{"id":41513,"date":"2008-01-03T18:27:57","date_gmt":"2008-01-03T10:27:57","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/prcb-draw-up-their-forward-plan-sts-122-net-launch-date-plan\/"},"modified":"2008-01-03T18:27:57","modified_gmt":"2008-01-03T10:27:57","slug":"prcb-draw-up-their-forward-plan-sts-122-net-launch-date-plan","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/prcb-draw-up-their-forward-plan-sts-122-net-launch-date-plan\/","title":{"rendered":"PRCB draw up their forward plan \u2013 STS-122 NET launch date plan"},"content":{"rendered":"<p>Shuttle managers have concluded their meeting over the latest status of the troubleshooting efforts on ET-125, which is to receive new external LH2 Feed-through connector hardware, due to arrive on Friday.\n<\/p>\n<p>  The PRCB was presented with a forward plan that shows the new NET (No Earlier Than) launch date as February 8 \u2013 should they decide to conduct a tanking test. Without the test, they could aim for February 2. These date options are \u201cexpected\u201d \u2013 while a protected January 24 option is deemed unlikely.\n<\/p>\n<p><em><img fetchpriority=\"high\" decoding=\"async\" height=\"129\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13910\" width=\"600\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/em><\/p>\n<p><em>**The most comprehensive collection&nbsp;of&nbsp;Shuttle, Ares, Orion&nbsp;and ISS&nbsp;related presentations and mission documentation, plus expansive daily processing documentation and updates&nbsp;are&nbsp;<\/em><font color=\"#0000ff\"><em>available to download&nbsp;on L2<\/em><\/font><font color=\"#0000ff\"><em>&nbsp;**<\/em><\/font><\/p>\n<p><font color=\"#ff0000\"><em><img loading=\"lazy\" decoding=\"async\" height=\"139\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=31173\" width=\"212\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/em><\/font><font color=\"#ff0000\"><em>L2: STS-122&nbsp;to STS-127&nbsp;documentation already available.<\/em><\/font><\/p>\n<p>STS-122 L2 Special NOW LIVE.&nbsp;<em><font color=\"#0033ff\">**Click&nbsp;here for sample of L2 menu and content**<\/font><\/em><\/p>\n<p><em><font color=\"#ff0000\" size=\"3\"><\/font><font size=\"2\">**STS-122 Special: 12 MOD Flight Readiness Review (FRR) Presentations, Baselines and Mission Overviews. 17 Shuttle FRR Presentations. Payload Presentations and vast amounts of live, uploaded images and presentations. Installation Movies (several)&nbsp;\u2013 already&nbsp;2000&nbsp;megabytes strong** <\/font><\/em><\/p>\n<p>**COMPLETE Section on ECO\/Feedthrough Connector issues and troubleshooting, graphical and data based \u2013 expansive.**<\/p>\n<p><font color=\"#0000ff\" size=\"3\"><em>**LIVE updates on Atlantis&nbsp;STS-122 Troubleshooting Latest**<\/em><\/font><\/p>\n<p><font color=\"#0000ff\"><em>**LIVE updates on Discovery STS-124 Processing**<\/em><\/font><\/p>\n<p><em><u><\/u><\/em><\/p>\n<p>Space Shuttle models<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>NASA mission patches<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Aerospace &amp; Defense<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<\/p>\n<p>&nbsp;<em><font color=\"#0000ff\">**LIVE news updates on&nbsp;Endeavour&nbsp;STS-123 Processing**<\/font><\/em><\/p>\n<p>**Click here for FRR&nbsp;overview articles: Article 1 \u2013 Article 2**&nbsp;&nbsp;\u2013 Click *HERE* for all our articles on the STS-122 ECO\/Feedthrough Connector&nbsp;issue.<br \/><em><u><\/u><\/em><\/p>\n<p><em><u>Pre-PRCB Troubleshoot Latest:<br \/><\/u><\/em><img loading=\"lazy\" decoding=\"async\" height=\"171\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=38062\" width=\"255\" align=\"left\" vspace=\"5\" border=\"0\/\">Testing at the pad and at the Marshall Space Flight Center (MSFC) has begun on the LH2 Feed-through connector hardware, in a dual troubleshooting effort to pinpoint the cause of anomalous Engine Cut Off (ECO) sensor system readings. <\/p>\n<p>The external connector is now at MSFC for bench testing, with engineers aiming to install a new connector into ET-125. <\/p>\n<p>Currently timelines note 25 days worth of work before United Space Alliance workers can return STS-122 into a launch configuration, for the commencement of S0007 Launch Countdown operations. <\/p>\n<p>The connector hardware will be installed by a special team from the Michoud Assembly Facility (MAF), although a key factor will be the testing of ET-125\u2019s external connector, plug and associated wiring at MSFC. <\/p>\n<p>Testing on ET-120\u2019s LH2 Feed-through connector failed to find conclusive issues with the hardware, before Onboard <u><font color=\"#0000ff\">TDR (Time-Domain Reflectometry) instrumentation during third tanking<\/font><\/u> identified open circuit condition at Feed-through location. <\/p>\n<p>Work at the pad is continuing, in case the issue may be related to the internal hardware \u2013 which remains installed in the tank. <\/p>\n<p>Should a problem be found with the internal connector over the coming days, to the point that it requires replacing, engineers would need STS-122 to rollback to the Vehicle Assembly Building (VAB), given no access to the internal workings of the tank can be carried out at the pad. <\/p>\n<p>\u2018Fiberscope inspection of internal plug for evidence of corrosion, contamination and damage. Look into sockets,\u2019 noted documentation on the current process at the pad this week. \u2018Contamination sampling by KSC NDE. Perform transference burnishing on insert face and pin insertion\/extraction into sockets, bag &amp; tag for evaluation.\u2019 <\/p>\n<p>\u2018Take X-rays of demated internal plug. Perform internal plug socket tine grip force test using sample pin and force gauge. 3 pulls per socket, all 37 sockets.\u2019 <\/p>\n<p>The meeting of shuttle management, at the scheduled Program Requirements Control Board (PRCB) meeting, may also include the opening test results from MSFC on the external connector hardware. <\/p>\n<p>Any culprits found during testing&nbsp;would provide hope that the fault is specific to the removed hardware, thus raising the chances of being just a month away from a potential launch date.<\/p>\n<p><em><u>PRCB Newsflashes and decisions:<\/u><\/em><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" height=\"142\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=38211\" width=\"154\" align=\"left\" vspace=\"5\" border=\"0\/\">X-Ray results from the ET-125 internal feed-through connector at the pad showed no issues.<\/p>\n<p>Pull tests on ET-125 internal feed-through connector showed no issues, comparable to ET-120 testing at MSFC.<\/p>\n<p>ET Project to recommend to proceed with soldering of the feed-through connector pins on both ET-125, and ET-126 in the VAB, as forward plan for mitigation, due to all results to date pointing towards the external feed-through connector hardware as the most likely cause of ECO system anomalies.<\/p>\n<p align=\"left\"><font size=\"2\">\u2018ET Project implementing design solution that mitigates most likely root cause by soldering external harness \/ sockets to feed through connector receptacle pin. <\/font><font size=\"2\">Redesign eliminates significant contributors to most likely root cause of STS-122 ECO circuit anomalies,\u2019 noted Thursday\u2019s forward plan.<\/font><\/p>\n<p align=\"left\"><font size=\"2\">\u2018Contamination \/ relative motion effects between external plug socket and feed through pins eliminated. Internal plug design unchanged as improbable contributor to anomaly \u2013 In-situ inspections \/ tests complete with no issues identified (i.e. contamination, hardware defects).\u2019<\/font><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" style=\"WIDTH: 234px; HEIGHT: 177px\" height=\"150\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=38215\" width=\"200\" align=\"left\" vspace=\"5\" border=\"0\/\">New NET Launch Date for STS-122 presented to the PRCB as Feb 8 \u2013 should they decide to conduct a tanking test. If managers decide to skip the test, they could target Feb 2. (Click image for larger version).<\/p>\n<p>The decision date for the Tanking Test option will be taken on January 21 \u2013 ultimately confirming which of the two&nbsp;NET launch date options&nbsp;will be taken for STS-122.<\/p>\n<p>At the post PRCB teleconference, John Shannon noted a January 24 launch date being protected, before backtracking and noting that if things go as expected, they wouldn\u2019t be launching before Feb 2. Schedules in Thursday\u2019s presentations do not allow for Jan 24.<em><\/em><\/p>\n<p>The above is based on several presentations reviewed by the PRCB on Thursday. A full overview article will follow on Friday.<br \/><em><br \/><\/em><font color=\"#0000ff\"><em>L2 members<\/em><\/font><em>: All documentation&nbsp;\u2013 from which the above article has quoted snippets \u2013 is available in full in the related L2 sections, updated live.<\/em><\/p>\n<p><em><font face=\"Arial\" color=\"#0000ff\" size=\"2\">**STARLIGHT: NEW STS-117 MISSION&nbsp;REVIEW&nbsp;MUSIC&nbsp;VIDEO**&nbsp;\u2013 STS-118 and STS-120&nbsp;Mission review video also available.<\/font><\/em><font face=\"Arial\"><\/font><font size=\"2\"><em>&nbsp;<\/em><\/font><\/p>\n<p><font color=\"#ff0000\">**ROCK YOU LIKE A HURRICANE: STS-117 MISSION&nbsp;REVIEW&nbsp;MUSIC&nbsp;VIDEO \u2013 AS SEEN BY THE STS-117 CREW!!**<\/font>&nbsp;-.<br \/><font size=\"1\">(<em>Video section is FREE, but you need to sign up as a member of the forum to enter the video section of the site. We only use your e-mail to send you your password. It will not be used for spam etc.)<\/em><\/font><em><\/em><em><font face=\"Arial\" size=\"2\"><\/font><\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Shuttle managers have concluded their meeting over the latest status of the troubleshooting efforts on ET-125, which is to receive new external LH2 Feed-through connector hardware, due to arrive on Friday. The PRCB was presented with a forward plan that shows the new NET (No Earlier Than) launch date as February 8 \u2013 should they [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-41513","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41513"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=41513"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41513\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=41513"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=41513"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=41513"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}