{"id":41480,"date":"2008-02-14T19:44:28","date_gmt":"2008-02-14T11:44:28","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/launch-date-changes-approved-atlantis-performing-without-issue\/"},"modified":"2008-02-14T19:44:28","modified_gmt":"2008-02-14T11:44:28","slug":"launch-date-changes-approved-atlantis-performing-without-issue","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/launch-date-changes-approved-atlantis-performing-without-issue\/","title":{"rendered":"Launch date changes approved \u2013 Atlantis performing without issue"},"content":{"rendered":"<p>STS-122\u2019s Flight Day 8 has consisted of PAO events and waste disposal activities \u2013 earning it the unglamorous title of \u201cdump day\u201d \u2013 ahead of preparations for the third and final EVA of the mission on Flight Day 9, which has now begun.\n<\/p>\n<p>  Meanwhile, at Thursday\u2019s Program Requirements Control Board (PRCB) meeting, a number of 2008\u2019s launch dates have been moved slightly to the right, following a refinement of processing flow timelines.\n<\/p>\n<p><em><img fetchpriority=\"high\" decoding=\"async\" height=\"129\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13910\" width=\"600\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/em><\/p>\n<p><em>**The most comprehensive collection&nbsp;of&nbsp;Shuttle, Ares, Orion&nbsp;and ISS&nbsp;related presentations and mission documentation, plus expansive daily processing documentation and updates&nbsp;are&nbsp;<\/em><font color=\"#0000ff\"><em>available to download&nbsp;on L2<\/em><\/font><font color=\"#0000ff\"><em>&nbsp;**<\/em><\/font><\/p>\n<p><font color=\"#ff0000\"><em><img loading=\"lazy\" decoding=\"async\" height=\"139\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=31173\" width=\"212\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/em><\/font><em><font color=\"#0033ff\">**Click&nbsp;here for sample of L2 menu and content**<\/font><\/em><\/p>\n<p><font color=\"#ff0000\" size=\"3\"><\/font><font size=\"2\"><em>**STS-122 Special:&nbsp;29 Flight Readiness Review (FRR) Presentations, Baselines and Mission Overviews. <font color=\"#0000ff\">**Click here for FRR&nbsp;overview articles: <\/font><\/em><font color=\"#0000ff\"><em>Article 1<\/em><\/font><\/font><font color=\"#0000ff\"><em> \u2013 <\/em><\/font><font color=\"#0000ff\"><em>Article 2<\/em><\/font><font color=\"#000000\"><\/font><font color=\"#0000ff\"><em>**<\/em><\/font>&nbsp;<em>Payload Presentations and vast amounts of live, uploaded images and presentations, movies (several)&nbsp;\u2013 already&nbsp;3600&nbsp;megabytes strong** <\/em><\/p>\n<p><font color=\"#ff0000\" size=\"3\"><\/font><font size=\"2\"><em>**STS-122 MMT Level LIVE now active. STS-123 L2 Special Build-up in full swing (MOD FRR Presentations and Processing).<br \/><\/em><\/font><br \/><font color=\"#0000ff\" size=\"3\"><em>**LIVE updates on Atlantis&nbsp;STS-122 FLIGHT DAY SPECIFIC**<\/em><\/font><\/p>\n<p>&nbsp;<em><font color=\"#0000ff\">**LIVE news updates on&nbsp;Endeavour&nbsp;STS-123 Processing**<\/font><\/em><\/p>\n<p><font color=\"#0000ff\"><em>**LIVE updates on Discovery STS-124 Processing**<\/em><\/font><\/p>\n<p>STS-122 ECO related news content (all exclusives): *Scrub 1* \u2013&nbsp;*MMT Debate*&nbsp;\u2013 *Scrub 2*&nbsp;\u2013 *Hale Memo*&nbsp;\u2013 *Forward Plan*&nbsp;\u2013 *Culprit Found*&nbsp;\u2013 *Tanking Test*&nbsp;\u2013 *Repair&nbsp;Options*&nbsp;\u2013 *MAF Plan* \u2013 *PRCB Debate*&nbsp;\u2013 *Plan Approved*&nbsp;\u2013 *Repair Schedule*&nbsp;\u2013 *Launch Date*&nbsp;\u2013 *New Issue*&nbsp;\u2013 *Hale Rallying Call*&nbsp;\u2013 *PRCB Launch Dates*&nbsp;\u2013 *New Connector Installed*&nbsp;\u2013 *Positive Test Results*&nbsp;\u2013 *Manifest Impacts*&nbsp;\u2013 *Optimism&nbsp;with forward plan*&nbsp;\u2013&nbsp;*Flight Rationale*&nbsp;\u2013 *Repairs Finalizing*&nbsp;\u2013 *Root Cause Confirmed*<\/p>\n<p>Spaceflight news subscription<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Rocket building kits<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>NASA mission updates<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p>STS-122: Hose related news content (all exclusives): *Issue found\/fleet to be checked (December)*&nbsp;\u2013 *Atlantis found to have problem*&nbsp;\u2013 *Managers discuss forward plan*&nbsp;\u2013 *Use of pole to aid retract*&nbsp;\u2013&nbsp;*Successful Retraction*<\/p>\n<\/p>\n<p><u><em>Atlantis Status:<\/em><\/u><\/p>\n<p>Public affairs events, highlighted by German Chancellor Angela Merkel in-flight call from Berlin with ESA astronauts Hans Schlegel and Leopold Eyharts, were conducted during the on-going transfers between Atlantis and the ISS during Flight Day 8.<\/p>\n<p>Atlantis\u2019 mission is proceeding without issue,&nbsp;with the only problem being worked by the Mission Evaluation Room (MER) in Houston relating to an overexposed video that was downloaded from the middeck \u2013 an issue that would normally go without a mention, had it not been for the lack of any other problems. <\/p>\n<p>Mission goals are all on track, with the Mission Management Team (MMT) tasked with refining how much oxygen can be offloaded from Atlantis to the ISS ahead of undocking, with the estimate continuing to rise via reduced power consumption by the orbiter. <\/p>\n<p>This is some achievement, considering Atlantis is now undocking two days later than originally planned, and her lack of the power saving SSPTS (Station-Shuttle Power Transfer System) \u2013 which she will gain for her two additional missions after STS-125.<\/p>\n<p>\u2018Cryo margins: seven hours above 13+0+2, O2 limited. Looks like we\u2019ll get around 70 lbs of O2 transfer to ISS on Flight Day 2,\u2019 noted information on Thursday.<\/p>\n<p>Flight Day 8\u2019s \u2018dump day\u2019 \u2013 which involves the offloading of waste water from the orbiter \u2013 was slightly delayed due to an issue during the parking of the SARJ (Solar Alpha Array Joint). <\/p>\n<p>\u2018During P3 SARJ parking, toothcrash caused SARJ Shutdown to fail. Normally failure occurs after three failed attempts to lock the SARJ but this time it failed after the first attempt,\u2019 noted MMT information. There appears to have been an Ada exception in the P3-2 MDM during the first recovery attempt. <\/p>\n<p>\u2018There is a SPN for the TRRJ where this type of failure is considered a \u2018nominal failure\u2019 case. As there is no such SPN (yet) for SARJ, the team elected to swap SARJ strings. SARJ took a long time to get in a good configuration. Delayed maneuver and water dump init by about an 1.25 hours.\u2019 <\/p>\n<p><em><img loading=\"lazy\" decoding=\"async\" style=\"WIDTH: 205px; HEIGHT: 147px\" height=\"130\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13815\" width=\"200\" align=\"left\" vspace=\"5\" border=\"0\/\"><font face=\"Verdana\" color=\"#0000ff\"><em>**Ride home through the fire,&nbsp;sparks&nbsp;and plasma of re-entry with Atlantis, Discovery and Endeavour.&nbsp;FIVE&nbsp;Stunning high quality&nbsp;2hr, 355-400mb Camcorder and HUD videos \u2013 from payload bay closure \u2013 through re-entry with an&nbsp;astronaut held camcorder video \u2013&nbsp;to post landing \u2013 several more videos showing landing from 90,000 ft also available and HUD videos from STA landings. Includes HALO II Re-entry video, and re-entry videos from Gemini and Apollo (converted from 8mm)**<\/em><\/font><\/em><\/p>\n<p>More updates from the Flight Day will be added when available. <\/p>\n<p>Meanwhile, Thursday\u2019s PRCB has approved changes to a number of what is hoped will be six missions this year, based around the delay to STS-122 due to the ECO (Engine Cut Off) sensor system modifications.<\/p>\n<p>Titled \u2018Update Launch Dates for STS-125 and subs,\u2019 the presentation deals with the resulting downstream impacts of STS-122\u2019s move to February 7, 2008.<\/p>\n<p>The changes push Atlantis\u2019 next mission (STS-125 to service Hubble) from August 7 to August 28 \u2013 although memos note this could eventually move into September \u2013 as observed on some planning manifests.<\/p>\n<p>Endeavour\u2019s LON (Launch On Need) rescue role for STS-125 \u2013 tagged STS-400 \u2013 has a NET (No Earlier Than) launch date of September 4, moving from August 14, although she will take up residence at Pad 39B, for the last time by a shuttle due to the pad\u2019s role for the Ares I-X test flight \u2013 ahead of Atlantis\u2019 launch, due to the lack of safe haven at the ISS during the Hubble mission.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" height=\"143\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=29567\" width=\"243\" align=\"left\" vspace=\"5\" border=\"0\/\">Once Endeavour is stood down from her rescue role, she will then undergo a mini rollback, before being placed on Launch Pad 39A for her primary flight, STS-126 \u2013 itself a highly interesting logistics flight to the ISS. <\/p>\n<p>The mission will be the heaviest logistics flight ever, involving practically everything the ISS requires for a six person crew \u2013 including the kitchen sink \u2013 while also debuting a re-entry experiment.<\/p>\n<p>According to the PRCB presentation, STS-126 has moved from September 18 to October 16, which also causes STS-119 \u2013 with Discovery \u2013 to slip to December 4, from November 6. <\/p>\n<p>These changes still allow for six missions in 2008, although it does not take into account an ongoing evaluation at the Michoud Assembly Facility (MAF), relating to production problems with ET-128 \u2013 the first tank to have a titanium modification to its Ice Frost Ramps (IFRs).<\/p>\n<p>Lockheed Martin managers are still working on a refined delivery date for the tank, which has been documented several times over the previous month as \u2018weeks\u2019 down on its required delivery date that would allow STS-124 to launch in its allotted window in April \u2013 with processing timelines showing the launch will be pushed out into May.<\/p>\n<p>\u2018These dates are based on vehicle processing at KSC. They do not avoid all the manifest constraints,\u2019 added the presentation. \u2018Continue to identify constraints, recovery plans, and decision points to prevent negative work and maximize supportability to the space station and HST.\u2019<\/p>\n<p>Refinements to launch dates will \u2013 as always \u2013 continue to occur over the coming months, though there is no schedule pressure involved. Even if the program sticks to the 2010 retirement date for the fleet, there is enough margin to even allow two of 2008\u2019s flights to slip into 2009 \u2013 which is not the case at present, even after STS-122\u2019s delay.&nbsp;<\/p>\n<p><font color=\"#0000ff\"><em>L2 members<\/em><\/font><em>: All documentation&nbsp;\u2013 from which the above article has quoted snippets \u2013 is available in full in the related L2 sections, updated live.<\/em><\/p>\n<p><font color=\"#0000ff\"><\/font><font face=\"Arial\"><\/font><font color=\"#0000ff\" size=\"2\"><em>Click here for MaxQ\u2019s Stunning Apollo I\/Challenger\/Columbia&nbsp;Tribute&nbsp;Video \u2018New Days Will Rise\u2019.<\/em><\/font><\/p>\n<p><em><font face=\"Arial\" size=\"2\">**STARLIGHT: NEW STS-117 MISSION&nbsp;REVIEW&nbsp;MUSIC&nbsp;VIDEO**<\/font><\/em><em><font face=\"Arial\" size=\"2\">&nbsp;\u2013 STS-118 and STS-120&nbsp;Mission review video also available.<\/font><\/em><font face=\"Arial\"><\/font><font size=\"2\"><em>&nbsp;<\/em><\/font><\/p>\n<p><font color=\"#ff0000\">**ROCK YOU LIKE A HURRICANE: STS-117 MISSION&nbsp;REVIEW&nbsp;MUSIC&nbsp;VIDEO \u2013 AS SEEN BY THE STS-117 CREW!!**<\/font>&nbsp;-.<br \/><font size=\"1\">(<em>Video section is FREE, but you need to sign up as a member of the forum to enter the video section of the site. We only use your e-mail to send you your password. It will not be used for spam etc.)<\/em><\/font><em><\/em><em><font size=\"2\"><\/font><\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>STS-122\u2019s Flight Day 8 has consisted of PAO events and waste disposal activities \u2013 earning it the unglamorous title of \u201cdump day\u201d \u2013 ahead of preparations for the third and final EVA of the mission on Flight Day 9, which has now begun. Meanwhile, at Thursday\u2019s Program Requirements Control Board (PRCB) meeting, a number of [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-41480","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41480"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=41480"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41480\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=41480"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=41480"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=41480"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}