member of the forum to enter the video section of the site. We only use your e-mail to send you your password. It will not be used for spam etc.)<\/em><\/font><em><\/em><em><font size=\"2\"><\/font><\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>STS-123\u2019s countdown for Tuesday morning\u2019s opening launch attempt has begun, with no major issues being worked on the shuttle \u2013 though a concern relating to a quick-shoe mount has been discussed. With the UHF radio problem cleared to fly as-is, and the weather forecasted as favorable, Endeavour now heads into the complex ballet of pre-launch [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-41464","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41464"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=41464"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41464\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=41464"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=41464"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=41464"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}