{"id":41470,"date":"2008-03-01T01:12:00","date_gmt":"2008-02-29T17:12:00","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/busy-weekend-as-endeavour-undergoes-minor-troubleshooting\/"},"modified":"2008-03-01T01:12:00","modified_gmt":"2008-02-29T17:12:00","slug":"busy-weekend-as-endeavour-undergoes-minor-troubleshooting","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/busy-weekend-as-endeavour-undergoes-minor-troubleshooting\/","title":{"rendered":"Busy weekend as Endeavour undergoes minor troubleshooting"},"content":{"rendered":"<p>A few issues are being worked on the STS-123 stack, as Endeavour edges ever closer to her opening launch attempt on March 11.\n<\/p>\n<p>  The main focus of attention relates to troubleshooting a problem with the orbiter\u2019s UHF radio, along with evaluations regarding the possible requirement of thermography inspections on a suspect Solid Rocket Booster (SRB) factory joint debond issue.\n<\/p>\n<p><em><img fetchpriority=\"high\" decoding=\"async\" height=\"129\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13910\" width=\"600\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/em><\/p>\n<p><em>**The most comprehensive collection&nbsp;of&nbsp;Shuttle, Ares, Orion&nbsp;and ISS&nbsp;related presentations and mission documentation, plus expansive daily processing documentation and updates&nbsp;are&nbsp;<\/em><font color=\"#0000ff\"><em>available to download&nbsp;on L2<\/em><\/font><font color=\"#0000ff\"><em>&nbsp;**<\/em><\/font><\/p>\n<p><font color=\"#ff0000\"><em><img loading=\"lazy\" decoding=\"async\" height=\"139\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=31173\" width=\"212\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/em><\/font><em><font color=\"#0033ff\">**Click&nbsp;here for sample of L2 menu and content**<\/font><\/em><\/p>\n<p><font color=\"#ff0000\" size=\"3\"><\/font><font size=\"2\"><em>**STS-123 Special:&nbsp;MOD Flight Readiness Review (FRR) Presentations, Baselines and Mission Overviews.&nbsp;<font color=\"#0000ff\"><\/font><\/em><\/font><\/p>\n<p><em>Over 30 Checklists and Handbooks, plus STS-123 Flight Plan and Detailed Mission Timeline&nbsp;Overviews.&nbsp;<\/em><\/p>\n<p><font color=\"#ff0000\" size=\"3\"><\/font><font size=\"2\"><em>**STS-122 MMT Level now into post flight IFA Reviews. <br \/>**STS-123 L2 Special Build-up in full swing. <br \/>**<\/em><\/font><font color=\"#ff0000\" size=\"3\"><\/font><font size=\"2\"><em>STS-124 Sub Section Build-Up.<br \/>**STS-125 Sub Section Special already over 1000mb in size.<br \/><\/em><\/font><br \/><font size=\"3\">&nbsp;<\/font><em><font color=\"#0000ff\" size=\"3\">**LIVE news updates on&nbsp;Endeavour&nbsp;STS-123 PAD FLOW**<\/font><\/em><\/p>\n<p><font color=\"#0000ff\"><em>**LIVE updates on Atlantis&nbsp;STS-125 Processing Flow and STS-122 Post Flight**<\/em><\/font><\/p>\n<p>Company News<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Rocket building kits<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>SpaceX<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p><font color=\"#0000ff\"><em>**LIVE updates on Discovery STS-124 Processing**<\/em><\/font><\/p>\n<\/p>\n<p><em><u>STS-123 Pad Processing Latest:<\/u><\/em><\/p>\n<p>As expected, the Flight Readiness Review (FRR) approved continuation towards the March 11 launch attempt, in a meeting that lasted little over a day \u2013 a sign of the absence of any major issues with the pad flow for STS-123. <\/p>\n<p>At Launch Pad 39A, Endeavour has been put through S0024 (pre-launch propellant servicing) procedures, which has included the completion of FRCS (Forward Reaction Control System), RCS and OMS propellant loading.<\/p>\n<p>\u2018FRCS oxidizer propellant tank load complete,\u2019 noted Friday processing information. \u2018Left and Right OMS oxidizer propellant tank load complete. Left and Right RCS oxidizer propellant tank load complete. <\/p>\n<p>\u2018Aft Propulsion System oxidizer crossfeed valve is configured. Fuel flow to RSS (Rotating Service Structure) complete. FRCS fuel propellant tank load, system purge and QD leak check complete. ROMS\/LOMS fuel propellant tank load complete. Right RCS fuel propellant tank load is complete. Left RCS is in-work.\u2019<\/p>\n<p>As per normal for a pad flow, several IPRs (Interim Problem Reports) have been documented for STS-123, most of which have been corrected, or are in the process of being corrected.<\/p>\n<p>\u2018New IPR: During Right OMS oxidizer propellant fill; following flow initiation, flowmeter F3 was reading 9.49 gpm. Downstream F1 and F2 flowmeters showed 5.34 gpm indicating valve B7 was not completely closed,\u2019 added the processing information. \u2018During trouble shooting, valve B7 was manually closed and skid checked for leaks. Flow was reinitiated with nominal results.<\/p>\n<p>\u2018New IPR: During Left RCS oxidizer low pressure loading, a false low pressure spill indication came on indicating tank was full, when it was not. a few gallons of oxidizer were removed to reduce the tank pressure. Low pressure fill to spill was successfully re-performed. This IPR will be closed.<\/p>\n<p>\u2018New IPR: Pressure transducer leak \u2013 two drops\/minute at body joint. Drip pan was installed. Will remove\/replace post S0024. TVCs (Thrust Vector Controls) will be checked and area controlled accordingly once the pump is secured. Constraint is S0007.200, Step 15-3.\u2019 <\/p>\n<p><img loading=\"lazy\" decoding=\"async\" style=\"WIDTH: 205px; HEIGHT: 147px\" height=\"130\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13815\" width=\"200\" align=\"left\" vspace=\"5\" border=\"0\/\"><font face=\"Verdana\" color=\"#0000ff\"><em>**Ride home through the fire,&nbsp;sparks&nbsp;and plasma of re-entry with Atlantis, Discovery and Endeavour.&nbsp;FIVE&nbsp;Stunning high quality&nbsp;2hr, 355-400mb Camcorder and HUD videos \u2013 from payload bay closure \u2013 through re-entry with an&nbsp;astronaut held camcorder video \u2013&nbsp;to post landing \u2013 several more videos showing landing from 90,000 ft also available and HUD videos from STA landings. Includes HALO II Re-entry video, and re-entry videos from Gemini and Apollo (converted from 8mm)**<\/em><\/font><\/p>\n<p>Still under review, but not deemed a major concern, is the SRB factory joint debond issue. The insulatator material \u2013 a heavy rubber material that is vulcanized into the joints on the booster \u2013 is under focus, after a piece liberated at some stage during the booster\u2019s transit on STS-122. This was observed after the boosters arrived back in port following recovery operations downrange.<\/p>\n<p>\u2018Suspect PR on SRB factory joint debond issue: Awaiting program decision to \u2018fly-as-is\u2019 or perform thermography inspections at Pad A,\u2019 noted processing information on Friday. <\/p>\n<p>While it is likely this was a one-off event, evaluations are checking the material has been correctly cured into the hardware. This may require thermography inspections of the joint \u2013 if the conservative option is taken \u2013 though the concern is currently believed to be minimal, given the likelihood is the liberation event during STS-122 occurred when the booster hit the ocean.<\/p>\n<p>Should managers call for thermography inspections, access to the joints \u2013 and some 49 locations on each booster \u2013 could prove to be labor intensive.<\/p>\n<p>A decision on carrying this out appears to be moving back and forth with regards to carrying out thermography inspections, following Thursday processing information which noted inspections wouldn\u2019t be carried out, only to then retract the note and add that the decision had not yet been taken.<\/p>\n<p>\u2018SRB factory joint unbond issue: Program decision was to NOT perform the Thermography inspections. Disposition to the suspect PR is in-work. (This note was added as an addendum: The Program has not yet made a final decision on the SRB factory joint unbond issue regarding any potential inspections to be done.)\u2019 <\/p>\n<p>Meanwhile, another issue relates to the UHF radio on Endeavour, which may require a donation from sister ship Atlantis. While the specific issue was not noted, the fault did not repeat during initial troubleshooting. <\/p>\n<p>\u2018Orbiter UHF radio transmits on both 259.7 AND 243 (GUARD) MHz simultaneously with 259.7 MHz selected. Troubleshooting was nominal and the failure could not be repeated. As a result, the UHF mode switch and\/or transceiver may be removed and replaced, then re-tested.\u2019<\/p>\n<p>Troubleshooting on the UHF radio will continue over the weekend, along with evaluations on an earlier IPR relating to a hydraulics flex hose \u2013 that was detected to be leaking at a greater than allowable rate. The hose in question was earlier re-torqued, but was still leaking.<\/p>\n<p>The weekend will also see the opening aft closeouts, ordnance installation preps, and launch countdown preparations (S0007). S1287 aft compartment closeouts are scheduled to begin 1st shift Saturday, with S0007 preps also scheduled to begin 1st shift. <\/p>\n<p>S5009 Ordnance installation is schedule to pick up Sunday 2nd shift and will continue into 3rd shift Monday.<\/p>\n<p><font color=\"#0000ff\"><em>L2 members<\/em><\/font><em>: All documentation&nbsp;\u2013 from which the above article has quoted snippets \u2013 is available in full in the related L2 sections, updated live.<\/em><\/p>\n<\/p>\n<p><font color=\"#0000ff\"><\/font><font face=\"Arial\"><\/font><font color=\"#0000ff\" size=\"2\"><em>Click here for MaxQ\u2019s Stunning Apollo I\/Challenger\/Columbia&nbsp;Tribute&nbsp;Video \u2018New Days Will Rise\u2019.<\/em><\/font><\/p>\n<p><em><font face=\"Arial\" size=\"2\">**STARLIGHT: STS-117 MISSION&nbsp;REVIEW&nbsp;MUSIC&nbsp;VIDEO**<\/font><\/em><em><font face=\"Arial\" size=\"2\">&nbsp;\u2013 STS-118, STS-120&nbsp;and STS-122 Mission review video also available.<\/font><\/em><font face=\"Arial\"><\/font><font size=\"2\"><em>&nbsp;<\/em><\/font><\/p>\n<p><font color=\"#ff0000\">**ROCK YOU LIKE A HURRICANE: STS-117 MISSION&nbsp;REVIEW&nbsp;MUSIC&nbsp;VIDEO \u2013 AS SEEN BY THE STS-117 CREW!!**<\/font>&nbsp;-.<br \/><font size=\"1\">(<em>Video section is FREE, but you need to sign up as a member of the forum to enter the video section of the site. We only use your e-mail to send you your password. It will not be used for spam etc.)<\/em><\/font><em><\/em><em><font size=\"2\"><\/font><\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>A few issues are being worked on the STS-123 stack, as Endeavour edges ever closer to her opening launch attempt on March 11. The main focus of attention relates to troubleshooting a problem with the orbiter\u2019s UHF radio, along with evaluations regarding the possible requirement of thermography inspections on a suspect Solid Rocket Booster (SRB) [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-41470","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41470"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=41470"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41470\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=41470"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=41470"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=41470"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}