{"id":41508,"date":"2008-01-10T20:51:10","date_gmt":"2008-01-10T12:51:10","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/prcb-plan-sts-122-for-net-feb-7-three-launches-in-10-11-weeks\/"},"modified":"2008-01-10T20:51:10","modified_gmt":"2008-01-10T12:51:10","slug":"prcb-plan-sts-122-for-net-feb-7-three-launches-in-10-11-weeks","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/prcb-plan-sts-122-for-net-feb-7-three-launches-in-10-11-weeks\/","title":{"rendered":"PRCB plan STS-122 for NET Feb 7 \u2013 three launches in 10-11 weeks"},"content":{"rendered":"<p>Thursday\u2019s Program Requirements Control Board (PRCB) meeting has concluded with a decision on a forward plan that will allow for three missions in the space of around 10 weeks.\n<\/p>\n<p>  Managers discussed the current status of testing on the external LH2 Feed-through connector troubleshooting, and decided against conducting a tanking test ahead of the launch of STS-122, which is now tracking a NET (No Earlier Than) February 7 launch date.\n<\/p>\n<p><em><img fetchpriority=\"high\" decoding=\"async\" height=\"129\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13910\" width=\"600\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/em><\/p>\n<p><em>**The most comprehensive collection&nbsp;of&nbsp;Shuttle, Ares, Orion&nbsp;and ISS&nbsp;related presentations and mission documentation, plus expansive daily processing documentation and updates&nbsp;are&nbsp;<\/em><font color=\"#0000ff\"><em>available to download&nbsp;on L2<\/em><\/font><font color=\"#0000ff\"><em>&nbsp;**<\/em><\/font><\/p>\n<p><font color=\"#ff0000\"><em><img loading=\"lazy\" decoding=\"async\" height=\"139\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=31173\" width=\"212\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/em><\/font><font color=\"#ff0000\"><em>L2: STS-122&nbsp;to STS-127&nbsp;documentation already available.<\/em><\/font><\/p>\n<p>STS-122 L2 Special NOW LIVE.&nbsp;<em><font color=\"#0033ff\">**Click&nbsp;here for sample of L2 menu and content**<\/font><\/em><\/p>\n<p><em><font color=\"#ff0000\" size=\"3\"><\/font><font size=\"2\">**STS-122 Special: 12 MOD Flight Readiness Review (FRR) Presentations, Baselines and Mission Overviews. 17 Shuttle FRR Presentations. Payload Presentations and vast amounts of live, uploaded images and presentations. Installation Movies (several)&nbsp;\u2013 already&nbsp;2100&nbsp;megabytes strong** <\/font><\/em><\/p>\n<p>**COMPLETE Section on ECO\/Feedthrough Connector issues and troubleshooting, graphical and data based \u2013 expansive.**<\/p>\n<p><font color=\"#0000ff\" size=\"3\"><em>**LIVE updates on Atlantis&nbsp;STS-122 Troubleshooting Latest**<\/em><\/font><\/p>\n<p><font color=\"#0000ff\"><em>**LIVE updates on Discovery STS-124 Processing**<\/em><\/font><\/p>\n<p><em><u><\/u><\/em><\/p>\n<p>Aerospace &amp; Defense<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Spaceflight<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Technology News<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<\/p>\n<p>&nbsp;<em><font color=\"#0000ff\">**LIVE news updates on&nbsp;Endeavour&nbsp;STS-123 Processing**<\/font><\/em><\/p>\n<p>**Click here for FRR&nbsp;overview articles: Article 1 \u2013 Article 2**&nbsp;&nbsp;\u2013 Click *HERE* for all our articles on the STS-122 ECO\/Feedthrough Connector&nbsp;issue.<br \/><em><u><\/u><\/em><\/p>\n<p><em><u>Launch Date Latest:<\/u><\/em>&nbsp;<\/p>\n<p>Schedules from today\u2019s meeting showed that February 2 remained the NET date for the launch of STS-122, as testing and installation plans remained on track. However, the conflict with the launch of a Russian cargo ship has re-aligned STS-122 to February 7.<\/p>\n<p>To allow STS-122 to launch on February 2, the Russians would have had to move the launch of Progress M-63 to either the end of January or the middle of February \u2013 after Atlantis had landed after her mission.<\/p>\n<p>Following discussions on Thursday, the Russians will launch Progress M-63 on February 5, allowing Atlantis to launch on February 7 or 8&nbsp;\u2013 should the installation effort proceed as advertised. <\/p>\n<p>Looking further into the schedule, managers received&nbsp;launch date targets&nbsp;that shows the launch of STS-123\/Endeavour on March 11 \u2013 though this is likely to move to March 17, and STS-124 April 24. The rest of the schedule for 2008 is expected to fall back into place as previously manifested.<\/p>\n<p><em><u>ET-125 R&amp;R Latest:<\/u><\/em><\/p>\n<p>Engineers are very close to installing the replacement external LH2 Feed-through connector into ET-125, and will take place over the weekend \u2013&nbsp;with most of the pre-installation testing complete.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" height=\"152\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=38426\" width=\"242\" align=\"left\" vspace=\"5\" border=\"0\/\">\u2018Soldering completed. IR and DW on the connector completed. Lightning Checks completed. Pressure and Leak Check to 100 psi completed. Glass inspections Completed. Moisture Proofing Completed,\u2019 noted one PRCB presentation.<\/p>\n<p>\u2018Analysis of the CTE predictions indicates a possible design issue for excess loading put on the glass. Socket shoulder to the teflon insert could be imparting load during cryo and flight through the pins into the Crit 1 glass.<\/p>\n<p>\u2018NDE of the ET-125 new part in work to provide positive verification of required gapping. Results will dictate acceptable use or a possible design fix.\u2019<\/p>\n<p>Post-testing presentations on the new issue of \u2018glass cracks\u2019 have noted favorable results, adding confidence that LH2 won\u2019t leak past the glass \u2013 which was the concern.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" style=\"WIDTH: 293px; HEIGHT: 134px\" height=\"139\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=38425\" width=\"330\" align=\"left\" vspace=\"5\" border=\"0\/\">\u2018No Indications of leakage past the glass. Visual Inspection of the glass completed. No increase in the glass cracks,\u2019 noted presentations on the opening results of ongoing testing at MSFC and MAF (Michoud Assembly Facility).<\/p>\n<p>\u2018Pressure Checked the old ET-125 hardware completed \u2013 GHe up to 95 psi, LHe up to 95 psi. Small leak seen around he K-Seal (not related to the glass). Leak attributed to the reuse of the K-Seal and the configuration GHe up to 95 psi.\u2019<\/p>\n<p>More testing is scheduled, as engineers aim to ensure their fix won\u2019t cause any additional problems, post-installation. The process of changeout with the replacement connector (with soldered wires\/pins) is also being carried out on ET-126 \u2013 which will fly with STS-123\/Endeavour \u2013 inside the VAB (Vehicle Assembly Building).<\/p>\n<p>\u2018Interim Design fix hardware almost ready. Testing at MSFC continues \u2013 LH2 runs expected Thursday. Glass investigation continues in parallel with installation,\u2019 added PRCB presentations.<\/p>\n<p>\u2018Foam Removal on ET-126 in work. Foam Removal around J-Box complete. J-Box foam removal in work. Will Mate ET-126 this week to preserve schedule. Connector Removal and Interim Design Fix hardware will be installed in the Integration Cell. Foam closeouts to follow through the STS-123 Pad flow.\u2019<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" style=\"WIDTH: 205px; HEIGHT: 147px\" height=\"130\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13815\" width=\"200\" align=\"left\" vspace=\"5\" border=\"0\/\"><font face=\"Verdana\" color=\"#0000ff\"><em>**Ride home through the fire,&nbsp;sparks&nbsp;and plasma of re-entry with Atlantis, Discovery and Endeavour.&nbsp;FIVE&nbsp;Stunning high quality&nbsp;2hr, 355-400mb Camcorder and HUD videos \u2013 from payload bay closure \u2013 through re-entry with an&nbsp;astronaut held camcorder video \u2013&nbsp;to post landing \u2013 several more videos showing landing from 90,000 ft also available and HUD videos from STA landings. Includes HALO II Re-entry video, and re-entry videos from Gemini and Apollo (converted from 8mm)**<\/em><\/font><\/p>\n<p><em><u>Tanking Test:<br \/><\/u><\/em><br \/>The official decision on whether to carry out a tanking test is scheduled for later in the month. However, two PRCB presentations, one of which came from Lockheed Martin \u2013 who construct the tanks \u2013 recommended this action should not be added to the pad flow.<\/p>\n<p>The rationale against carrying out a tanking test worked on the basis of ensuring the foam insulation on the tank isn\u2019t put through an additional cryo cycle, which can cause the foam to crack.<\/p>\n<p>\u2018Assess the value of performing another tanking test prior to STS-122 launch,\u2019 noted the Lockheed Martin presentation. \u2018Approach: Assessed pros and cons of performing tanking test <\/p>\n<p>\u2018Pro: Allows early system verification prior to launch attempt. Con: Additional pressure cycles on TPS. Potential for additional TPS cracks. Ice \/ Debris Inspection Criteria to be used for acceptance criteria of observed conditions.<\/p>\n<p>\u2018Assessment Results: STS-122 tanking test not required. Redesigned ECO system connector qualification and acceptance tests developed to verify effectiveness of redesign prior to installation. Qualification test simulates prelaunch and ascent environments and functions. Post installation checks verify ambient condition electrical checks.\u2019<\/p>\n<p>\u2018Tanking test not required \u2013 Redesign will be certified for flight with no verification requirements associated with a tanking test,\u2019 backed up a NASA presentation to the PRCB. \u2018No additional data are required for flight rationale. Prevents additional cryo cycle on ET prior to STS-122.<\/p>\n<p>\u2018The only value in performing a tanking test would be in the event the failure recurs. Drag on instrumentation would be available for additional data and troubleshooting.\u2019<br \/><em><br \/><\/em><font color=\"#0000ff\"><em>L2 members<\/em><\/font><em>: All documentation&nbsp;\u2013 from which the above article has quoted snippets \u2013 is available in full in the related L2 sections, updated live.<\/em><\/p>\n<p><em><font face=\"Arial\" color=\"#0000ff\" size=\"2\">**STARLIGHT: NEW STS-117 MISSION&nbsp;REVIEW&nbsp;MUSIC&nbsp;VIDEO**&nbsp;\u2013 STS-118 and STS-120&nbsp;Mission review video also available.<\/font><\/em><font face=\"Arial\"><\/font><font size=\"2\"><em>&nbsp;<\/em><\/font><\/p>\n<p><font color=\"#ff0000\">**ROCK YOU LIKE A HURRICANE: STS-117 MISSION&nbsp;REVIEW&nbsp;MUSIC&nbsp;VIDEO \u2013 AS SEEN BY THE STS-117 CREW!!**<\/font>&nbsp;-.<br \/><font size=\"1\">(<em>Video section is FREE, but you need to sign up as a member of the forum to enter the video section of the site. We only use your e-mail to send you your password. It will not be used for spam etc.)<\/em><\/font><em><\/em><em><font face=\"Arial\" size=\"2\"><\/font><\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Thursday\u2019s Program Requirements Control Board (PRCB) meeting has concluded with a decision on a forward plan that will allow for three missions in the space of around 10 weeks. Managers discussed the current status of testing on the external LH2 Feed-through connector troubleshooting, and decided against conducting a tanking test ahead of the launch of [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-41508","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41508"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=41508"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41508\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=41508"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=41508"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=41508"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}