{"id":41466,"date":"2008-03-06T22:27:02","date_gmt":"2008-03-06T14:27:02","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/endeavours-uhf-radio-fails-re-test-no-decision-on-forward-plan\/"},"modified":"2008-03-06T22:27:02","modified_gmt":"2008-03-06T14:27:02","slug":"endeavours-uhf-radio-fails-re-test-no-decision-on-forward-plan","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/endeavours-uhf-radio-fails-re-test-no-decision-on-forward-plan\/","title":{"rendered":"Endeavour\u2019s UHF radio fails re-test \u2013 no decision on forward plan"},"content":{"rendered":"<p>Endeavour\u2019s problematic UHF radio \u2013 which underwent replacement via parts donated from Atlantis at the weekend \u2013 has failed a re-test.\n<\/p>\n<p>  The Engineering Review Board (ERB) has recommended to fly as-is, though that still required approval by the Noon Board meeting, which concluded at around 4pm local time \u2013 with no decision taken. They will meet again on Friday morning.\n<\/p>\n<p><em><img fetchpriority=\"high\" decoding=\"async\" height=\"129\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13910\" width=\"600\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/em><\/p>\n<p><em>**The most comprehensive collection&nbsp;of&nbsp;Shuttle, Ares, Orion&nbsp;and ISS&nbsp;related presentations and mission documentation, plus expansive daily processing documentation and updates&nbsp;are&nbsp;<\/em><font color=\"#0000ff\"><em>available to download&nbsp;on L2<\/em><\/font><font color=\"#0000ff\"><em>&nbsp;**<\/em><\/font><\/p>\n<p><font color=\"#ff0000\"><em><img loading=\"lazy\" decoding=\"async\" height=\"139\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=31173\" width=\"212\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/em><\/font><em><font color=\"#0033ff\">**Click&nbsp;here for sample of L2 menu and content**<\/font><\/em><\/p>\n<p><font color=\"#ff0000\" size=\"3\"><\/font><font size=\"2\"><em>**STS-123 Special:&nbsp;MOD Flight Readiness Review (FRR) Presentations, Baselines and Mission Overviews.&nbsp;<font color=\"#0000ff\"><\/font><\/em><\/font><\/p>\n<p><em>Over 35 Checklists and Handbooks, plus STS-123 Flight Plan and Detailed Mission Timeline&nbsp;Overviews.&nbsp;<\/em><\/p>\n<p><font color=\"#ff0000\" size=\"3\"><\/font><font size=\"2\"><em>**STS-122 MMT Level now into post flight IFA Reviews. <br \/>**STS-123 L2 Special: Now includes 16 SSP Flight Readiness Review (FRR) Presentations (1500 pages).<br \/>**<\/em><\/font><font color=\"#ff0000\" size=\"3\"><\/font><font size=\"2\"><em>STS-124 Sub Section Build-Up.<br \/>**STS-125 Sub Section Special already over 1000mb in size.<br \/><\/em><\/font><br \/><font size=\"3\">&nbsp;<\/font><em><font color=\"#0000ff\" size=\"3\">**LIVE news updates on&nbsp;Endeavour&nbsp;STS-123 PAD FLOW**<\/font><\/em><\/p>\n<p><font color=\"#0000ff\"><em>**LIVE updates on Atlantis&nbsp;STS-125 Processing Flow and STS-122 Post Flight**<\/em><\/font><\/p>\n<p>SpaceX launch tickets<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Spaceflight<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>NASA educational resources<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p><font color=\"#0000ff\"><em>**LIVE updates on Discovery STS-124 Processing**<\/em><\/font><\/p>\n<\/p>\n<p><em><u><br \/>STS-123 Pad Processing Latest:<\/u><\/em><\/p>\n<p>The issue with Endeavour\u2019s UHF radio was noted last week, calling for parts of the system to be replaced via parts \u2013 specifically the transceiver \u2013 from Atlantis, as a solution for the upcoming mission.<\/p>\n<p>Re-testing was carried out yesterday, before the pad was closed for the opening pressurization work on the Hyper\/MPS systems. However, the radio is still not working in \u2018high power\u2019 mode.<\/p>\n<p>\u2018The replacement UHF radio failed retest yesterday. Specifically, the UHF radio could not be operated in \u2018high power\u2019 mode; the radio functioned normally in the \u2018low power\u2019 setting,\u2019 noted L2 processing information on Thursday morning.&nbsp;<\/p>\n<p>\u2018The team will discuss the test results and further disposition at an ERB (Engineering Review&nbsp;Board)&nbsp;meeting&nbsp;planned for today.\u2019<\/p>\n<p>Options will include further work, or fly as-is \u2013 depending on Flight Rules. It is not a constraint to entering S0007 at present.<\/p>\n<p>Following the approval to fly as-is by the ERB, the Noon Board \u2013 chaired by Leroy Cain \u2013 began their meeting at 3pm local time, where a final decision on a forward plan was discussed.<\/p>\n<p>The meeting concluded without deciding a forward plan, and will meet again on Friday.<\/p>\n<p>Meanwhile, the shuttle is also undergoing Hyper\/MPS (Main Propulsion System) pressurization \u2013 which will require an element of troubleshooting via the replacement of a solenoid valve at the pad today. Final pressurization activities are still expected to be completed by Friday.<\/p>\n<p>One IPR (Interim Problem Report) has been noted during initial pressurization, which requires the removal and replacement of a solenoid valve at the pad today. This is not deemed to be a problem for completing pressurization activities.<\/p>\n<p>\u2018Hypergolic\/MPS pressurization for flight picked up yesterday. 1st stage press is expected to be complete at about 0630 \u2013 0700; final press is scheduled for Friday 3rd shift,\u2019 added Thursday\u2019s processing report. <\/p>\n<p>\u2018Picked up an IPR during initial pressurization. The GHe load\/vent sequencer caused a momentary pressure to be exceeded on the RRCS (Right Reaction Control System) fuel He (Helium) tank of 3189 psig; should have been no more than 3176 psig.<\/p>\n<p>\u2018The pressure overshoot was due to a solenoid valve (L8) which was slow to close when commanded. The constraint is to final pressurization (op 225-3). The plan is to R&amp;R the valve on the 107 foot level and perform a retest today. <\/p>\n<p>\u2018This should not be a constraint to picking up with final pressurization as scheduled tomorrow on 3rd shift.\u2019<font face=\"Arial\" size=\"2\"><\/font><\/p>\n<p>In other pad flow news, airlock closeout was completed on Wednesday, as orbiter aft closeouts continue ahead of the upcoming Call-To-Stations (CTS) for the start of the S0007 Launch Countdown activities. Installation of the 50-1&amp;2 doors and aft confidence test are scheduled for Friday.<\/p>\n<p><font color=\"#0000ff\"><em>L2 members<\/em><\/font><em>: All documentation&nbsp;\u2013 from which the above article has quoted snippets \u2013 is available in full in the related L2 sections, updated live.<\/em><\/p>\n<\/p>\n<p><font color=\"#0000ff\"><\/font><font face=\"Arial\"><\/font><font color=\"#0000ff\" size=\"2\"><em>Click here for MaxQ\u2019s Stunning Apollo I\/Challenger\/Columbia&nbsp;Tribute&nbsp;Video \u2018New Days Will Rise\u2019.<\/em><\/font><\/p>\n<p><em><font face=\"Arial\" size=\"2\">**STARLIGHT: STS-117 MISSION&nbsp;REVIEW&nbsp;MUSIC&nbsp;VIDEO**<\/font><\/em><em><font face=\"Arial\" size=\"2\">&nbsp;\u2013 STS-118, STS-120&nbsp;and STS-122 Mission review video also available.<\/font><\/em><font face=\"Arial\"><\/font><font size=\"2\"><em>&nbsp;<\/em><\/font><\/p>\n<p><font color=\"#ff0000\">**ROCK YOU LIKE A HURRICANE: STS-117 MISSION&nbsp;REVIEW&nbsp;MUSIC&nbsp;VIDEO \u2013 AS SEEN BY THE STS-117 CREW!!**<\/font>&nbsp;-.<br \/><font size=\"1\">(<em>Video section is FREE, but you need to sign up as a member of the forum to enter the video section of the site. We only use your e-mail to send you your password. It will not be used for spam etc.)<\/em><\/font><em><\/em><em><font size=\"2\"><\/font><\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Endeavour\u2019s problematic UHF radio \u2013 which underwent replacement via parts donated from Atlantis at the weekend \u2013 has failed a re-test. The Engineering Review Board (ERB) has recommended to fly as-is, though that still required approval by the Noon Board meeting, which concluded at around 4pm local time \u2013 with no decision taken. They will [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-41466","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41466"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=41466"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41466\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=41466"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=41466"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=41466"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}