{"id":41515,"date":"2007-12-28T00:14:38","date_gmt":"2007-12-27T16:14:38","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/sts-126-set-to-carry-out-special-reentry-experiment\/"},"modified":"2007-12-28T00:14:38","modified_gmt":"2007-12-27T16:14:38","slug":"sts-126-set-to-carry-out-special-reentry-experiment","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/sts-126-set-to-carry-out-special-reentry-experiment\/","title":{"rendered":"STS-126 set to carry out special reentry experiment"},"content":{"rendered":"<p>The STS-126 mission will resume ISS operations after a break for STS-125\u2019s flight to the Hubble Space Telescope, but one of the newest additions to the mission plan won\u2019t take place until reentry.\n<\/p>\n<p>  The mission\u2019s Program Freeze Point was overviewed at the PRCB (Program Requirements Control Board) meeting earlier this month, where a Boundary Layer Transition (BLT) Detailed Test Objective (DTO) was proposed.\n<\/p>\n<p><em><img fetchpriority=\"high\" decoding=\"async\" height=\"129\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13910\" width=\"600\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/em><\/p>\n<p><em>**The most comprehensive collection&nbsp;of&nbsp;Shuttle, Ares, Orion&nbsp;and ISS&nbsp;related presentations and mission documentation, plus expansive daily processing documentation and updates&nbsp;are&nbsp;<\/em><font color=\"#0000ff\"><em>available to download&nbsp;on L2<\/em><\/font><font color=\"#0000ff\"><em>&nbsp;**<\/em><\/font><\/p>\n<p><font color=\"#ff0000\"><em><img loading=\"lazy\" decoding=\"async\" height=\"139\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=31173\" width=\"212\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/em><\/font><font color=\"#ff0000\"><em>L2: STS-122&nbsp;to STS-127&nbsp;documentation already available.<\/em><\/font><\/p>\n<p>STS-122 L2 Special NOW LIVE.&nbsp;<em><font color=\"#0033ff\">**Click&nbsp;here for sample of L2 menu and content**<\/font><\/em><\/p>\n<p><em><font color=\"#ff0000\" size=\"3\"><\/font><font size=\"2\">**STS-122 Special: 12 MOD Flight Readiness Review (FRR) Presentations, Baselines and Mission Overviews. 17 Shuttle FRR Presentations. Payload Presentations and vast amounts of live, uploaded images and presentations. Installation Movies (several)&nbsp;\u2013 already 1700&nbsp;megabytes strong** <\/font><\/em><\/p>\n<p>**COMPLETE Section on ECO\/Feedthrough Connector issues and troubleshooting, graphical and data based \u2013 expansive.**<\/p>\n<p><font color=\"#0000ff\" size=\"3\"><em>**LIVE updates on Atlantis&nbsp;STS-122 Troubleshooting Latest**<\/em><\/font><\/p>\n<p><font color=\"#0000ff\"><em>**LIVE updates on Discovery STS-124 Processing**<\/em><\/font><\/p>\n<p><em><u><\/u><\/em><\/p>\n<\/p>\n<\/p>\n<p>&nbsp;<em><font color=\"#0000ff\">**LIVE news updates on&nbsp;Endeavour&nbsp;STS-123 Processing**<\/font><\/em><\/p>\n<p>**Click here for FRR&nbsp;overview articles: Article 1 \u2013 Article 2**&nbsp;&nbsp;\u2013 Click *HERE* for all our articles on the STS-122 ECO\/Feedthrough Connector&nbsp;issue.<\/p>\n<p><!--StartFragment --><\/p>\n<p><em><u>Main article:<\/u><\/em><\/p>\n<p style=\"MARGIN-BOTTOM: 0cm\">During re-entry, the compression of air on the leading edge of the space shuttle forms a protective \u2018blanket\u2019 around the orbiter. Temperatures within that region are a manageable 2-3,000 degrees, while just a few inches away the full force of heating results in readings of up to 10,000 degrees. <\/p>\n<p style=\"MARGIN-BOTTOM: 0cm\">As long as the orbiter\u2019s surface is smooth, the boundary layer keeps tile heating within the limits of their design, but any interruption in the air flow causes a boundary layer \u2018trip\u2019 where turbulence behind the trip point brings in the extreme heat to the tiles, and could cause tile failure and\/or damage to the underlying surface.<\/p>\n<p style=\"MARGIN-BOTTOM: 0cm\">Picture a smooth flowing river and water moving uniformly downstream, then place a large rock in the middle and you\u2019d observe the water behind the rock swirling around. Everything ahead of the rock stays in a steady state, but the water past the rock is very turbulent. <\/p>\n<p style=\"MARGIN-BOTTOM: 0cm\">When the shuttle team finds a gap filler or tile damage on the underside of the orbiter, they have to determine if that \u2018change in smoothness\u2019 will trip the boundary layer, at what speed it will be impacted, what sort of temperatures will impinge upon the tiles, and what damage (if any) will result. <\/p>\n<p style=\"MARGIN-BOTTOM: 0cm\">Unfortunately there is very little research into this area. There are a lot of computer simulations, but very little actual experiments to validate the models.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" style=\"WIDTH: 205px; HEIGHT: 147px\" height=\"130\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13815\" width=\"200\" align=\"left\" vspace=\"5\" border=\"0\/\"><font face=\"Verdana\" color=\"#0000ff\"><em>**Ride home through the fire,&nbsp;sparks&nbsp;and plasma of re-entry with Atlantis, Discovery and Endeavour.&nbsp;FIVE&nbsp;Stunning high quality&nbsp;2hr, 355-400mb Camcorder and HUD videos \u2013 from payload bay closure \u2013 through re-entry with an&nbsp;astronaut held camcorder video \u2013&nbsp;to post landing \u2013 several more videos showing landing from 90,000 ft also available and HUD videos from STA landings. Now includes HALO II Re-entry video, and re-entry videos from Gemini and Apollo (converted from 8mm)**<\/em><\/font><\/p>\n<p>The orbiter involved, Endeavour,&nbsp;<!--StartFragment -->is multi-tasked with STS-326 rescue support for STS-124, will also be the last shuttle to sit on launch pad 39B as STS-400 \u2013 the rescue support for STS-125\u2019s Hubble mission \u2013 and will be the heaviest logistics flight ever, STS-126, carrying supplies \u2013 including a new six-crew Galley \u2013 to the ISS.<\/p>\n<p>As noted in the expansive 81 page presentation \u2013 available to download on L2 \u2013&nbsp;STS-126 is proposed to be the first mission with a specific test installed to measure the impacts of a boundary layer transition, with the DTO <font face=\"Arial\" size=\"2\">utilizing <\/font>a specially designed tile to \u2018trip\u2019 the boundary layer \u2013 along with instrumentation underneath tiles downstream that would measure any thermal impacts.<\/p>\n<p style=\"MARGIN-BOTTOM: 0cm\"><img loading=\"lazy\" decoding=\"async\" height=\"108\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=38013\" width=\"239\" align=\"right\" vspace=\"5\" border=\"0\/\">A specially designed \u2018trip tile\u2019 will be installed near the main landing gear door, with a roughly one-quarter inch protuberance, to trip the boundary layer at speeds less than or equal to Mach 15. <\/p>\n<p>Current DAT&nbsp;(<!--StartFragment -->Debris <font face=\"Arial\" size=\"2\">Analysis <\/font>Team) assessments have cleared the orbiter up to Mach 18. so it\u2019s been classified as a low risk to mission safety. <\/p>\n<p style=\"MARGIN-BOTTOM: 0cm\">Thermocouples will be installed underneath the tile on the left-hand wing and downstream of the trip tile to measure the specific temperatures during reentry.<\/p>\n<p style=\"MARGIN-BOTTOM: 0cm\"><img loading=\"lazy\" decoding=\"async\" height=\"150\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=38012\" width=\"216\" align=\"left\" vspace=\"5\" border=\"0\/\">The tile is being installed in a location where studies show that even a very large break in the boundary layer will not be a concern. If Arcjet testing of the setup \u2013 scheduled for mid-January \u2013 shows any reason for concern, the tile can be removed late in the OPF (Orbiter Processing Facility)&nbsp;flow if necessary. <\/p>\n<p style=\"MARGIN-BOTTOM: 0cm\">Since Return To Flight, there have been 1093 hits to the bottom of the orbiter, but only one in this area \u2013&nbsp;so additional damage during launch is not expected. Ten thousand simulations of foam debris striking the area produced no critical damage in any.&nbsp;<\/p>\n<p>However,&nbsp;if something does happen, that would make the test an issue on flight, EVA tools and techniques have been tested in case the protuberance needs to be removed.<\/p>\n<p style=\"MARGIN-BOTTOM: 0cm\">Future plans call for installing the thermocouples on Discovery as well, and beginning her testing with a half-inch protuberance on STS-127 \u2013 for a transition closer to Mach 18. The last test in Phase I is a three-quarter inch notch on STS-128, which would transition at Mach 19. <\/p>\n<p>Phase II testing will add a catalytic coating material on one of the tiles which would gather catalytic \/ turbulent heating interaction data. <\/p>\n<p style=\"MARGIN-BOTTOM: 0cm\">Two additional flights are on the manifest through the end of the shuttle program \u2013 based on current manifest&nbsp;\u2013&nbsp;which are currently being penciled in as contingency flights for this experiment.<\/p>\n<p style=\"MARGIN-BOTTOM: 0cm\">The overall goal is not just to help shuttle operations. There is little understanding of boundary layer transitions, and the data from this experiment is expected to strongly impact development of computational techniques. <\/p>\n<p>The results will impact many other thermodynamic interests in the aerospace fields.<br \/><em><br \/><\/em><font color=\"#0000ff\"><em>L2 members<\/em><\/font><em>: All documentation&nbsp;\u2013 from which the above article has quoted snippets \u2013 is available in full in the related L2 sections, updated live.<\/em><\/p>\n<p><em><font face=\"Arial\" color=\"#0000ff\" size=\"2\">**STARLIGHT: NEW STS-117 MISSION&nbsp;REVIEW&nbsp;MUSIC&nbsp;VIDEO**&nbsp;\u2013 STS-118 and STS-120&nbsp;Mission review video also available.<\/font><\/em><font face=\"Arial\"><\/font><font size=\"2\"><em>&nbsp;<\/em><\/font><\/p>\n<p><font color=\"#ff0000\">**ROCK YOU LIKE A HURRICANE: STS-117 MISSION&nbsp;REVIEW&nbsp;MUSIC&nbsp;VIDEO \u2013 AS SEEN BY THE STS-117 CREW!!**<\/font>&nbsp;-.<br \/><font size=\"1\">(<em>Video section is FREE, but you need to sign up as a member of the forum to enter the video section of the site. We only use your e-mail to send you your password. It will not be used for spam etc.)<\/em><\/font><em><\/em><em><font face=\"Arial\" size=\"2\"><\/font><\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The STS-126 mission will resume ISS operations after a break for STS-125\u2019s flight to the Hubble Space Telescope, but one of the newest additions to the mission plan won\u2019t take place until reentry. The mission\u2019s Program Freeze Point was overviewed at the PRCB (Program Requirements Control Board) meeting earlier this month, where a Boundary Layer [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-41515","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41515"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=41515"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41515\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=41515"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=41515"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=41515"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}