{"id":41492,"date":"2008-02-01T22:49:19","date_gmt":"2008-02-01T14:49:19","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/sts-122-hose-resolution-approved-involves-a-long-pole\/"},"modified":"2008-02-01T22:49:19","modified_gmt":"2008-02-01T14:49:19","slug":"sts-122-hose-resolution-approved-involves-a-long-pole","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/sts-122-hose-resolution-approved-involves-a-long-pole\/","title":{"rendered":"STS-122: Hose resolution approved \u2013 involves a long pole"},"content":{"rendered":"<p>Shuttle managers have been presented with solutions that approve Atlantis\u2019 starboard aft radiator retract flex hose to fly as-is, though the upcoming payload bay door closure for flight \u2013 NET Sunday \u2013 will be the key event to ensure STS-122 remains on track for February 7.\n<\/p>\n<p>  X-Ray results and leak checks on the hose show the Omega bend has not caused any damage of note, while a plan is being drawn up that involves an engineer guiding the hose back into its box via a long pole.\n<\/p>\n<p><em><img fetchpriority=\"high\" decoding=\"async\" height=\"129\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13910\" width=\"600\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/em><\/p>\n<p><em>**The most comprehensive collection&nbsp;of&nbsp;Shuttle, Ares, Orion&nbsp;and ISS&nbsp;related presentations and mission documentation, plus expansive daily processing documentation and updates&nbsp;are&nbsp;<\/em><font color=\"#0000ff\"><em>available to download&nbsp;on L2<\/em><\/font><font color=\"#0000ff\"><em>&nbsp;**<\/em><\/font><\/p>\n<p><font color=\"#ff0000\"><em><img loading=\"lazy\" decoding=\"async\" height=\"139\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=31173\" width=\"212\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/em><\/font><font color=\"#ff0000\"><em>STS-122 L2 Special NOW LIVE.&nbsp;<\/em><\/font><em><font color=\"#0033ff\">**Click&nbsp;here for sample of L2 menu and content**<\/font><\/em><\/p>\n<p><font color=\"#ff0000\" size=\"3\"><\/font><font size=\"2\"><em>**STS-122 Special:&nbsp;29 Flight Readiness Review (FRR) Presentations, Baselines and Mission Overviews. <font color=\"#0000ff\">**Click here for FRR&nbsp;overview articles: <\/font><\/em><font color=\"#0000ff\"><em>Article 1<\/em><\/font><\/font><font color=\"#0000ff\"><em> \u2013 <\/em><\/font><font color=\"#0000ff\"><em>Article 2<\/em><\/font><font color=\"#000000\"><\/font><font color=\"#0000ff\"><em>**<\/em><\/font>&nbsp;<em>Payload Presentations and vast amounts of live, uploaded images and presentations, movies (several)&nbsp;\u2013 already&nbsp;3000&nbsp;megabytes strong** <\/em><\/p>\n<p>**COMPLETE Section \u2013 over 1350mbs of presentations \u2013 on ECO\/Feedthrough Connector issues and troubleshooting, graphical and data based \u2013 expansive.**<\/p>\n<p><font color=\"#0000ff\" size=\"3\"><em>**LIVE updates on Atlantis&nbsp;STS-122&nbsp;PRE-LAUNCH&nbsp;Latest**<\/em><\/font><\/p>\n<p><font color=\"#0000ff\"><em>**LIVE updates on Discovery STS-124 Processing**<\/em><\/font><\/p>\n<p><em><u><\/u><\/em><\/p>\n<\/p>\n<p>NASA mission updates<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Aerospace industry analysis<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Company News<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<\/p>\n<p>&nbsp;<em><font color=\"#0000ff\">**LIVE news updates on&nbsp;Endeavour&nbsp;STS-123 Processing**<\/font><\/em><\/p>\n<p>STS-122 ECO related news content: *Scrub 1* \u2013&nbsp;*MMT Debate*&nbsp;\u2013 *Scrub 2*&nbsp;\u2013 *Hale Memo*&nbsp;\u2013 *Forward Plan*&nbsp;\u2013 *Culprit Found*&nbsp;\u2013 *Tanking Test*&nbsp;\u2013 *Repair&nbsp;Options*&nbsp;\u2013 *MAF Plan* \u2013 *PRCB Debate*&nbsp;\u2013 *Plan Approved*&nbsp;\u2013 *Repair Schedule*&nbsp;\u2013 *Launch Date*&nbsp;\u2013 *New Issue*&nbsp;\u2013 *Hale Rallying Call*&nbsp;\u2013 *PRCB Launch Dates*&nbsp;\u2013 *New Connector Installed*&nbsp;\u2013 *Positive Test Results*&nbsp;\u2013 *Manifest Impacts*&nbsp;\u2013 *Optimism&nbsp;with forward plan*&nbsp;\u2013&nbsp;*Flight Rationale*&nbsp;\u2013 *Repairs Finalizing*&nbsp;\u2013 *Root Cause Confirmed*<\/p>\n<p><em><u>LATEST:<\/u><\/em><\/p>\n<p>Daily PRCB meeting has started. Managers are discussing the forward plan and are expected to approve the continued push towards the Feb 7 launch date. (Pending successful hose retract).<\/p>\n<p>PRCB ends. Approval to continue towards launch, pending how Monday goes with the payload bay door closure. A engineer to be flown in to Florida to conduct the hose retract (with a long pole\/stick).<\/p>\n<p>OPO clear Fuel Cell 2 for flight.<br \/>All Presentations now on L2.<\/p>\n<p>PLBD Closure now NET&nbsp;Sunday. Tech using the pole\/stick is from the United Space Alliance, not Boeing \u2013 tech went to Boeing in California to practise, before being flown back for the PLBD closure.<\/p>\n<p><em><u>STS-122 Pre-Launch Flow Latest:<\/u><\/em><\/p>\n<p>The bend, first since on sister ship Discovery, required leak checks to ensure it wasn\u2019t \u2013 or had the potential of \u2013 leaking its freon coolant, which would be undesirable&nbsp;during the upcoming mission. <\/p>\n<p>Test results show the hose is in reasonably good shape, which is a major boost to the approval of flight rationale. <\/p>\n<p>The other option available to managers&nbsp;\u2013 R&amp;R \u2013 would likely involve rollback, destack, and removal of the hose in Atlantis\u2019 Orbiter Processing Facility (OPF) \u2013 adding a two month delay to the launch. R&amp;R at the pad would take a month. <\/p>\n<p>\u2018Making good progress on radiator retract hose. Working with KSC team on a couple of different options in terms of rollback and R&amp;R at the pad. Rollback option to R&amp;R would impact launch by a couple of months,\u2019 noted the latest Shuttle Stand-up\/Integration report. <\/p>\n<p>\u2018R&amp;R at the pad doesn\u2019t look very feasible and would be a challenging task. It is challenging to do in the OPF as it is and takes 30 days, so looking at a month\u2019s slip if could determine how to do work at the pad. <\/p>\n<p>\u2018Over last 48 hours, have been focusing on fly as-is option as the primary work. Will remove V-guide to avoid contact. Preliminary indications were that there was no evidence of significant damage to flex hose. <\/p>\n<p>\u2018Discussed options and converged to what they think is easiest option, which is to gradually work hose back into box. Team going to Huntington Beach today to test OV-103 hose, which has a similar Omega bend.\u2019<\/p>\n<p>Test results, noted on processing information Friday morning, continued the positive theme that the hose appears to be in good shape, despite its shape, with no sign of damage that would be a concern to engineers.<\/p>\n<p>\u2018Aft STB PLBD retract hose (update) \u2013 X-rays show the retract hose is in good condition. Inspections of the hose exterior found the braid to be slightly damaged (about 1-2 inches in length of distorted braids with 2 broken strands visible), but acceptable. No Freon leakage was detected,\u2019 noted the processing information. <\/p>\n<p>\u2018Boeing engineering at Huntington Beach is assessing techniques for assisting hose retraction during PLBD closure. The IPR (Interim Problem Report) is scheduled to be briefed to the Daily PRCB (Program Requirements Control Board) today.\u2019<\/p>\n<p>While everything appears to be pointing towards managers being presented with good rationale to fly as-is, the key event will be payload bay closure on Monday, which will ultimately see how the hose retracts back into its box.<\/p>\n<p>To ensure the hose retracts properly, plans are being drawn up that may employ an engineer holding a 15 foot or so long pole, with a U-shaped fitting on the end. This would be used to help guide the hose back into the box. <\/p>\n<p>This plan is still being refined due to the problematic nature of then removing the pole just prior to the closure of the payload bay door.<\/p>\n<p>\u2018Using techniques to work that hose back into radiator retract hose box. Don\u2019t have a schedule yet on how would access this work at pad,\u2019 added the Stand-up. \u2018Once determine this, will know if can support February 7 launch date or not.\u2019<\/p>\n<p>Managers are expected to overview the latest data on the hose on Saturday, via a teleconference \u2013 headed by KSC manager Leroy Cain.<\/p>\n<p>Further updates on the hose issue will be added to the article as they arrive.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" style=\"WIDTH: 205px; HEIGHT: 147px\" height=\"130\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13815\" width=\"200\" align=\"left\" vspace=\"5\" border=\"0\/\"><font face=\"Verdana\" color=\"#0000ff\"><em>**Ride home through the fire,&nbsp;sparks&nbsp;and plasma of re-entry with Atlantis, Discovery and Endeavour.&nbsp;FIVE&nbsp;Stunning high quality&nbsp;2hr, 355-400mb Camcorder and HUD videos \u2013 from payload bay closure \u2013 through re-entry with an&nbsp;astronaut held camcorder video \u2013&nbsp;to post landing \u2013 several more videos showing landing from 90,000 ft also available and HUD videos from STA landings. Includes HALO II Re-entry video, and re-entry videos from Gemini and Apollo (converted from 8mm)**<\/em><\/font><\/p>\n<p>Meanwhile, processing has continued on the timeline, with only one issue being monitored. This relates to Fuel Cell 2, which had been showing intermittent problems during the STS-122 pre-launch flow. Those problems continue, though they are not serious enough to be a constraint to launch at this time. <\/p>\n<p>\u2018Fuel cell 2 was discussed at Delta FRR and OPO (Orbiter Project Office) Tag-Up. Have confirmed it is a small in spec leakage. Recommendation from OPO Tag-Up was to continue watching this but fly as is,\u2019 added the Stand-up. <\/p>\n<p>\u2018Not sure where it is leaking exactly, but it is in spec. Do have right hazardous gas monitoring in place. If the leak was to increase, they can detect it.\u2019 <\/p>\n<p>Otherwise Atlantis is in a smooth transition towards the start of S0007 (Launch Countdown) early next week, pending the approval to fly the bent hose as-is, and its successful retraction during payload bay door closure. <\/p>\n<p>\u2018Call to stations for S0071 Hyper\/MPS pressurization for flight operations scheduled for Friday at 2000L,\u2019 noted Friday processing information. \u2018Initial pressurization scheduled to begin 0200L Saturday. Final pressurization scheduled to begin 0030L Sunday. <\/p>\n<p>\u2018S1287 Orbiter Aft closeout was completed yesterday. The 50-1\/2 doors were installed and the Aft confidence test was completed successfully. <\/p>\n<p>\u2018The 50-2 door had to be removed post confidence test to allow PVD engineering to reperform leak checks of the PLB purge duct at the proper pressure. The leak checks were good and the door was reinstalled. <\/p>\n<p>\u2018Weekend Work: S0071 Hyper\/MPS pressurization, S0007 preps continue, and work associated with (the hose).\u2019<br \/><em><br \/><\/em><font color=\"#0000ff\"><em>L2 members<\/em><\/font><em>: All documentation&nbsp;\u2013 from which the above article has quoted snippets \u2013 is available in full in the related L2 sections, updated live.<\/em><\/p>\n<p><font color=\"#0000ff\"><\/font><font face=\"Arial\"><\/font><font color=\"#0000ff\" size=\"2\"><em>Click here for MaxQ\u2019s Stunning Apollo I\/Challenger\/Columbia&nbsp;Tribute&nbsp;Video \u2018New Days Will Rise\u2019.<\/em><\/font><\/p>\n<p><em><font face=\"Arial\" size=\"2\">**STARLIGHT: NEW STS-117 MISSION&nbsp;REVIEW&nbsp;MUSIC&nbsp;VIDEO**<\/font><\/em><em><font face=\"Arial\" size=\"2\">&nbsp;\u2013 STS-118 and STS-120&nbsp;Mission review video also available.<\/font><\/em><font face=\"Arial\"><\/font><font size=\"2\"><em>&nbsp;<\/em><\/font><\/p>\n<p><font color=\"#ff0000\">**ROCK YOU LIKE A HURRICANE: STS-117 MISSION&nbsp;REVIEW&nbsp;MUSIC&nbsp;VIDEO \u2013 AS SEEN BY THE STS-117 CREW!!**<\/font>&nbsp;-.<br \/><font size=\"1\">(<em>Video section is FREE, but you need to sign up as a member of the forum to enter the video section of the site. We only use your e-mail to send you your password. It will not be used for spam etc.)<\/em><\/font><em><\/em><em><font size=\"2\"><\/font><\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Shuttle managers have been presented with solutions that approve Atlantis\u2019 starboard aft radiator retract flex hose to fly as-is, though the upcoming payload bay door closure for flight \u2013 NET Sunday \u2013 will be the key event to ensure STS-122 remains on track for February 7. X-Ray results and leak checks on the hose show [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-41492","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41492"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=41492"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41492\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=41492"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=41492"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=41492"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}