{"id":41489,"date":"2008-02-06T23:36:54","date_gmt":"2008-02-06T15:36:54","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/atlantis-in-good-shape-during-l-1-shuttle-surge-readied\/"},"modified":"2008-02-06T23:36:54","modified_gmt":"2008-02-06T15:36:54","slug":"atlantis-in-good-shape-during-l-1-shuttle-surge-readied","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/atlantis-in-good-shape-during-l-1-shuttle-surge-readied\/","title":{"rendered":"Atlantis in good shape during L-1 \u2013 shuttle surge readied"},"content":{"rendered":"<p>Atlantis remains in a smooth pre-launch flow, as she continues to march towards launch on Thursday afternoon \u2013 weather pending. The Rotating Service Structure (RSS) is now being retracted.\n<\/p>\n<p>  The launch will mark the start of a shuttle surge in 2008, with six missions planned. All three orbiters are lining up for action, as processing continues on Endeavour and Discovery in what is hoped to be three launches by the end of April \u2013 though STS-124 is under threat of slipping.\n<\/p>\n<p><em><img fetchpriority=\"high\" decoding=\"async\" height=\"129\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13910\" width=\"600\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/em><\/p>\n<p><em>**The most comprehensive collection&nbsp;of&nbsp;Shuttle, Ares, Orion&nbsp;and ISS&nbsp;related presentations and mission documentation, plus expansive daily processing documentation and updates&nbsp;are&nbsp;<\/em><font color=\"#0000ff\"><em>available to download&nbsp;on L2<\/em><\/font><font color=\"#0000ff\"><em>&nbsp;**<\/em><\/font><\/p>\n<p><font color=\"#ff0000\"><em><img loading=\"lazy\" decoding=\"async\" height=\"139\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=31173\" width=\"212\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/em><\/font><font color=\"#ff0000\"><em>STS-122 L2 Special NOW LIVE.&nbsp;<\/em><\/font><em><font color=\"#0033ff\">**Click&nbsp;here for sample of L2 menu and content**<\/font><\/em><\/p>\n<p><font color=\"#ff0000\" size=\"3\"><\/font><font size=\"2\"><em>**STS-122 Special:&nbsp;29 Flight Readiness Review (FRR) Presentations, Baselines and Mission Overviews. <font color=\"#0000ff\">**Click here for FRR&nbsp;overview articles: <\/font><\/em><font color=\"#0000ff\"><em>Article 1<\/em><\/font><\/font><font color=\"#0000ff\"><em> \u2013 <\/em><\/font><font color=\"#0000ff\"><em>Article 2<\/em><\/font><font color=\"#000000\"><\/font><font color=\"#0000ff\"><em>**<\/em><\/font>&nbsp;<em>Payload Presentations and vast amounts of live, uploaded images and presentations, movies (several)&nbsp;\u2013 already&nbsp;3100&nbsp;megabytes strong** <\/em><\/p>\n<p>**COMPLETE Section \u2013 over 1350mbs of presentations \u2013 on ECO\/Feedthrough Connector issues and troubleshooting, graphical and data based \u2013 expansive.**<font color=\"#ff0000\" size=\"3\"><\/font><font size=\"2\"><em><br \/><\/em><\/font><br \/><font color=\"#0000ff\" size=\"3\"><em>**LIVE updates on Atlantis&nbsp;STS-122 COUNTDOWN&nbsp;Latest**<\/em><\/font><\/p>\n<p><font color=\"#0000ff\"><em>**LIVE updates on Discovery STS-124 Processing**<\/em><\/font><\/p>\n<p><em><u>  <\/u><\/em><\/p>\n<p>Spaceflight news subscription<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Rocket building kits<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Aerospace &amp; Defense<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<\/p>\n<p>&nbsp;<em><font color=\"#0000ff\">**LIVE news updates on&nbsp;Endeavour&nbsp;STS-123 Processing**<\/font><\/em><\/p>\n<p>STS-122 ECO related news content (all exclusives): *Scrub 1* \u2013&nbsp;*MMT Debate*&nbsp;\u2013 *Scrub 2*&nbsp;\u2013 *Hale Memo*&nbsp;\u2013 *Forward Plan*&nbsp;\u2013 *Culprit Found*&nbsp;\u2013 *Tanking Test*&nbsp;\u2013 *Repair&nbsp;Options*&nbsp;\u2013 *MAF Plan* \u2013 *PRCB Debate*&nbsp;\u2013 *Plan Approved*&nbsp;\u2013 *Repair Schedule*&nbsp;\u2013 *Launch Date*&nbsp;\u2013 *New Issue*&nbsp;\u2013 *Hale Rallying Call*&nbsp;\u2013 *PRCB Launch Dates*&nbsp;\u2013 *New Connector Installed*&nbsp;\u2013 *Positive Test Results*&nbsp;\u2013 *Manifest Impacts*&nbsp;\u2013 *Optimism&nbsp;with forward plan*&nbsp;\u2013&nbsp;*Flight Rationale*&nbsp;\u2013 *Repairs Finalizing*&nbsp;\u2013 *Root Cause Confirmed*<\/p>\n<p>STS-122: Hose related news content (all exclusives): *Issue found\/fleet to be checked (December)*&nbsp;\u2013 *Atlantis found to have problem*&nbsp;\u2013 *Managers discuss forward plan*&nbsp;\u2013 *Use of pole to aid retract*&nbsp;\u2013&nbsp;*Successful Retraction*  <\/p>\n<p><em><u>STS-122:<\/u><\/em><em> <\/em><\/p>\n<p>UPDATES: (Wednesday morning):<\/p>\n<p><!--StartFragment -->SSV PIC resistance and S&amp;A device verfications are complete. <br \/>PRSD LO2 and LH2 load began yesterday at 1452L and was completed at 1929L, Tuesday.<br \/>GN2 to air changeover was completed at 2026L. <br \/>SSME final preparations are underway and TSM securing to follow. <br \/>OMBUU demates and flight cap installation were complete. <br \/>Dock seal deflation completed.<\/p>\n<p>Issues worked: During ECLSS switch configuration, when cabin relief valve B was cycled to Enable, proper talkback indication was not received. Cycled and no longer an issue.<\/p>\n<p>Issues being worked include: SRB aft skirt purge temperature dropped -Troubleshooting began after PRSD loading, with engineering evaluation continuing.<\/p>\n<p>Incident at the pad, when engineer fell of a ladder. Medical Helicopter enroute to pick him up. Worker is not in a serious condition.<\/p>\n<p>The OWP\u2019s are both retracted and triple flips are retracted. RSS retraction will be at 6pm local. This was delayed by 90 minutes.<\/p>\n<p>RSS now being retracted.<\/p>\n<p><em><u>Weather<\/u><\/em>:<\/p>\n<p>Currently, the weather constraint for launch is around the 70 percent mark, though remains a fluid situation: (For live updates on the weather, *click here*)&nbsp;<\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018A cold front will move into the Central Florida area north of Kennedy Space Center (KSC) on launch day. Winds will decrease through the day allowing a sea breeze to develop by launch time,\u2019 an updated document on Wednesday noted.<\/font><\/p>\n<p>\u2018With the convergence along the coast combined with moisture increasing in the atmosphere, there is potential for cumulus clouds, showers, and even an isolated thunderstorm. <\/p>\n<p align=\"left\">\u2018Thunderstorms are more likely to be inland at launch time and move into the KSC area after launch. Although thunderstorms will be isolated, cool air aloft will provide a possibility of severe weather if a thunderstorm does occur, particularly when a storm interacts with the sea breeze.<\/p>\n<p><font face=\"Arial\" size=\"2\">  <\/font><\/p>\n<p align=\"left\">\u2018Our primary concerns for launch day are cumulus clouds, showers, and an anvil from an inland thunderstorm. <\/p>\n<p><font face=\"Arial\" size=\"2\">Meteorological models are now stalling the front in the area for a few days rather than moving it to the south; therefore, there is an increased chance of showers and ceilings for the 24- and 48- hour launch attempts.\u2019<\/font><\/p>\n<p><em><u>STS-122 Round-up (Tuesday evening):<\/u><\/em><\/p>\n<p>On the ground, processing through S0007 (Launch Countdown) remains on track with no issues of importance being noted. LOX\/LH2 loading preparations and system purge verifications have already been completed in the flow.<\/p>\n<p>Preparations for PRSD (Power Reactant Storage and Distribution) loading suffered a slight delay due to minor leaks in the GO2 system. However, it is usual for their to be GSE (Ground Support Equipment) leaks during pre-launch flows. <\/p>\n<p>\u2018The teams continue to march towards a launch. All of the open issues from the delta-FRR (were) closed out at the L-2 MMT meeting Tuesday,\u2019 noted MOD Flight Director Cathy Koerner.<\/p>\n<p>Under intense focus will be the performance of the ECO (Engine Cut Off) sensors during tanking on Thursday morning. The modified LH2 Feed-through connector is believed to be the solution to the issues that caused the delay to the mission from last year. The real test will come on Thursday.&nbsp;<\/p>\n<p>In preparation, a plan of action has been built, which is based around the 3\/4 LCC (Launch Commit Criteria) and the several scenarios that may occur during tanking and the countdown.<\/p>\n<p>\u2018Ascent Flight Director Norm Knight and his team have followed the ECO system modifications and helped coordinate a response plan for ECO system anomalies, should they reoccur on launch day,\u2019 added Koerner, referencing documentation built at last week\u2019s PRCB (Program Requirements Control Board) meeting (presentations on L2).<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" style=\"WIDTH: 205px; HEIGHT: 147px\" height=\"130\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13815\" width=\"200\" align=\"left\" vspace=\"5\" border=\"0\/\"><font face=\"Verdana\" color=\"#0000ff\"><em>**Ride home through the fire,&nbsp;sparks&nbsp;and plasma of re-entry with Atlantis, Discovery and Endeavour.&nbsp;FIVE&nbsp;Stunning high quality&nbsp;2hr, 355-400mb Camcorder and HUD videos \u2013 from payload bay closure \u2013 through re-entry with an&nbsp;astronaut held camcorder video \u2013&nbsp;to post landing \u2013 several more videos showing landing from 90,000 ft also available and HUD videos from STA landings. Includes HALO II Re-entry video, and re-entry videos from Gemini and Apollo (converted from 8mm)**<\/em><\/font><\/p>\n<p>Meanwhile fallout from the bent starboard aft radiator retract flex hose \u2013 successfully retracted on Sunday night \u2013 continues, as Flight Directors draw up contingency plans, should the issue arise during payload bay door closure on orbit at the end of STS-122\u2019s mission.<\/p>\n<p>\u2018As an added precaution against a radiator anomaly, the team is considering modifying the water plan for this mission,\u2019 Koerner added. \u2018The radiator plan for entry is also still being discussed. Entry Flight Director Bryan Lunney is working those details with the EECOM (Emergency, Environmental and Consumables Operation Manager) and EGIL (Electrical, General Instrumentation, and Lighting) teams. Both plans are expected to be finalized this week.\u2019<\/p>\n<p>The plan \u2013 now understood to have been approved \u2013 to add water to the systems is only a contingency and is not likely to be required. Under flight rules, Should the freon coolant start to leak from the hose, Atlantis will be forced to land at the next available opportunity regardless.<\/p>\n<p>\u2018Had great integrated team effort across board on radiator retract hose. Team is generating a mod to allow leaving some additional water in tank to provide additional water management margin on orbit in the event of losing a loop (which is not expected),\u2019 added the Orbiter Project Office (OPO) on the latest Standup report. <\/p>\n<p>\u2018Major emphasis on weekend was verifying the configuration at pad. Have compelling data saying have not launched with the OV-104 (Atlantis) hose in the omega bend; the possibility that it came in during STS-117 exists, but is not likely. Team did enough work to verify we are in leak before burst scenario. <\/p>\n<p>\u2018Other issue is what should do with hose on entry. Should we isolate as soon as close doors or when commit to deorbit burn? Ops team knows how to manage this, but want to put more engineering behind it and see if can isolate to avoid any cavitation concern. (Manager) said way plan entry now is to isolate after door closure. Will reevaluate as more work is done. <\/p>\n<p>\u2018(Management) thanked whole team around the country for the outstanding work on this late issue. Glad have come to a place where will feel safe about flying. <\/p>\n<p>\u2018Leadership on the radiator retract flex hose has been great. Important parts have been communication across the team regardless of organization, and keeping the key folks in the loop. Feedback from USA (United Space Alliance) was that this has been outstanding leadership.\u2019<\/p>\n<p>Additional processing notes through S0007 will be added during Wednesday.<\/p>\n<p><em><u>STS-123:<\/u><\/em><\/p>\n<p>Endeavour is waiting to leave her OPF (Orbiter Processing Facility) for rollover to the Vehicle Assembly Building (VAB) ahead of next month\u2019s STS-123 mission. <\/p>\n<p>Whilst being delayed due to her older sister, work has been continuing on carrying out the LH2 Feed-through connector re-work on her ET (ET-126).<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" height=\"162\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=36684\" width=\"277\" align=\"left\" vspace=\"5\" border=\"0\/\">\u2018(Review) was held yesterday and approval was given for roll over and mate,\u2019 noted Tuesday processing reports. \u2018MPS (Main Propulsion System) helium top off is complete. Final switchlist for roll over and final power down were completed yesterday. <\/p>\n<p>\u2018T-0 disconnects are complete. Final tire pressure checks and top off for flight are complete. Orbiter weight and Center of Gravity checks Tuesday. <\/p>\n<p>\u2018On ET-126 in VAB, installed internal feedthrough connector, and completed electrical checks after installation. L-M (Lockheed Martin) did first PDL (foam) pour in the cable tray; second PDL will be this week. <\/p>\n<p>\u2018Wednesday is last planned day of work for the MAF personnel; will have them back when get back to pad and finish work on the ET (tentatively planned for February 22).\u2019 <\/p>\n<p><em><u>STS-124:<\/u><\/em><\/p>\n<p>Another milestone for Discovery\u2019s April 24th mission began this week, with the opening activities of booster stacking inside the VAB. Processing of the orbiter is continuing on track, as her TPS (Thermal Protection System) receives work following last year\u2019s STS-120. <\/p>\n<p>\u2018Have 81 tile cavities remaining; 114 have been bonded; have 195 cavities for total OPF flow,\u2019 noted the latest Standup. \u2018Will do engine preps this week, and engines are coming down next week. On RCC panels, have two remaining to install \u2013 LH panels 9 and 13. These have been fit checked, and will be installed in coming weeks.<\/p>\n<p>\u2018Began stacking (Monday) in VAB, starting with LH (Left Hand) aft booster (plan to get three segments up this week).\u2019<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" height=\"154\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=39426\" width=\"208\" align=\"left\" vspace=\"5\" border=\"0\/\">Discovery\u2019s ET is the only issue being worked, with its completion date at the Michoud Assembly Facility) undecided, due to drawn out processing work related to the LH2 Feed-through\/ECO issues since STS-122\u2019s scrub launch attempts.<\/p>\n<p>\u2018On ET-128 at MAF, (moved) tank to 420 building Monday. Will take some open work there with them, but the work will proceed in parallel with test, checkout and associated activities,\u2019 noted the Stand-up, with further notes on the NASA HQ\u2019s internal \u20188th Floor News\u2019 confirming production is behind schedule. <\/p>\n<p>\u2018With all of the recent work being performed on ET-125 (STS-122) and ET-126 (STS-123), the next ET in production (ET-128) has fallen behind in its schedule,\u2019 added the report. <\/p>\n<p>\u2018The MAF personnel who have been working at KSC on the feedthru connector modifications are scheduled to return to MAF this week and concentrate their efforts on ET-128. It\u2019s expected that with the change in emphasis, they will still meet their delivery milestones.\u2019<\/p>\n<p>The tank, which will debut several new modifications for checkout ahead of the flagship STS-125 mission to Hubble, is believed to be around two weeks down on its schedule, which is threatening the April 24 launch date for Discovery.<\/p>\n<p>Targets will continue&nbsp;to be refined as the program works through the upcoming missions.<br \/><em><br \/><\/em><font color=\"#0000ff\"><em>L2 members<\/em><\/font><em>: All documentation&nbsp;\u2013 from which the above article has quoted snippets \u2013 is available in full in the related L2 sections, updated live.<\/em><\/p>\n<p><font color=\"#0000ff\"><\/font><font face=\"Arial\"><\/font><font color=\"#0000ff\" size=\"2\"><em>Click here for MaxQ\u2019s Stunning Apollo I\/Challenger\/Columbia&nbsp;Tribute&nbsp;Video \u2018New Days Will Rise\u2019.<\/em><\/font><\/p>\n<p><em><font face=\"Arial\" size=\"2\">**STARLIGHT: NEW STS-117 MISSION&nbsp;REVIEW&nbsp;MUSIC&nbsp;VIDEO**<\/font><\/em><em><font face=\"Arial\" size=\"2\">&nbsp;\u2013 STS-118 and STS-120&nbsp;Mission review video also available.<\/font><\/em><font face=\"Arial\"><\/font><font size=\"2\"><em>&nbsp;<\/em><\/font><\/p>\n<p><font color=\"#ff0000\">**ROCK YOU LIKE A HURRICANE: STS-117 MISSION&nbsp;REVIEW&nbsp;MUSIC&nbsp;VIDEO \u2013 AS SEEN BY THE STS-117 CREW!!**<\/font>&nbsp;-.<br \/><font size=\"1\">(<em>Video section is FREE, but you need to sign up as a member of the forum to enter the video section of the site. We only use your e-mail to send you your password. It will not be used for spam etc.)<\/em><\/font><em><\/em><em><font size=\"2\"><\/font><\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Atlantis remains in a smooth pre-launch flow, as she continues to march towards launch on Thursday afternoon \u2013 weather pending. The Rotating Service Structure (RSS) is now being retracted. The launch will mark the start of a shuttle surge in 2008, with six missions planned. All three orbiters are lining up for action, as processing [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-41489","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41489"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=41489"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41489\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=41489"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=41489"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=41489"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}